Loading…
Loading…
131 results • Latest
Construction of missing links/ slip roads in Hyderabad City for Package A2 on a) Corridor No. 50: Hitech Citi Phase 2 to Gachibowli- Inorbit road (length 0.56 km) b) Corridor No. 66: New Allahpur to 100 ft road adjacent to Sunnam cheruvu (length 0.84 km) c) Corridor No. 99: Central ground water board to Pirzadiguda Road (length 4.74 km) d) Corridor No. 132: Gopanpally to Wipro Circle (length 0.50 km) e) Corridor No. 136: Slip road connects to Q city to NIAB via My Home Vihanga (length 2.04 km) f) Corridor No. 12: JV Hills park to Masjeed banda road via Prabhupadha layout under HT line (length 1.0 km) g) Corridor No. 101: Alkapuri Bus stop to Bandlaguda road via Sai nagar Cheruvu (length 0.70 km) h) Corridor No. 138: Neknampur road to Usman sgar road via Alkapur Township (Approx. length 0.46 km)(2nd call)
Construction of missing links/ slip roads in Hyderabad City for Package B1 on a) Corridor No. 3: Miyapur Metro depot to Kondapur Masjid Jn. (via IDPI Employees colony, Srila Park Pride road) (length 1.80 km), b) Corridor No. 8: Shaikpet Dargah Jn. (Old Mumbai road) to ORR service road (Near My Home Avatar) via Shaikpet, Manikonda road and Lanco hills road) and Link to Narsingi - Puppalaguda road (length 3.0 km), c) Corridor No. 22: Westin Hotel to Madhapur main road (length 0.30 km), d) Corridor No. 23: Old Mumbai Highway(leather park) to Road No.45 under HT line (length 1.2 km)e) Corridor No. 27: From Khajaguda Lake to ORR parallel to Urdu University Compund Wall (length 1.7 km), f) Corridor No. 30: Chitrapuri Colony to Manikonda via Nala (length 0.7 km)g) Corridor No. 43: Link road from NOVATEL to RTA office (length 0.60 km), h) Corridor No. 45: Link road connecting from Kukatpally Phase-4 to proposed slip road (length 0.25 km)(2nd call)
Construction of footpath on i) Shafilguda lake junction to Karkhana Sai Baba temple (2.0 kms), ii) Nacharam Mallapur road to Moula ali Flyover (1.0 km), iii) Radhika X roads to Balajinagar Dumping Yard (7.0 kms), iv) Uppal Nalla Cheruvu to Nagole or Vanasthalipuram (Alternative route (4.0 kms), v) Nacharam X road to Uppal Depot (via Chilakanagar & Boduppal road) (2.0 kms) and Vi) NFC ROB to Boduppal (3.0 Kms)
Construction of missing links/ slip roads in Hyderabad for Pkg-A1 on a) Corridor No.1: Nizampet X roads to Hitex Jn.(via Vasanth nagar and NAC) and Link road(2.20 km), b) Corridor No. 2: Link road from HT line to Miyapur road(1.00 km), c) Corridor No. 6: Bharat nagar ROB to Hitex Road(via Mothinagar, Borabanda Aurobindo LuLu mall, Ghousia Masjid) (0.70 km), d) Corridor No. 13: Madhavi Hills to Narnie Road via Came-lot (0.16 km), e) Corridor No. 16: GHMC Serlingampally Zonal Office to NH 65 @ GSM mall (Via Manjeera pipe line road) (2.70 km), f) Corridor No. 18: Botanical Garden Road (Kondapur) to Hafeez Railway track via JV Hills(0.73 km),g) Corridor No. 24: Link road near Bio Diversity(0.13 km), h) Corridor No.26: Old Bombay Highway to Delhi Public School via Engineering Staff College(2.30 km), i) Corridor No. (Part of 29&32): Old Bombay Highway to Khajaguda road via Malkam Cheruvu & Chitrapuri Colony(0.78 km), j) Corridor No. 42:Link road from NAC to KPHB Road(0.90 km)(2nd call)
Construction of footpath on i) Nizampet X roads to Hitecx Jn. (via Vasanth Nagar,and NAC) and link road from Km. 0/00 to 4/400 , ii) Nizampet to Kazipally ORR link Road connectivity from Km 0/0 to 8/330, iii) Connecting Moosapet to Chandanagar via Rainbow vistas, Indu and Hafeezpet parallel to NH( from km 0/0 to 8/490 and iv) Nizampet HT line road from km 0/0 to 5/200
Construction footpath on i) Link Road from chota Anjaiahnagar to Ramaky to AIG Hospitals (1.0 kms), ii) Botonical Garden road (kondapur) to Hafeezpet Railway track (2.0 km) and iii) JNTU to ORR via Pragathinagar (10.0 kms)
Restoration of Road Cutting after laying of UG cable by TS TRANSCO on i) Intermediate Ring Road from Km. 5/2 to 7/2 (RHS), km 7/2 to 9/050(RHS), km 6/140 to 8/5 (LHS), km 9/650 to 10/580(BHS) & Khajaguda road from km 0/0 to 2/7 (RHS) (2nd call)
Restoration of Road cutting after laying Gas pipe line by M/s Bhagyanagar Gas Ltd. (i) Nizampet X roads to Madinaguda (sony showroom )for a length of 3.2 km LHS from km 14/00 to 18/200 (ii) Allwyn X roads to Hafizpet for a length of 1.7 km from km 14/150 to 15/850
Restoration of road cutting by the HMWSSB at Km 9/7 on Rethibowli - Allwyn X road
Restoration of trench after laying 600mm dia and MS and 400mm dia DI water supply pipeline in Tarnaka Area on Hyderabad - Moulali road from km 0/900 to 1/1050 (L/s) and Km 2/060 to 2/960 (R/s) and at Km 14/00 to 14/060 on IRR at Tarnaka Junction.
