Loading…
Loading…
7 results • Latest
AWC Bala Painting with Distemper Nutrition Board in 72 Locations Project Khandela
AWC Bala Penting With Distemper Nutrition Board
for developing drinking water facility in AWC
For Developing Drinking Water Facility Smoothly InThe Departmental Anganwadi Centres
installation of childern park
childern Park
SUPPLY 243 KITS OF WEIGHING MACHINE, STADIOMETER AND INFANTOMETER TO 243 AANGANWADI CENTER OF PINDWARA BLOCK OF SIROHI DISTRICT.
SUPPLY 243 KITS OF WEIGHT MACHINE, STADIOMETER AND INFANTOMETER TO 243 AANGANWADI CENTER OF PINDWARA BLOCK OF SIROHI DISTRICT.SIROHI)
nit
For the work of developing drinking water facility at each Anganwadi Centre, the work of laying PVC/UPVC pipe to supply water from the ground tank (500 litre plastic water tank) to the rooftop tank (500 litre plastic water tank) through electric motor (0.5 HP) with 20 feet wire and pin plug and after installing the water tank on the roof, the work of installing 3 steel taps from it in toilet/wash basin/RO and kitchen through PVC/UPVC pipe and the work of providing necessary plumbing material and work including labour will be considered as work at each centre. And the material to be used/purchased and installed in the said work will be of ISI (ISI) marked company.
providing water facility in 74 anganbadi kendra district baran providing water facility in 74 anganbadi kendra district baran
Water Supply Facility at AWC