Loading…
Loading…
131 results • Latest
Construction of Missing Links/Development/Improvement Project adopting FDR (Full Depth Reclamation)/Soil Stabilization technology with commercial chemical stabilizers (additives) for roads under Package I in Phase III for 24 no of roads at various locations in (i) Shamshabad (ii) Ibrahimpatnam (iii) Ghatkesar (iv) Nagaram (v) Bandlaguda Jagir (vi) Pocharam (vii) Badangpet ULBs/ GHMC/HMDA limits
Construction of additional vent of RUB near Malakpet at km 6/0-2 on Assembly - LB Nagar Sub work - Laying of Approach road and construction of sump ( with sensor pumps) to drain rain water at New RUB Malakpet
Construction of Missing Links Development Improvement Project for roads under Package II in Phase III for 25 no of roads at various locations in 1 Badangpet 2 Jawaharnagar 3 Nagaram 4 Dammaiguda 5 Shamshabad 6 Kothur ULBs GHMC HMDA limits
Clearing and Grubbing and Formation of Embankment at Chandanagar ROB from NH-65(GSM Mall) to Manjeera pipeline road
Formation of Link Road from NCC Junction to Adikmet Flyover parallel to OU Compound wall
Laying of access road from Pullela Gopichand Academy road to EPTRI
Project Management Consultancy services for Checking of Designs, Construction Supervision, Quality Assurance, Quality Control & Quality Audit for the work of " Construction of High Level Bridge at Missing Link Corridor No. 99 on Musi River and Construction of High Level Bridge connecting suncity and chintalmet (Power Corridor) on ESA River
Construction of Missing Link Corridor from Novotel Hotel to KPHB road with 4 lane Flexible Pavement
Construction of High Level Bridge at Missing Link Corridor No. 99 on Musi River (3rd call)
Construction of link road from BRS Bhavan Road No. 10 to Road No. 12 in Banjara hills via Telangana State Police Command and Control Centre
Engaging outsourcing Agency for providing personnel (office/field staff) to work in HRDCL on outsourcing basis.
Construction of High Level Bridge connecting suncity and chintalmet (power corridor) on ESA River
Construction of Balance Median, BT road and CD works from km 0/00 to 1/250 on the road from Firing katta to NTR statue in Jawaharnagar ULB ( 2nd call)
Construction of Missing Link road Neknampur road to Alijapur (opp. Telangana Social welfare Residential school & junior college (BOYS)) 0.25 km length ( 2nd call)
Construction of Missing Link connecting from world one international school to vasantha city road ( corridor 3&156) (2nd Call)
Construction of Missing Link on Corridor No. 125 connecting road from kismathpur to Rajendranagar (2.58km)
Engaging outsourcing agency for providing personnel office field staff to work in HRDCL on outssourcing basis
Construction of Missing Link road on Corridor No. 66: New Allahpur to 100 ft road adjacent to Sunnam Cheruvu from km 0/620 to km 0/1024 ( Balance length ) with four lane road
Maintenance of two roads 1)NFC X road to IOCL-Chengicherla upto RTC Zonal Depot from km 0/0 to 8/5 and 2) Alwal-Murram road from km 3/170 to 4/500 for the year 2021-22 (2nd call)
Construction of Missing Link Corridor No-152- Osman Nagar (Near Gopanapally) to Vattinagulaplly along Wipro compound wall-Sub estimate- Construction of Wipro compound Wall
Construction of missing link/slip road on corridor part of 14 and 18 from Krantivanam layout to Bhagyalaxmi layout connecting to Narne road.
Construction of missing link slip road on corridor 11 from nallagandla ratnadeep tower to ghmc sherlingampally zonal office
Maintenance of three roads 1) Miyapur to Bachupally road from km 2/7 to 5/7 2) Midhani X road to Balapur X road from km 1/1 to 3/0 and 3) Hyderabad-Nagarjunasagar road from km 10/400 to 11/400 for the year 2021-22
Maintenenace to road from Assembly to Bowenpally road km 5/7-10/0 for the year 2021-22
Construction of missink link on Corridor 152 from Osman nagar to Vattinagulapally along Wipro compund wall(3.60Km)
Construction of missing link /slip road from road no 5 jublee hills to road no 2 banjara hills via Annapurna studios-0.4km
Construction of Missing Link near Alicafe (Golnaka) to Water treatment plant from km 0/000 to 1/376 km with 4 lane Flexible Pavement, Storm Water and Footpaths etc
Construction of Missing Link/Slip roads for Corridor 39B from ORR to Lanco Hills Junction of 2.35 km and Corridor 39C from 1+380 of 39B to Narsinghi- Puppalaguda Radial Road no.5 of Length 1.170 km including construction of retaining walls, CD works and corridor No.39D from ISB to American Consulate of length 0.37km
Construction of Compound Wall for MANU University along Corridor No.26 & 27 (Missing Links, Package-A1 &B1).