Improvements to junction at Km 3/4 near COD on Jubilee Hills check post to Kothaguda road.
Restoration of trench for the road cutting done by the TSSPDCL for laying of electrical cable of 11KV/33KV UG cables from Km 5/800 to 6/180 at DRDL R/s on IRR from LB Nagar to Sarojinidevi hospital via Aramghar
Engaging monsoon emergency team to take up emergency repair works to the roads for filling potholes, preventing water stagnation, stripping earth settled on road and other such works of immediate nature under DEE- V HRDCL jurisdiction
Restoration of trench after laying 200KV XLPE DC UG cables by TSTRANSCO on Hyderabad - Nagarjunasagar road from Km 0/850 to 0/870 at JB No. 15 (i.e. Opposite office of the Directorate General near the divider immediately after the Nalgonda Flyover)
Restoration of Road cutting being carried out by TSSPDCL after laying 33KV and 11 KV UG cables from KM 0/0 to 5/3 on KBR park road (2nd call)
Restoration of road cutting being carried out by TSSPDCL after laying 33KV & 11 KV UG cables from Hyderguda substation pillar no.219 to 175 on IRR (LB Nagar to Sarojini devi eye hospital road) from Km 18/100 to 19/600.(2nd call)
Engaging Monsoon Emergency Team to take up emergency repair works of the roads for filling potholes, preventing water stagnation, stripping of earth settled on road and other such works of immediate nature under DEE-I HRDCL jurisdiction roads
Engaging monsoon emergency team to take up emergency repair works to the roads for filling potholes, preventing water stagnation, stripping of earth settled on roads and other such works of immediate nature under AEE -IV HRDCL jurisdiction roads
Restoration of trench for road cutting done by HMWS&SB for water leakage on Assembly - Bowenpally road at Km 4/300 (L/s) and road cutting by TSSPDCL for rectification of damaged cable on Old Airport road at Km 0/0 -100
Engaging Monsoon Emergency Team to take up emergency repair works to the roads for filling potholes, preventing water stagnation, stripping of earth settled on road and other such works of immediate nature under DEE VI HRDCL jurisdiction roads
Restoration of trench cutting done by HMWSSB for repair works on 1) NAC road at Km 0/0 to 0/100 & ii) KBR Park road at Km 2/900
Restoration of trench for road cutting done by HMWS&SB and GHMC for water leakage and laying pipe line on Hyderabad - Nagarjunasagar road at km 5/6-8, 6/0-2 & 2/8 to 3/0.
Restoration of trench for road cutting done by HMWS&SB for laying of 300mm dia water pipe line on Uttamnagar to ZTC road from i) Km 2/600-800 (R/s) opp to Railway Reservation couter ZTC, ii) Km 2/8-10 (R/s) infront of RPF gate.
