Loading…
Loading…
155 results • Recent activity
Construction of 6 Lane Elevated corridor from KM 698.600 to KM 699.900 section of NH48 including construction of slip roads service roads in Umbraj City. (Descoped work of Kagal Satara Package2) in the state of Maharashtra on EPC Mode.
Const. of LVUP at Ch.286.680 with Sr.Road on NH18 at Phuldungri and VUP at Ch.332.518 in front of Baharagora Bus Stand on NH18 and Flyover at Ch.218.957 with Sr.Road at merging point of NH-43 and NH-32 (New NH-18) in Jharkhand on EPC Mode
CS for Prep. of DPR for Upgrad. of exist. road connect NH 548A n NH753F from 2L to 6L till NH66 to both sides Agardanda side n Dighi Side b Bridge over creek near Waral connecting both Terminal Access road in Maharashtra
Construction of 6 Lane Elevated corridor from KM 593.766 to KM 596.400 including construction of slip roads service roads in Kagal City. (Descoped work of Kagal Satara Package1) in the state of Maharashtra on EPC Mode.
Elevated Kagal Satara Const. of 6L EC from KM 612.582 to KM 617.540 incl. const. of flyover towards Kolhapur City on NH48 in FAZ of Kolhapur Descoped work of Kagal Satara PKG1 Second level Ramp KM 0.000 to KM1.263 in MH on EPC mode.
Const. of 6L EC from KM 12.695 to KM 14.100 in Kuwarbav sec of NH166 Descoped work of Ratnagiri Package1 in the state of Maharashtra on EPC Mode