Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LQualified | ₹2.2 L | L1 | Qualified MSE, Category: General |
| 2 | L2₹2.3 L+₹7,040 (3.22%)Qualified | ₹2.3 L+₹7,040 (3.22%) | L2 | Qualified |
| 3 | L3₹2.3 L+₹9,035 (4.14%)Qualified | ₹2.3 L+₹9,035 (4.14%) | L3 | Qualified |
| 4 | L4₹2.3 L+₹11,500 (5.26%)Qualified BLAIR SOUTH ANDAMAN ANDAMAN NICOBAR 744103 INDIA UDYAM AN 01 0000436 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744103 | ₹2.3 L+₹11,500 (5.26%) | L4 | Qualified MSE, Category: General |
| 5 | L5₹2.4 L+₹16,500 (7.55%)Qualified NEW NO 110 OLD NO 92 SF MARINE OFFSHORE INDUSTRIAL SUPPLY 110 EAST MADA CHURCH STREET ROYAPURRAM ROYAPURAM | ₹2.4 L+₹16,500 (7.55%) | L5 | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
18 Aug 2026, 5:00 pmClosed
Published by the portal on this tender, for queries and grievance redressal.
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; E047 Lagging top cover aluminum foil of engine room and water jet compartment approx area 10 sq mtr tear down Lagging top cover Aluminum foil to be renewed a..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-423; E048 Fueling and defueling butter fly valve Size 50 DN at Stbd catwalk butter fly valves handle uprooted Valves handle to be renewed as per sample Mat SS; Se..
and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; E049 OBM tank drain pipeline including valve uprooted and deteriorated Drain pipeline including valve to be replaced as per sample Pipeline length 05 feet Di..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-423; E050 Sea water leakage observed from various places of AC condenser pump no 2 discharged pipeline to condenser inlet view pipe line deteriorated Pipe line to..
and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; L031 Window wiper blade arm and spring Qty 02 nos alongwith all blades Qty 06 nos damaged Same to be replaced as per sample Blade arm length 710 mm; Service ..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-423; L032 MSB insulation rubber mat worn out/thinned at various places Rubber mat to be replaced as per ISO IMO standardized Area 03 Mtr X 1 5 Mtr Certificate to..
and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; L033 Submersible pump is tripping frequently while operation Defect to be rectified and proved Make Azcue Pumps capacity 10 TPH; Service Provider
9672438
GEM/2026/B/7844239
Two Packet Bid
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-423; E047 L
South Andamans, Andaman And Nicobar Islands
Total value wise evaluation
SERVICE
4 documents required · 4 mandatory
1 yrs
₹1 L
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| Repair | - | - | - |
| Maintenance | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; E047 Lagging top cover aluminum foil of engine room and water jet compartment approx area 10 sq mtr tear down Lagging top cover Aluminum foil to be renewed a.. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-423; E048 Fueling and defueling butter fly valve Size 50 DN at Stbd catwalk butter fly valves handle uprooted Valves handle to be renewed as per sample Mat SS; Se.. | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; E049 OBM tank drain pipeline including valve uprooted and deteriorated Drain pipeline including valve to be replaced as per sample Pipeline length 05 feet Di.. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-423; E050 Sea water leakage observed from various places of AC condenser pump no 2 discharged pipeline to condenser inlet view pipe line deteriorated Pipe line to.. | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; L031 Window wiper blade arm and spring Qty 02 nos alongwith all blades Qty 06 nos damaged Same to be replaced as per sample Blade arm length 710 mm; Service .. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-423; L032 MSB insulation rubber mat worn out/thinned at various places Rubber mat to be replaced as per ISO IMO standardized Area 03 Mtr X 1 5 Mtr Certificate to.. | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; L033 Submersible pump is tripping frequently while operation Defect to be rectified and proved Make Azcue Pumps capacity 10 TPH; Service Provider | - | - | - |
Exempted
Yes
20 Aug 2026
10 Aug 2026
18 Aug 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9672438.pdf
GEM_BID • 0.19 MB
1785231743.pdf
GEM_OTHER • 0.16 MB
1785231748.pdf
GEM_OTHER • 0.90 MB
ATC_ddbdf772-016c-4e85-b0aa1785231881740_DTO14.pdf
GEM_OTHER • 0.90 MB
SOW_06d16f9a-e30b-4847-9b421785231892220_DTO14.pdf
GEM_OTHER • 0.16 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .