Loading…
Loading…
5 live3 closing this weekmost from Himachal Pradesh Power Corporation Ltd
5 results • Latest
Carrying out 5 Nos Footing load test on River bed material RBM of Giri river with load applied upto 70 tonne m2 on the reinforced concrete footing of size 150 cm x 150 cm complete in all respect for Renukaji Dam Project, Distt Sirmaur HP.
Design, Supply, Construction and Erection, Testing, Commissioning and Operation and Maintenance For 15 Years of 6 MW AC Tihra Khas-I Solar Power Project with 2.1 MW / 4.2 MWH Battery Energy Storage System at Tihra Khas in District Una of Himachal Pradesh
Repair and maintenance of an approach road and its branches in HPPCL Colony at Hatkoti length 1225 mtr in respect of Sawra Kuddu HEP 111 MW, HPPCL,Hatkoti Tehsil-Jubbal, Distt.-Shimla-171206 H.P
Carrying out diamond core drilling and driving 40 Nos. NX size for collection of core samples from shell material drilled upto depth 1.00/1.50m in Vill. Khood, Koti Dhiman and Kharchiyan Siun for RDP, Distt. Sirmaur H.P.
Green Hydrogen Offtake from 1 MW Green hydrogen Plant at Village Dabhota, Tehsil Nalagarh, District Solan, HP