Loading…
Loading…
155 results • Recent activity
Construction of Long-Term Remedial measures of Landslide/River cut/bank erosion at identified locations between PANDOH TO KULLU on Kiratpur-Manali Section of NH-03 (Old NH-21) in Himachal Pradesh on EPC Mode
Construction of 4 lane Greenfield Section of NH-33 from Mokama (Design Ch. 0.000) to Munger (Design Ch. 82.400) in the State of Bihar on Hybrid Annuity Mode
Const. of 6L AC Spur connectivity start. Ch. 15.100 of Ambala Chandigarh sec of NH205 A and terminating at Ch. 2.500 of Zirakpur Bypass TL 10.300 Km under NH(O) in Punjab on Hybrid Annuity Mode.
Const of 6L EC at Pigdambar Chauraha Km14.235 and Medicaps Km13.430 LVUP at Sirsodiya Junc at Km61.660 Flyovers at Dhanmod Bypass Km65.455 and Dhanmod Bypass End Km73.495 under road safety improvement on Indore Khalghat Sec of NH52 in MP on EPC mode
Consultancy Services for Preparation of Detailed Project Report (DPR) of 4-laning of Jabalpur-Mandla-Chilpi section of NH-30 in the State of Madhya Pradesh
Construction of VUP/VOP at (i) Swami Chincholi (Ch. 97.370.000) (ii) Dalaj (Ch. 109.985) on Pune-Solapur (NH 65) from km. 40.000 to km.150.050 in the state of Maharashtra on EPC mode.