Special repairs to (i) Intermediate Ring Road (Rethibowli-Tolichowki-Gachibowli-Allwyn X road) from km 0/0 to 15/850, ii) Miyapur X road to Bachupally km 0/0 to 5/7, Balance work on Miyapur X road to Bachupally from km 2/7 to 5/7 beyond GHMC limits (BALANCE WORK) 3rd Call.
Restoration of Road cutting after laying Natural Gas Pipeline by BGL on 5/8 to 6/9 Service Road RHS (Sandhya Techno to Opp of Divyasree Tech Park) other than CRMP & SRDP Limits on Rethibowli to Gachibowli Road
Construction of compound wall for Novotel and Golf Court on Corridor No:1 (Missing Link Package-A1
Widening of Link from Dollarhills to Neknampur road from 0.500 to 2.240
Construction of Missing Link for the corridor Alkapuri Township to Radial road no 5 Narsinghi road from Km 0/000 to 0/750
Improvement and Re-Construction to 6 lane road with 2 lane Service road on Khajaguda to Nanakramguda road from 0.0 KM to 2.80 KM. (BALANCE WORK)
Construction of missing links/ slip road in Hyderabad city; Sub work: Construction of compound wall from Km 0.000 to 0.730 for Engineering Staff College of India (ESCI) lying in ROW of corridor No. 26 (Missing Links)
Project Management consultancy services for redesign, construction, supervision, quality assurance, quality control, quality audit for the work of construction of missing links/ slip roads in hyderabad city for package B1 sub work construction of VUP under road safety at Km 1/320 on corridor 23 old bombay highway (Leather park) to road no 45 under HT line
Clearing the ROW by carting away of unserviceable soil/ Debris/ Dismantled material / Construction waste etc within the right of way of Khajaguda Road (Model road Corridor)
Site clearance work on GHMC Serilingampally Zonal office to Nallagandla road at Ratnadeep
Providing avenue plantation on Missing Link Corridors 2, 16, 66, 137 & 138 in Hyderabad.
Construction of Vehicular Underpass of 6.0x3.0 m for the Corridor No. 43: Link road from NOVATEL to RTA office
Construction of missing links/slip roads in Hyd City for Pckg B1 sub work:Construction of VUP under Road safety at Km 1+320 on cr. no.23 Old Bombay Highway (Leather park) to Road no 45 under HT line (3rd call)
Construction of additional vent of RUB near Malakpet at Km. 6/0-2 on Assembly - LB Nagar road. Sub work: Construction of approach roads to proposed Malakpet RUB including Minor Bridge (2nd call)
Construction of missing links/slip roads in Hyderabad city for package A2 sub work - Construction of Minor bridge with 1V of 10m span at Km 0+730 of corridor No. 66 from New Allapur to 100 ft road agjacent to Sunnam Cheruvu
Construction of missing links/slip roads in Hyderabad city for package B2 sub work - Construction of Minor Bridge at Musi Nala for connecting link from Uppal Bhagayath to Amberpet.
Special Repairs to LB Nagar to SarojiniDevi Hospital via Aramghar from Km 0/0 to 26/800 - Construction of metal beam crash barrier, footpath and CC pavement at Attapur Bridge
Construction of side drain on Corridor no 18 Botanical Garden (kondapur) to Hafeezpet Railway Track via JV Hills
Re-construction of Minor Bridge 1 vent of 10.0 mtrs at Km 2/7 on Assembly - LB Nagar road near Old P.S Begum Bazar (with steel girder)
Special Repairs to Old Airport Road from Km 0/0 to 3/6 : Subwork : Providing and laying of footpath on Old Airport road
Construction of missing links/ slip roads in Hyderabad City for Package B2 on a)Corridor No. 39:ISB Road to Lanco Hills jn(length 3.10km),b)Corridor No. 41:Bapu Ghat bridge to Attapur Bridge(0.75km),c)Corridor No.75:Gunrock-SH-1(1.45km)/Kukatpally Metro supermall to Jagdgirgutta via HT lane ,d)Corridor No.76:Ambedkar Statue to golnaka Via Kamela (0.17km),e)Corridor No.79:Nacharam Mallapur Road to Mouli ali Flyover (0.66 km), f)Corridor No.82: Radhika x roads - Balajinagar Dumping yard (3.10 km), g)Corridor No. 85: Boduppal colony road to Mallapur road (Padmavathi colony Bus stop) via Rama cheruvu (0.94km), h) Corridor No. 86: Bhatukamma ghat Uppal (Ghatkeshar Road) to Boduppal colony road (1.20km), i)Corridor No. 134: Akshaya Food court, Gokul Nagar to HMWS NH-9 Via IDPL Colony (length 0.20km),j)Corridor No. 102: Saroor nagar to Hyatnagar Road(via Indore Stadium) (0.60km),k)Corridor No. 137:Road no 70 Jubilee hills(Prashasan nagar) to Narnie road no 78, Jubilee hills(0.47km)(2nd call)