Loading…
Loading…
4,733 results • Latest
Annual Maintenance Estimate for Sewerage Scheme in Sector-3, Rohtak for the year 2025-26
Annual Maintenance Estimate for Sewerage Scheme in Sector-4(Extn.), Rohtak for the year 2025-26
Annual Maintenance Estimate for Sewerage Scheme in Sector-1, Rohtak for the year 2025-26.
Annual Maintenance Estimate for Sewerage Scheme in Sector-2, Rohtak for the year 2025-26.
A/mtc of L/s work in Sector-20, Part-II and 21 Part-III Panchkula for the year 2025-26.(Supply and planting of seasonal flowers etc in park area and all other work contingent thereto.)
A/mtc of L/s work in Sector-1,MDC Panchkula for the year 2025-26.(Uprooting of rank and woody vegetation, grass ,inequalities etc. and all other work contingent thereto.)
A/Mtc of L/s work in HSVP Nursery , Industrial area Ph-I ,Panchkula for the year 2025-2026 (Supply of cylindrical earthen pots and all other works contingent thereto)
AMtc of EPHS in Sector 34 Urban Estate Ambala Cantt Clearing Jungle including uprooting of Rank Vegetation grass brust wood in Sector 34 Urban Estate Ambala Cantt complete in all respect
Providing and Fixing of Chlorine Mixture and Supplying and Jointing of 10 Sqmm Submersible Cable MCCB etc. complete at Water Works in Sector 20 Panchkula
Repair of HSVP Staff Qtr. No.2864 A and other various Staff Qtrs. in HSVP Colony in Sector 15 Panchkula including mtc. and defect liability period of one year free of cost.
A/mtc estimate of sewerage scheme in sector-15A, Hisar for the year 2025-2026.
A/mtc estimate for sewerage scheme of sector- 13P Hisar for the year 2025-2026.
ANNUAL MAINTENANCE OF SEWERAGE SCHEME IN URBAN ESTATE-II HISAR (INCLUDING HOUSING BOARD COLONY, VIDYUT NAGAR) HISAR (2025-26) (iii)
ANNUAL MAINTENANCE OF SEWERAGE SCHEME IN RESIDENTIAL AREA MANDI TOWN BHIWANI 2025-26 (ii)
Providing and laying of 300mm SW Pipe of sewer line from housing board area to MPS in Sector-13 Bhiwani
A/Mtc estimate of main water works Sector-3, Hisar for the year of 2025-26
A/mtc estimate of water supply and sewerage scheme of sector- MGA, Hisar for the year 2025-2026.
Special repair of Boosting station / staff qtr. at sec 9 jind . Repair of flooring ,plaster , wood work and bricks , paint ,etc.
Annual maintenance estimate of Roads, Water Supply, Sewerage and SWD Scheme in Sector 9A,10and 11P Mahendergarh for the year 2025-26
Annual maintenance estimate of Water Supply Sewerage and SWD Scheme in Sector 19 Rewari for the year 2025 2026
Annual maintenance estimate of Water Supply Sewerage Scheme in Sector 3 Rewari for the year 2025 2026
Annual maintenance estimate of Master Water Supply Scheme in U/E Narnaul for the year 2025-2026
Annual maintenance estimate of 5 MLD STP at Dharuhera for the year 2025-2026
Annual maintenance estimate of master road in urban estate Dharuhera for the year 2025 to 2026
Annual maintenance estimate of Water Supply, Sewerage Scheme in Sector-4A, Dharuhera for the year 2025-2026
Annual Maintanence Shopping Centre Sector 5 Rewari
Annual maintenance estimate of Water Supply Sewerage and SWD Scheme in Sector 18 Rewari for the year 2025 2026
Rough cost estimate for construction of balance 12 mtr. wide road along 132 KV sub station in sector-9, Jind.
Development of green belt in Sector-2,3 and 4 Kurukshetra (Providing and fixing of barbed wire fencing with RCC Poles in green belt area etc and all other works continegent thereto)
Annual Maintenance of old Mata Mansa Devi road near Gandhi colony MDC area all other works contingent thereto (A/mtc of PH services in Sector 5C, MDC, Panchkula)
Annual Maintenance Estimate of Sewerage Scheme in Secor 21and26 Bhiwani For The Year 2025-26.
A/mtc of Water Supply and Sewerage Scheme in Sec-23, Bhiwani for the year 2025-2026.
Construction of 2 Nos. Rain Water Harvesting System Sector-7-8 Panipat.
Providing and Laying of Pumping Machinery, Construction of Pump Chamber, Construction of Boundary Wall and Raising Main
Construction of Parking/Pavement, Providing and Laying of Water Supply, Sewerage and SWD Line in Commercial Site, Sector-110A, Gurugram.
ANNUAL MAINTENANCE OF INTERNAL WATER SUPPLY SCHEME IN SECTOR-1and4 HISAR (2025-26)
Annual Maintenance Estimate of Sewerage Scheme in Secor 21and26 Bhiwani For The Year 2025-26.
A/mtc of estimate for water supply sector- 3,4P-(II)and5,Hisar for the year 2025-2026.
A/mtc estimate of water supply and sewerage scheme of sector- MGA, Hisar for the year 2025-2026.
Annual Manitenance Estimate Of Sewerage Scheme In Sector-16 and 17 Phase-I, Hisar For The Year 2025-2026.
Annual Maintenance of all Horticulture works for grassy lawn in Civic Park Residential Area, M.T.S. Bhattu for the year 2025-2026.
Annual Maintenance of all Horticulture works for grassy lawn in Ch. Tau Devi Lal Town Park, M.T.S. Bhattu for the year 2025-2026.
flush door, pipe sanitary item and plumbing works
Shifting of L.T. / H.T. poles away from main gate area of plots Shifting of L.T. / H.T. poles away from main gate area of plots
Annual Maintenance of all Horticulture works for grassy lawn in M.T.S. Bhattu for the year 2025-2026.
Shifting of LT/HT poles, lines and transformers away from main gate area of plots in various sectors of HSVP Sonepat (IDC) (Excluding GST)
Prov. 200KVA T/F, HT/LT line and LED street lights on T-points in Auto Market, Sector-3, Sonipat
ROUGH COST ESTIMATE FOR DEVELOPMENT OF LANDSCAPE WORK IN THE PARK ADJOINING RAVI DASS DHARMARTH SABHA/ RELIGIOUS BUILDING IN SECTOR - 33 P-I, HISAR
Annual Maintenance Estimate of Horticulture works in sector-33P-I, Hisar for the year 2025-2026.
Annaul Maintenance estimate for main water works in Sector-1, Rohtak for the year 2025-2026.