Loading…
Loading…
9 results • Latest
Repair and Restoration of damaged of 109 Secondary School Elementary School caused by heavy rainfall and flash floods in 2025. SH Construction of PCC Wall left side of School Building in Govt. Sen.Sec.School Bharan Nerwa, Distt. Shimla, H.P.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil.
Construction of Admn Block, Male Hostel 60 INMATES and Female Hostel 54 INMATES EPABX System and UPS system therein development of site SH Providing Internal E I work CCTV Camera
Wiring for light point / fan point / exhaust fan / call bell point with 1.5 Sq. mm. PVC insulated heat resistant flame retardant (HRFR) and low smoke single core (flexible) copper conductor cable in surface/recessed PVC conduit with modular switch, modular plates, suitable G.I. box and earthing the light point with 1.5 Sq.mm. HRFRLS/PVC insulated single core copper conductor cable as required and approved by the Engineer-in-Charge. Group A.
Repair restoration of damages caused by heavy rain fall and flash flood in 2025 SH Co retaining wall on the back side of School building and minor repair work at Marottan Tehsil Jhandutta Distt Bilaspur HP
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth up to all lead and lift , as directed by Engineer-in-charge. (a) All kinds of soil
Repair work
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and rammingof bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
ic internal WS and SI and development of ground under PM SHRI Works.
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, with in a lead of 50 m. as directed by the Engineer-in- charge.
Construction of main gate and gaurd post for proposed residential complex
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil , upto all leads & lifts as directed by the Engineer-in- charge. (a) All kinds of soil.