Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
21 live20 closing this weekmost from HMWSSB
21 results • Latest
Laying of 250 mm dia DI water supply pipeline for filling of 250 KL Capaity sumps (2 Nos) to supply water to the 2BHK colony at Kurmalguda, Badangpet under Badangpet Ward-61, Badangpet Circles-16 OM Division-VII, Shamshbad Zone-4
Laying of 300 mm dia DI water supply pipeline for filling of 300 KL Capaity sumps (2 Nos) to supply water to the 2BHK colony at Mallapur, Balapur under Balapur ward-62, Badangpet Circle-16, OM Division-VII, Shamshbad Zone-4
Providing 50 mm dia water supply connection to M/s B.S Infra Represented by Sudhakr Reddy, Sy.No 24,25 and39 Nandhi Hills, Meerpet by laying 200 mm dia DI pipe under Meerpet section, SD-I, OM Division No XX(Old (File No 2026-1-957 (Newly formed Prashanthi Hills Ward, Badangpet Circle, Shamshabad Zone under OM Division No -7
Laying and extension of 100mm dia DI water supply line from H.No.7-1-138 to H. No.7-1-142, Narsa Reddy colony under Bandlaguda Jagir ward, Rajendranagar circle, O and M Division-IX, Rajendra nagar zone
Desilting of 300/450mm dia sewer lines using Bucket Cleaning Method from Nasheman hotel to Laxminarayan Mandir under Doodhbowli ward Bahadurpura Circle of O and M Division-10, Rajendranagar Zone-5, Hyderabad Region
Supply, Delivery, Installation and testing of 220 KVAR APFC Panel for improvement of power factor at Asif Nagar filters, with necessary accessories under EAM Section, Sub Division No.ll, Transmission Division No.I, Himayath sagar.
Shifting of 200mm dia Air valves with necessary MS specials existing on 2200mm dia MS gravity main of KDWSPPhase-I from Gungal to Santhoshnagar at Telangana Chowrastha Junctions near BD Reddy Garden under KDWSP, SD-I, Transmission Div.III, Sahebnagar
Manning, Operation and Maintenance of the Customer Relation Management Cell (CRMC) Call Centre for HMWSSB for registering consumer grievances, service requests, redressal, revenue collection, customer feedback on grievances and SWC services for a period of one year under GM(IT)
Laying of Sewer pipelines in sripuram colony,Vinutna Enclave and Samanagar Colonies under L.B.Nagar Zone to avoid open sewerage flow in Gurramguda Reserve Forest area under Hastinapuram Ward
Manufacture, supply, delivery and Laying of 450 mm dia MS pipe line in a place of existing old 600 mm dia PSC pipe line to avoid heavy water supply leakages from joints, mixing of industrial waste water in potable water, causing drinking water pollution in existing 600 mm dia PSC pipe line which is below the Industrial waste water drain from ZRTI to Lalapet Railway over Bridge under Moula Ali section, SD-III of Transmission Division No.III, Sahebnagar
Laying and jointing of 300mm dia sewerage pipeline from H.No.2-6-21/8 to 2-6-38/45/P Akbar Hills near Pillar No.212 backside of Paramount Function Hall under Suleman Nagar ward, Attapur Circle, Division-9, Rajendra Nagar Zone, Hyderabad Region
Laying and Jointing of 300mm dia SWG line from H.No.4-12-189/4 to 4-12-183/3/A/1, Imad Nagar, Basheer Galli Line under Suleman Nagar ward, Attapur Circle, Division-9, Rajendra Nagar Zone
Laying of 300mm dia SWG line from 4-10-65/1/13 to Indiana Bakery, MM Pahadi X Roads under Attapur ward, Attapur Circle, Division-9, Rajendra Nagar Zone, Hyderabad Region (Reserved for SC Category)
Supply, Delivery, installation and Testing of APFC Panel for improvement of Power Factor at Shaikpet filters and Osmansagar dam with necessary accessories under EAM Section, Sub Division No.II, Transmission Division No.I, Himayathsagar
Laying of 200mm dia DI water supply line at RV Nirman Apartments, Huda Bharathi Colony for providing water supply connection vide SWC File No.2026-4-2307 under Hasthinapuram Ward, LB Nagar Circle, LB Nagar Zone.
Laying of 200mm dia DI water supply line at RV Nirman Apartments, Huda Bharathi Colony for providing water supply connection vide SWC File No.2026-4-2307 under Hasthinapuram Ward, LB Nagar Circle, LB Nagar Zone.
Manning and Operation of Revenue Billing and Collection (Manpower, Services) and Consumables for a period of six months under Malkajgiri Region under HMWSSB.
Manning and Operation of Revenue Billing and Collection (Manpower, Services) and Consumables for a period of six months under Hyderabad Region under HMWSSB.
Manning and Operation of Revenue Billing and Collection (Manpower, Services) and Consumables for a period of six months under Cyberabad Region under HMWSSB.
Strengthening of 1400 mm dia Duplicate Sewer main and restrict the entry of sewerage flows into river Musi by constructing suitable diversion and pipe carrying supported structures on either sides of Foot Over Bridge at MGBS bus station and Afzalsagar IandD under Trunk lines of 339 MLD Amberpet STP under PD-I
Development of water supply infrastructure Construction of three reservoirs, Laying of MS DI Inlet Outlet and Distribution mains in six new colonies situated in Bandlaguda area of Chandrayangutta Assembly Constituency