Restoration of 31 Nos trial pits being taken up by TRANSCO for carrying out the detailed survey on NFC X road to Cherlapally railway station road from Km 0/0 to 1/2 and IDA Nacharam road from Km 5/250 to 7/300 (R/s)
Restoration of trench after laying 250mm dia DI water supply line for providing water supply connection to M/s Ramky Estates and Farms Ltd., on Jeedimetla - Kukatpally road from km 2/900 to 3/500
Engaging Monsoon Emergency Team to take up emergency repair works to the roads for filling potholes/ preventing water stagnation, stripping of earth settled on road and other such works of immediate nature under DEE IV HRDCL jurisdiction roads
Engaging Monsoon Emergency Team to take up emergency repair works to the roads for filling potholes, preventing water stagnation, stripping of earth settled on road and other such works of immediate nature under AEE II HRDCL jurisdiction roads
Restoration of trench after laying 300mm DI inlet main pipe connection by HMWS&SB on Hyderabad to Nagarjunasagar road at Greenpark colony at Km 5/0-2 (3rd CALL)
Restoration of road cutting after laying of electrical 33KV, 400 sqmm XLPE UG cable from upcoming 220/33KV GIS chanchalguda SS to variousSubstations i) Chanchalguda SS to Santhoshnagar X road on Nagarjunasagar Road from 1/250 to 2/850 ii) Santhoshnagar X road to Owaisi X road on Old Kurnool road from 0/0 to 1/0 iii) Owaisi X road to Midhani X road on IRR via Aramghar road from 5/050 to 5/750 iv) Midhani X road to Balapur X road from Km 0/0 to 0/060
Restoration of Road cutting after laying of optical cable by TATA i) Botanical garden to Kothaguda junction on Rethibowli - Alwyn X road from Km 10/3 to 11/100 ii) Cyber towers to Kothaguda junction on Jubilee hills check post to Kothaguda x-road from 4/900 to 6/900.
Restoration of Trench after laying inlet main of 600/450mm dia water pipeline by HMWS&SB on Inner Ring Road at Mailardevpally in between km 12/600 to 13/200 on left side
Restoration of trench after laying Gas pipe line by M/s Bhagyangar Gas Limited i) Assembly - Miyapur road for a length of 3631mts, ii) Sanathnagar Goods shed road for a length of 1900mts and iii) Nizampet X road to Nizampet Kaman for a length of 1400mts including 3 nos road crossings
Restoration of trench i) after laying 600mm MS pipe line open nala crossing at masabtank by HMWS&SB at Virinich hospital and ii) after laying of new water pipe line to govt quarters No.3, begumpet, greenlands Hyderabad, the official residence of hon'ble justice sri V Ramasubramanian at km 5/200 on left side on Inner Ring Road via punjagutta
Restoration of trench after laying UG cable by TRANSCO authorities at 220/33KV GIS sub-station at Chanchalguda on Hyderabad to Nagarjunasagar road from Km 0/700 to 1/300 on left side
Emergency repairs to Golnaka X road to Nagole Metro depot (Zinda Tilismath road) via Ali cafe from Km 0/0 to 7/7 (2nd call)
Restoration of trench excavated by the TRANSCO authorities for laying UG cable at Sainikpuri X road on Bowenpally - Thirumalgiri road from Km 8/528 to 5/548
Restoration of trench excavated by TRANSCO authorities for laying UG cable at Malakpet between JB 16 and JB 17 on Assembly - LB Nagar road from Km 6/300 to 6/400 (Right side)
Restoration of 11 KV/33 KV UG Cables trench excavated by TSSPDCL on Secunderabad - Kukatpally Road from Km 3/6 to 5/560, Old Airport road from Km 0/0 to 0/160 and Assembly - Bowenpally road from Km 8/1 to 10/0 and its approaches
Emergent Repairs to Assembly - Miyapur road from Km 10/3 to 12/6 (left side) due to restoration of trench excavated by M/s Bhagyanagar Gas Limited.
Special Repairs on Inner Ring Road (IRR) from Nagarjunasagar Ring Road to Poolbagh from KM 0/800 to 8/00
Restoration of HMWSSB trench from Km 11/100 to 12/600 (Right Side) on Assembly - Miyapur road by HMP (Balance work).
Special Repairs on Inner Ring Road from Poolbagh to Aramghar X road from Km 8/500 to 15/00
Special Repairs to a) Jubilee Check post Kothaguda junction Km 0/0 - 7/0 b) NFCL junction to KBR park entrance road km 0/0 to 2/750 (Balance work)
Widening and Strengthening of i) NFC X road to Cherlapally railway station from km 0/0 to 5/1 ii) Kushaiguda to Ghatkesar road from km 0/0 to 3/0 (Working reach from km 0/0 to 0/900).
Restoration of Hyderabad - Nagarjunasagar road from Km 5/200 to 6/300 (Right side)
Special Repairs to Expansion Joints for HLB across Musi River at 21/8-10 at Attapur on Inner Ring Road
Special Repairs to expansion joints for ROB at Hafeezpet on Intermediate Ring Road.
Special Repairs to Assembly - Bowenpally (Tank Bund) Km 0/0 to 10/0 (3rd call)
Restoration of road cutting being taken up by TS TRANSCO at IDPL water tank, IDPL Colony on Hyderabad - Medak - Bodhan road
Restoration of trench after laying UG cable by TRANSCO authorities from 220/33KV A+Shivarampally SS to 132/33KV Asifnagar SS on Inner Ring Road