Loading…
Loading…
10 results • Latest
Construction of Retaining wall Around Gadakufer Lake at U-85 GadaKufer
[Earth work in excavation by mechanical means (Hydraulic excavator)/manual over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Divisional Forest Officer, Theog. All Kinds of soil] Retaining Wall Foundation
Construction of Range Office Bijhari, Bijhari Range of Hamirpur Forest Division during 2025-26
CIVIL WORKS Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, complete including carriage of material in all leads and lifts as per direction of the Engineer in Charge. All kinds of soil.
Construction of Forest Guard Hut at Kaldoo in Kaldoo beat, Durgapur Block, Sarkaghat Range under Suket Forest Division, Sundernagar during 2025-26.
C/o Fgd Hut Kaldoo
Construction of Fgd Hut Awar, Patta Block, Kuthar Range under Kunihar Forest Division.
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.
Construction of BO Quarter Patta, Patta Block, Kuthar Range under Kunihar Forest Division.
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.
Construction of Fgd Hut Manlog, Darlagaht Block, Darlaght Range under Kunihar Forest Division.
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.