Loading…
Loading…
4,791 results • Latest
Refurbishment and Deep Cleaning of Pantry at CGAE (SVP)
Paint white enamel, Paint terracotta red, Paint signal red, Paint red oxide, Paint finishing for interdeck white, Paint dark grey, Paint azure blue, Oil & Grease remover
Repair and Overhauling Service - Potable water purification system Reverse Osmosis or UV based; 1; No; Buyer Premises
Repair and Overhauling Service - Diesel Generators- Dg Sets (DFM); CUMMINS; No; Buyer Premises
RO Plant Filter Pump Motor 0.55 KW
INMARSAT MINI C ANTENNA
7.5 KW Supply Fan Blade Assembly
PROCUREMENT OF DEEP FREEZER 425 LTR (AS PER SPECIFICATION DETAILS)
Procurement of main engine spare
PROCUREMENT OF WATER DISPENSER (AS PER SPECIFICATION DETAILS)
Toner Cartridges/Ink Cartridges/Consumablesfor Printers (Q2)
FABRICATION OF CHART STORAGE CABINET (AS PER SPECIFICATION DETAILS)
DIGITAL TELEPHONE, MAKE -TENSOSYS, MODEL-VMP-D619B
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ICGS RAJSHREE; 01 pipeline length 02 Mtrs fitted in Junior Sailor washbasin found corroded and leakage observed from various joints due to deterioration Same to be repla..
PROCUREMENT OF CARPENTRY SECTION ITEMS
PROCUREMENT OF VARIOUS
LP of Power supply unit
Flat Brushesfor Paintsand Varnishesfor Heavy Duty (V2) conformingto IS384 (Part1) (Q4)
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
additional spares W6 routine of three main engine
Enamel, Synthetic, Exterior (A) Undercoating (B) Finishing (V4) Confirming to IS 2932 (Q3), Flat Brushes for Paints and Varnishes for Heavy Duty (V2) conforming to IS 384 (Part 1) (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
LP of Naval Store Items for H194
Enamel, Synthetic, Exterior (A) Undercoating (B) Finishing (V4) Confirming to IS 2932 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Repair and Overhauling Service - Repair jobs L-027 at 69 ACV Squadron; Repair jobs L-027 at 69 ACV Squadron; No; Buyer Premises
STBD PROPELLER ( TYPE MN. BR. DIA: 500XPITCH612MMX 4 BLD, PORT PROPELLER ( TYPE: MN. BR. DIA: 500X PITCH 612MMX 4 BLD)
PROCUREMENT OF BATTERY SEC PORTABLE NI-CD 12V 4AH FOR PRC 6020
Annual Maintenance Contract of the Existing Coast Guard Inventory Management Software and Database
Azimuth Controller Port
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - C-401 L-061 During pre- refit sea trials on 11 Jun 26 while undertaking checks on AIS Automatic Identification System Make Ms Samyung Korea Model SI 30 not receiving sign..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ICGS Vishwast; Defect rectification on AC plant onboard ICGS Vishwast; Service Provider
Repair and Overhauling Service - Two Wheeler - Motor Cycles and Scooters and Mopeds; 190000; No; Buyer Premises
Manpower Outsourcing Services - Minimum wage - Skilled; High School; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; High School; Others, Manpower Outsourcing Services - Minimum wage - Semi-skilled; High School; Others
Receiver PCB, Power connector PBA Terminal Board PT-9
engineering defect rectification of various equipment
Annual Subscription of flight Radar Software, Annual Subscription of Windy Software, Annual Subscription of Vessel Finder Software
Repair and Overhauling Service - Diesel Generators- Dg Sets (DFM); Defect rectification of Engineering (E-056 and E-057) and Electrical (L-048 to L-050) defects onboard ICGS C-147; No; Buyer Premises
Repair and Overhauling Service - Diesel Generators- Dg Sets (DFM); Defect rectification of Engineering defects E-37 to E- 039 onboard ICGS C-147; No; Buyer Premises
Repairing of ROBO Rack
V - Belts - Endless V - Belt for Industrial Purposes as per IS 2494 (Q3)
Fabrication of electrical extension board trolley
Easy Change Filter, Oil Filter
Fire Resistant Action Overall (Navy) (Q2)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; E047 Lagging top cover aluminum foil of engine room and water jet compartment approx area 10 sq mtr tear down Lagging top cover Aluminum foil to be renewed a.., and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-423; E048 Fueling and defueling butter fly valve Size 50 DN at Stbd catwalk butter fly valves handle uprooted Valves handle to be renewed as per sample Mat SS; Se.., and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; E049 OBM tank drain pipeline including valve uprooted and deteriorated Drain pipeline including valve to be replaced as per sample Pipeline length 05 feet Di.., and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-423; E050 Sea water leakage observed from various places of AC condenser pump no 2 discharged pipeline to condenser inlet view pipe line deteriorated Pipe line to.., and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; L031 Window wiper blade arm and spring Qty 02 nos alongwith all blades Qty 06 nos damaged Same to be replaced as per sample Blade arm length 710 mm; Service .., and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-423; L032 MSB insulation rubber mat worn out/thinned at various places Rubber mat to be replaced as per ISO IMO standardized Area 03 Mtr X 1 5 Mtr Certificate to.., and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; L033 Submersible pump is tripping frequently while operation Defect to be rectified and proved Make Azcue Pumps capacity 10 TPH; Service Provider
Manpower Outsourcing Services - Minimum wage - Semi- skilled; Secondary School; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; High School; Others