Loading…
Loading…
9 results • Latest
Defect Rectification of LOP Display
E-59: 02 in no LOP display (Make-M/S MTU) of both main engine fitted in bridge for monitoring of engine parameters not getting switched on. Suspect control and graphic PCB defective. PCB to be repaired/renewed. Pulse converter is also to be proved for satisfactory operation. All inway jobs including provisioning of consumable included.
Defect rectification of Stbd Waterjet
E-145: Stbd water jet shows alarm "low lube oil" in every hours post replenishment of tube oil in hydraulic power pack. During DI/DR by ship staff it was observed that Stbd steering cylinder of stbd water jet is leaking lube oil from cylinder seal end. Suspect cylinder seal damaged due, Further check was carried out and observed steering ram with scoring marks and same has initiated the damage of seal thereby leaking the steering cylinder. Steering cylinder to be removed and chrome plating to be carried ot for operationalising the water jet on priority sitting operational situation. in way job includes. (a) Removal of steering cylinder from stbd water jet and securing the water jet at midship for re-fitting the steering cylinder by help of marking the position and securing the jet with rope. (b) Transportation to and from Ahmadabad work shop for chrome plating the cylinder. (c) Dismantling of ram using hydraulic press and inspection of the steering ram and cylinder of scoring marks with gauges and finding the maximum depth for deciding the coasts of chrome required for the perfect coating. (d) Carrying out chrome piating at the rate of 3 coasts for proper finish on the surface of ram with each coast to have a curing period of 10 to 12 hours. (e) Post chrome plating the cylinder to be re-assembled. The seal kit of the cylinder to be renewed view seal kit is perished. (f) All other in way job to be included for proper completion of job including re-fitting and trails of the system.
PROCUREMENT OF IVECO VECTOR MAIN ENGINE ROUTINE KIT 25 AND ARD 24 SPARES
600 HOURLY (H188-02, H-193-02, TOTAL-04 NOS.)
UNDERTAKING LIQUIDATION OF ELECTRICAL AND HULL DEFECTS WORKS ONBOARD ICGS C-149
L-47 Insulated rubber mat for MSB and Ships galley to be renewed as per sample.
LP OF RO PLANT SPARES
Membrane Cushion RO ETP (BG 30) 100650001017
PROCUREMENT OF MAIN ENGINE RATO S29 CLUTCH UNIT, FIFI AND SHAFT GENERATOR VULKAN COUPLING
Flexible Part