Loading…
Loading…
18,007 results • Latest
Estimate for renovation of Parks near H. No. - 885, 907,821,745 and Green Belt near H.No. - 555 in Sector-45 Ward No - 24 Under MCG. Recall
Annual Repair Estimate for 9 Nos. 450 Sft. 9 Nos. 650 Sft. 12 Nos. 800 Sft area Houses in PD BandR Colony at Kaithal for the year 2026-27.
Pdg. AMC of 125 KVA silent DG set in for Govt. Ayurvedic College/ Hospital at Narnaul for the year 2026-27.
wbm, tack coat, premix carpet etc.
Annual Repair Estimate for Superintending Engineer s Residence in PWD BandR Colony at Kaithal for the year 2026-27.
Construction of ADR Centre at Rewari District (Pdg. Additional Air Conditioners only)
Providing laying 100 mm dia. Water supply line, 250mm dia. RCC sewer line in Prajapati Wali Gali Mujessar and P/L of 80mm thick interlocking tiles in Prajapati wali Gali, Rajkumar gali to mohan h/o and lamba wali gali mujessar in W. no.3, Ballabgarh.
Construction of community chopal at Aheria Basti in ward no. 28 Old Faridabad.
WBM, Tack coat and premix carpet etc.
Annual Repair Estimate of PWD Rest House at Kaithal for the year 2026-2027.
Rough cost estimate for repair of 450mm dia. Sewer line and sewer manhole in Sector-3 bypass greenbelt backside of govt. School near Sector-3 disposal in Ward No. 40, Ballabhgarh.(Recall)
Construction of pavement in BPL Colony No.2 Construction of pavement in BPL Colony No.2
Rough cost estimate for providing and laying of precast slab on milk plant road nallah and sihi road nallah,Malerna road nallah , ajji colony nallah in ballabgarh division
Rough cost estimate for providing and laying of precast slab on mohna road nallah from akash cinema to bhateja mandir in ballabgarh division
Estimate for Providing and Laying 80mm thick M-40 grade interlocking tiles in front of Indoor stadium and in front of Hanuman Mandir in Sector-22 in Ward No. 04, Ballabgarh.
Estimate for P/L 200mm dia. S.W. Sewer line, 100mm dia. PVC water supply line and RMC M-25 grade with 80mm thick M-40 grade interlocking tiles both side in Gali No. 46-47 33ft. road, Sanjay Colony in Ward No. 04, Ballabgarh. (Recall)
REMOVAL OF MESQUITE IN 30 HECT. SCATTERED OUTSIDE THE WATER BODY IN SULTANPUR NATIONAL PARK DISTRICT GURUGRAM
Modification of the life science lab in the 4th floor of the New MBA Block Building in the J.C. Bose University of Science and Technology YMCA Faridabad.
Estimate for renovation of the office for Executive engineer of villages and Div-5 in Old MCF Zone Building in sector 19, ward 31 Old Faridabad. (Recall)
Whitewashing and Painting Work in Kasturba Gandhi, Sarojini, Kalpana Chawla Blocks, Mother Teresa Block, Toilets, Corridors, Mess and Gym Area of Old Girls Hostel Building in the University.
Providing unskilled manpower for operation and Mtc. of various channels during the flood season 2026-27
Construction of Limited Height Subway (LHS) on Hisar Sadalpur Track at Km. 06/0-2 on road from Gangwa to Kaimri Near Shaishav Kunj in Hisar District. (CMA No. 27834 dt. 20.07.2024) (Pdg. Shifting of 11 KV HT Lines only)
Construction of Limited Height Subway (LHS) on Hisar Sadalpur Track at Km. 06/0-2 on road from Gangwa to Kaimri Near Shaishav Kunj in Hisar District. (CMA No. 27834 dt. 20.07.2024) (Pdg. Shifting of HT/LT Lines only)
Construction of 4 Lanning from Hisar Raipur Road (Section Kenchi Chowk to Sector 1 and 4) RD 0.00 To 0.680 in Hisar Distt. (Repair of Street Light) (Balance work)
Construction of MODEL ROAD FROM AGRA CHOWK TO END OF THE SHARDHANAND PARK ( BOTH SIDE) IN MC PALWAL
Installation of tubewell (in lieu of Abandoned tubewell)
CONSTRUCTION OF AMBEDKAR BHAWAN AT VILLAGE- JHOJHU KALAN
Construction of SUB HEALTH CENTRE at village Bhandwa
Empanelment of firm to provide vehicles on Rate Contract (Duration 03 years)
Construction of Parshuram Bhawan at village Bijna Jhojhu Kalan
Construction of Sub Health centre Badhwana
Construction of Sub Health Center at village Mehra
Installation of gate and gearing system at head regulator and brick lining RD. 0 to RD. 130 of Bhagsar Minor (Floody).
Providing and lying of RCC Pipe from Shiv Mandir Road to Machaunda Road and side adjoining street in chanderpuri ward no-22 MC Ambala Sadar
CONSTRUCTION OF GRAM SACHIVALAYA AT VILLAGE MAKRANI
Construction of Sub health center at village Kakroli Sardara
OPERATION , MAINTENANCE AND UPKEEPNG OF STREET LIGHTS IN MUNICIPAL COMMITTEE CHEEKA AREA
Construction of Storm Water Drain at village Badha Ward no 20 under MC Manesar.
Construction of Block public helath unit BPHU at Village Gopi
Construction of Sub Health Center at village Chirya
Completion of Rohilla Taak Shetriya Sabha Dharamshala ward no. 14 in MC Safidon under VANGY for year 2025-26.
RFP for Door to Door collection, segregation, transportation as well as processing of waste.
Construction of Park from H no 209/467 to 475 Hudda R-3 in ward no 8(Recall)
Const. of Sub Health Centre Barsana
Construction of CHC Lakhanmajra in Distt. Rohtak
ESTIMATE FOR INTERNAL CLEARANCE AND DEWEEDING OF PAI DISTY FROM RD 1600 TO 42200 BEFORE RABI 2026-27.
Special repair of Circuit House at Rohtak.
Estimate for internal clearance of Ganaur Disty from RD 17350 to 41760 and 1-L-Samalkha Minor from RD 41700 to 55890 before Kharif season 2026-27.
Construction of Ambedkar Bhawan At Village- UNNEAR BADHWANA, Block-Jhojhu Kalan (Jan Sanwaad)
DEVELOPMENT OF PLANTATION WORK OF SAHAANPUR YAMUNANAGAR LADWA KURUKSHETRA PEHOWA ROAD (SH-06) FROM KM. 85.00 TO 90.00 (ROAD ID-8023) IN KURUKSHETRA (PEHOWA cONSTITUENCY)