Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
4,678 results • Latest
Providing and fixing of cat eyes Sector-18 Panipat
A Mtc of EPHS in Sector 3 UE Kurukshetra Repair of 25HP Submersible motor pump and providing and fixing of dozer cable gravel NRV and sluice valve at various tubewell complete in all respect and all other works contingent
A Mtc of EPHS in Sector 2 UE Kurukshetra Providing and fixing of panel board and repair of 25HP Submersible motor pump and 15 HP Non Clog Sewerage motor pump and 2 HP Sewage Motor and cable complete in all respect and all other works contingent
KTL-1 Amtc of EPHS in various sector UE Kaithal.
KTL-1 Amtc of EPHS in various sector UE Kaithal.
KTL-1 Amtc of EPHS in various sector UE Kaithal.
KTL-1 Amtc of EPHS in various sector UE Kaithal.
KTL-1 Amtc of EPHS in various sector UE Kaithal.
KTL-1 Amtc of EPHS in various sector UE Kaithal.
Hiring of super sucker machine for removal blockage and desilting of 90mm dia sewer line, rising of manholes
Providing and fixing of interlocking tiles around the Yoga Shed
Providing and Fixing of Barbed wire fencing 5 Nos. Horizontal with RCC pole Height 1.80m in Green belt Sec-61, Faridabad. Including 03 Years of Mtc. as defect liability period free of cost for Civil work.
Cleaning of jungle and hiring of JCB from HMT road to Cremation Ground Sector 29, Pinjore (A/Mtc. of PH Services in sector 1 to 6 MDC and Sector 23 to 28, 31 and 32, Panchkula Extension)
Supply and laying of Shelmac PR, Shalmax-PR for repair of pothole due to damage of heavy rain in sector 2 and 6 MDC, Panchkula (A/Mtc. of PH Services in sector 1 to 6 MDC and Sector 23 to 28, 31 and 32, Panchkula Extension)
A/mtc of roads in Sector-62, Faridabad. Construction of Entry Point including GRC Tile, Chequered tile, Brick work etc. in Sector-62, Faridabad complete in all respect and all other works contingent thereto.
Construction of 6 Nos. Rain Water Harvesting in Greenbelt along Sector-64 D, Mohna Road to Chahal property Chowk, Faridabad complete in all respect and all other works contingent thereto.
Construction of Parking with M10, GSB, Construction of Tow wall etc along Gymkhana Club in Sector-21C, Faridabad complete in all respect and all other works contingent thereto. (Including 3 years maintenance and defect liability period free of cost)
Providing and fixing of 200 KVA T/F, 11 KV HT line, LT line and solar high mast in newly arved out shopping centre in HSVP sector-3 (Part-I) Rewari and all other works contingent thereto (including 6 years DLP of T/F and 5 year DLP of LED solar light
Appointment of Technical Consultant for Preparation of DPR with detail of quantities Construction of HSVP Office Complex in Sector-16 Gurugram
Operation and Maintenance of 2 MLD STP based on FAB technology in Sector 7 UE Ambala
Providing balance transformers, 11 KV lines and Street lights in Integrated Housing Scheme, Sector-5 at Hansi. Including 6 years defect liability period for transformers and 3 years mtc. and defect liability period for all other items free of cost. R
Writing of serial numbers on balance L.T. PCC Poles including painting of background and supply and erection of 25 watt and 72 watt LED street lights in various sectors at Hisar and all other works contingent thereto. Including 3 years defect liabili
AMtc of EPHS in Sec 34 UE Ambala Cantt Relaying of Krab and Providing and laying Of CC complete in all respect and all other works contingent thereto
Job No 18 A/mtc of L/s work in .....
A/mtc of L/s work in green belt in sector-4, Karnal for the year 2025-26.(Prunning , trimming of trees in sector-4, Karnal and all other work contingent thereto.)
Job No 3 A/mtc of L/s work in Mandi ...
KTL-2 A/Mtc. of EPHS in various sector UE Kaithal.
K-2 A/mtc of EPHS in various Sector UE Karnal
Repair and mtc. of staff quarter No.2B (first floor) Sector 25, Panchkula Extension (A/mtc of PH services in Panchkula Extension).
K-3 A/Mtc. of EPHS in various Sector UE Karnal
KTL-2 A/Mtc. of EPHS in various sector UE Kaithal.
KTL-2 A/Mtc. of EPHS in various sector UE Kaithal.
KTL-2 A/Mtc. of EPHS in various sector UE Kaithal.
Upgradation and Special Repair of Atal Park in Sec-2, Fbd, inclu. Construction of Synthetic Track, Installation of Fountain, Construction of Main Entry Gate and Other Allied Civil and Beautification Works Inclu 3 Year mtc. and Defect Liability Period
Relaying of damaged sewer line, water supply line, cleaning of sewer line, repair and mtc of public utility services, Construction of RMC parking and central verge, Beautification of entry points etc. in Transport Nagar, Sec-58, Fbd.
KTL-2 A/Mtc. of EPHS in various sector UE Kaithal.
K-3 A/Mtc. of EPHS in various Sector UE Karnal
KTL-2 A/Mtc. of EPHS in various sector UE Kaithal.
KTL-2 A/Mtc. of EPHS in various sector UE Kaithal.
KTL-2 A/Mtc. of EPHS in various sector UE Kaithal.
Job No-39 A/mtc of L/s work in Sector...
KTL-2 A/Mtc. of EPHS in various sector UE Kaithal.
KTL-2 A/Mtc. of EPHS in various sector UE Kaithal.
K-3 A/Mtc. of EPHS in various Sector UE Karnal
K-3 A/Mtc. of EPHS in various Sector UE Karnal
KTL-2 A/Mtc. of EPHS in various sector UE Kaithal.
K-3 A/Mtc. of EPHS in various Sector UE Karnal
K-2 A/mtc of EPHS in various Sector UE Karnal
K-2 A/mtc of EPHS in various Sector UE Karnal
K-3 A/Mtc. of EPHS in various Sector UE Karnal