Loading
Loading…
Loading…
18 results • Latest
NON-DESTRUCTIVE TESTING AND STABILITY TESTING OF UG DIESEL EQUIPMENTS
NDT AND STRUCTURAL STBILITY OF UG DIESEL EQUIPMENTS ANNUALLY FOR 3 YEARS
Construction of security room at Heera-Buddini Gold Mines (SC category)
Construction of security room at Heera-Buddini Gold Mines
Procurement of casuarina poles
Casurina Pole 8 feet Long, 4 inch diameter
Supply of rock breaker grizzly supporting frame
Supporting frame for Grizzly
Supply of 35 Sq.mm x5 Core Flexible Trailing Cable FT-7 for UG use
Trailing cable 35 Sqmm
NCS Friction Winder Head Ropes (28mm x 4 Numbers) and Tail Ropes (48 mm x 2 Numbers) Replacement work. All other terms and Conditions as outlined in the NIT.
Friction Winder Tail Ropes Replacement Work