Loading
Loading…
Loading…
1 results • Latest
Construction of Brine Clarifier Foundation at Nawa Refinery Area of Sambhar Salts Limited
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed :All kinds of soil Add extra for excavating trench for pipes, cables etc. in all kinds of soil for depth exceeding 1.5 Mtr. but not exceeding 4.5 Mtr.