Loading…
Loading…
1,585 results • Latest
Construction of link roads / allied links from Reyaz Ah Wani, Shaheen Ahmad , Nasrullah, Mushtaq Ahmad Shaheen Yatoo upto Ring Road bridge and Main Road to Mehrajudin Yatoo, Mohd Altaf at Rambirgarh
Upg/ construction of balance portion of road surface at Azad Colony Batapora A bwo nallah muck/ khak bajri filling and WBM Grade 2nd
Upgradation of road from Mehboob-ul-Alam links Shelteng Maloora by way of p/l of Grade Work
Construction of various links/ lanes at Kumar Mohalla Khushipora HMT Phase 1st
Construction of Tiling Path from Masjid Hussaini to Ghulam Rasool Kand at Kand Mohalla Mir Behri Dal
Upgradation of Lane and Drain from H/o Ghulam Hassan Dar to H/O Muqaam Building at Khankahi Sokhta, SafaKadal
Repair and Renovation of Lane from H/o Parvaiz Ahmad Dar to Tariq Ahmad Lone at Lone Mohalla Nowpora Ward No.45
Construction Of Path/Lane From Main Road To H/O Gulam Hassan Akhoon,
Construction Of Culvert at Gadda Mohalla Mir Behri Dal
Construction of culvert at Joo Mohalla, Kobutar Khana, Nehru Park
Construction of lane and drain from shopkeeper Ali Muhammad Bhat upto Bilal Ahmad Sofi (Waza Kocha) at Rathpora Ward 50
Construction Of Footpath At Akhoon Mohalla Kalan Lati Mohalla
Construction Of The Lane Concreting Bhat Mohalla Moti Mohalla Mir Behri Dal
Construction Of Lane Concreting From The Main Road To Ho Md. Akbar Zawar at Moti Mohalla-B Mir Behri Dal.
Construction Of Footpath from H/O Khooli Mohalla To Livard Batpora
Construction of Lane near the H/o. Abdul Qayoom Khan at Shivpora A
Construction of Lane/Drain from the H/o. Ghulam Hassan Naikoo to Showkat Ahmed Bhat at Shivpora
Construction of Lane/Drain from the H/o. Abdul Ahad to H/o. Fayaz ahmed wani at Shivpora
Construction Of 2 Small Culverts At Bhat Mohalla Moti Mohalla
Repair/renovation of wooden culvert near Fisherman Colony at Khonkhan Nai Sadak 45 Doulatabad
Construction Of Surface Drain (Nali) At Kakazgari Mohalla Lakhripora Nowshara
Construction of lane/drain at Kocha Faqeer Mohammad Khan at K.K Sokhta Nawakadal
Upgradation of lane from H/o Ab Rashid Bhat upto H/o Shabir Ah Wani at Chandihar Wanganpora
Upgradation of Lane and Drain from H/o Manzoor Ahmad Bhat to H/o Ghulam Ahmad Malik 2.35 at Safakadal. Sr. No.3-E
Construction of lane from H/o Mohammad Shafi Narwari upto H/o Ghulam Mohammad Hanji and Hilal Ahmad at Pamposh Colony Ward 52
Construction of path from H/o Muhammad Maqbool upto Khursheed Ahmad Laway at Pamposh Colony Ward 52
Construction of lane near H/o Mohammad Subhan Langoo AND (Sahaba) at Pamposh Colony Ward 52
Construction Of Surface Drain At Khan Mohalla Chanapora Nowshera
Construction of lane AND drain from the Pump Shed to H/o Ab Majid Bhat AZND others at Lal Ded Colony Zewan
Repair of surface drain from H/o Mohd Sidiq Shah to Ab Rahim Rather at Gousiya Lane near Masjid Ibrahim Zaffron Colony
Construction of lane drain from late Ab Rehman Sofi via H/o Muhammad Ramzan Sofi upto Muhammad Sultan Sofi Rathpora Ward 50
Upgradation of lane/drain from h/o Khazir Ahmad Wani to h/o Gh Rasool Najar incl. tiling at Wanganpora.
Improvement of lane/drain from h/o Bilal Ahmad Bhat to h/o Mohd Maqbool Khanday near Masjid Abu Hanifa(RA) Braiwar street.
Upgradation of pipe drain from H/o Ratan Lal upto H/o Imran Ahmad at Kantaparistan, Khankah-i-Soqhta near Police Station Safakadal
Const of lane/drain at Pamposh Colony Wanganpora.
Construction of lane/drain near H/o Asif Ah Sheikh and Gh Qadir Sheikh at Koond Mohalla Noorbagh
Construction of lane near H/o Bashir Ahmad Daga to Tariq Ahmad at Bund Road Pamposh Colony Ward 52
Re-construction of tile path from h/o Nazir Ahmad to Mehraj -ud-din at Mehboob Colony Hawal.
Upgradation of lane and drain drain the H/o Imtiyaz Ahmad Sofi via Abdul Rahim Dar upto H/o Habibullah Bhat at Shaheen Mohalla Noor Bagh, Rathpora
Construction of lane/drain from H/o Manzoor Ah Mir to Ab Rashid Mir at Gusoo
Construction of tile lane NHO Khursheed Ahmed Rather Abdul Karim Rather, Ali Mohd Rather, and others at Rather Mohallah Shuperbagh, Chatterhama.
Construction of link road from main road to H/o Javid Ah Wani AT Gusoo B
Construction of lane by way of concreting from Darzgah to H/o Gh Hassan Bhat at Doud Mohalla Shalimar
Construction of lane and drain from H/O Nazir Ahmed Wani up to Gh. Rasool Mir at Friends Colony, Harwan
Construction of lane/drain from Ghulam Muhammad Dar upto Mushtaq Ahmad Sofi near Government Middle School Gulshan Abad Rathpora Ward 50
Construction of R-Wall from road near H/o Bashir Ahmad Dar via H/o Muhammad Ramzan Dar and others at Chetterhama W-73 Phase-3rd
Construction of chain link fencing around graveyard at Batapora Bala
Chain Link Fencing around Graveyard at Sheikh Mohalla Habak
Construction of lane from H/o Bashir Ahmad Shaikh upto H/o Fayaz Ahmad Shaikh at Pamposh Colony Ward 52
Reconstruction of lane from H/o Farooq Ahmad, Mohd Yaseen and Ali Mohd Derzie and others at Zari Pora Zoonimar