Loading…
Loading…
2,403 results • Latest
Service Contract for Fire Fighting in ICF
RUBBER PACKING RING T 01632
LOCKING PLATE FOR WHEEL&AXLE DRG
UNF ALU PROFILE L:2510MM DRG LA10131
BODY SIDE WINDOW ARRANGEMENT WITH FIXED LOUVRE SHUTTER
AUTOMATIC INTEGRATED SYSTEM OF DRY CLINICAL BIOCHEMISTRY
SUPPLY OF BRISTLES ARRANGEMENT TO DRG NO.MRM2/TC(984)-42-006 FOR EMU AD COACHES.
SS HEX HD SCREW SIZE M6 X16 ,TO SPECN IS 1363(P-2)2002,TO IS 1367(P-14) 1984,GrA2 70.
SUPPLY AND INSTALLATION OF RETENTION TANK WITH S-TRAP & WITHOUT PRESSURISED FLUSHING (RH) TO DRG.No.329-6-3-352, ALT-NIL AND AS PER SPECN. MDTS-26001, REV04 (EXCEPT CLAUSE 3.5 - PRESSURISED FLUSHING S
SET OF LED LIGHT FITGS
ASSEMBLY AND TIG WELDING OF CARLINE ASSEMBLY COMPLETE OF KOLKATA METRO
ASSEMBLY AND WELDING ACTIVITIES OF SIDEWALLS AND ROOFS (REGULAR/WET- LEASING) OF DIFFERENT VARIANTS OF LHB SHELLS AT ICF / CHENNAI
Supply & Installation of SAP Certified Hardware, Upgradation of SAP S/4 HANA 1809 to 2025 version, Migration of existing SAP System, on turnkey basis, including Post-implementation Hardware & Software Support, at Integral Coach Factory, Chennai - 600 038
UNF HEAD BRACKET LEFT
MULTI PURPOSE HIGH PRESSURE PVC FLEXIBLE
Auto Refractometer (V2) (Q2)
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS15549 (Q3)
UNF SNAP HD MULTGRP BLIND RIVET4.8X15.08
SNI LUG. RACK COMP ICF/MRVC/COL-7
Revolving Chair (V5) (Q2) (3 (3 ))
SUPPLY OF ONE COACH SET OF LAYOUT NOTICES
Set of items for MEMU/BT MC wheel sets, hardwares and consumables
EARTHING BLOCK MADE OUT OF STAINLESS STEEL
SUPPLY OF BRACKET FOR SPEAKER
SUPPLY OF SS-TUBES & DBL FRRL MRVC/D/BT
S&I CABLE TRAYS 3PH EMU-C-BT
Precision Height Gauge (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
SUPPLY OF SET OF CLAMPS ANGLES, BRACKETS, AND CHANNELS
SUPPLY OF SET OF CLAMPS ANGLES, BRACKETS, AND CHANNELS
SUPPLY OF SET OF CLAMPS ANGLES, BRACKETS, AND CHANNELS
SUPPLY OF SET OF CLAMPS ANGLES, BRACKETS, AND CHANNELS
SUPPLY AND INSTALLATION OF PANELING IN SIDE WALL, PARTITION AND ROOF AS PER DRG.NO.LWS/PP2(754)-4-2-001, LWS/PP(974)-4-3-001,ALT-b, LWS/PP2(754)-4-4-001, ALT-c. ACP TO BE SUPPLIED AND INSTALLED BY THE
C/S OF CONSOLE (TS MC, NDTC, DTC & TC)
SET OF PLUG&SOCKET 20A,3P,230VA
STAINLESS STEEL OUTSIDE WASH BASIN AND DUSTBIN FIXING ARRANGEMENT FOR LHB COACHES
ONE COACH SET OF AIR GRILLS FOR LWLRRM COACHES
SET SWITCH PLATE ASY ICF/EDML 24-LFAC AB
SET OF LED FITTINGS LSDD AMRIT B
SUPPLY OF ONE COACH SET OF LAYOUT OF NOTICES
HANDLE WGSCWAC 64003-C1-PU FOAM COAT
UNF END FITTING STRAIGHT NW29 DIA 32 MM
KIT ITEMS FOR SIDE FRAME FOR FIAT BOGIES. 1) SPRING GUIDE UPPER TO DRG.NO.AAA03159- 8 NOS MACHINED SURFACES TO BE COATED WITH RUST PREVENTIVE OIL TO SPECN.MD44121,DT:19/4/11 [PART-1]. 2) HEAD BR
LIQUID OXYGEN FOR INDUSTRIAL USE MINIMUM PURITY 99.0% WHEN TESTED INGASEOUS FORM AS PER CLAUSE 4.1 & 4.2 OF IS:309/92 WITH AMENDMENT NO.1. Make/Brand: SOL
Fuse Terminal Board Assembly
COTTER SPLIT
MS CHANNEL MC75 SIZE 75 X 40 TO IS:808/89 AND MATERIAL STEEL TO IS:2062- 2011GRADE E250A(Fe 410W) TO LENGTH OF 4 METRES