Loading…
Loading…
14,897 results • Latest
ICV WIRE ROPE
Signaling work in connection with fencing work in DIWA - PANVEL - ROHA & CSMT - PNVL, TNA (excl.) - Vashi (incl.) Harbour line of Mumbai division.
Comprehensive Annual Maintenance Contract for Hydraulic and Pneumatic Systems (All systems except Main Engine & SLI System) of 140 Ton BD Crane located at NBQ & RPAN Depot for a period of 03 (three) years through OEM/Authorised Delear from the date of commencement of work.
Zone-C1-WST-Parts of jurisdiction of Pway section namely WST & AVD lying inside Chennai city limits as under:-(i) MAS-AJJ sec up to VLK km.9/30(incl) ( Excl. BBQ Coaching yard, ELS/RPM) (ii) MSB-VLCY sec. up to Velachery (incl) (iii) Other areas in Chennai City limit.
Subwork-1: Alteration to the existing Electronic Interlocking System (KYOSAN make) in connection with Tower Wagon siding work along with POINT FCOR circuit at SHEDBAL station. Subwork-2: Alteration to the existing Electronic Interlocking System (MEDHA make) in connection with the closure of LC gate at LC Gate No. 79 at MRD Yard; LC Gate No.18 at NGR Stations; LC Gate No. 85 at HPT Jn Station; LC Gate No. 331 at TVG Stations; and LC Gate No. 26 at LKT Yard also includes circuit alteration for NDKR/RDKR Circuit, POINT FCOR circuit and any other minor alteration required to be carried out as per railway requirement. Subwork-3: Alteration to the existing Electronic Interlocking System (SIEMENS make) in connection with the closure of LC Gate, at LC Gate No. 34 at BDM yard and LC Gate No. 41 at GED yard also includes circuit alteration for NDKR/RDKR Circuit, POINT FCOR circuit and any other minor alteration required to be carried out as per railway requirement. Subwork-4: Closure of mid-section interlocked Engineering LC Gate No.1B between KHTI & LNBI Stations; LC Gate No.19 between MAO & CNR Stations and LC Gate No.35 between VC & HBI Stations, Traffic LC Gate No.111 between BYC & BAY Stations of Hubballi Division, South Western Railway.