Loading…
Loading…
4,364 results • Latest
Assessment of present cross sectional profile with topographical survey of Hotor Rashkhali Khal from Ch 0 Km to 7 Km and 2 nos suti khal within Bishnupur 1 block district South 24 pargana under EE II Canals Division Eastern Circle I W Dte
M/R to gate operation of H/R gate, U/S gate ,other canal gates allied works like gauge reading of dam etc in c/w Khairabera Irrigation Scheme at Block P.S.- Baghmundi, Dist- Purulia
M/R to Dy-I Dy-2 Canal of Kulbera Irrigation Scheme at BlockP.S- Baghmundi, Dist- Purulia.
Assessment of present cross sectional profile with topographical survey of Tepridaha Khari Kuribari Khari and Katabari Khari at Bamangola Block at Maldaha District under Maldaha Irrigation Division North Irrigation Circle I I W Dte
Restoration of Sundarban Embankment for a length of 110 Mtr. facing River Sahebkhali (L/B) near Ramapur FP School due to damage occurred on 16.06.26 during new moon kotal at Mouza- Ramapur in Block- Hingalganj under Hingalganj (I) Sub-Division in
Emergent Restoration to Sundarban Embankment damaged occurred on dated 22.05.26 facing River Kalindi (R/B) for a length of 40 Mtr. near H/O Jamal Biswas at Mouza- Hingalganj in Block- Hingalganj under Hingalganj (I) Sub-Division of Basirhat Irrigati
M/R to Dy Canal in between Ch. 51.00 to 138.00 and Minor Canal in between Ch.51.00 to Ch. 110.00 in connection to Khairabera Scheme at Block-P.S. Baghmundi, Dist. Purulia
Emergent Restoration and strengthening of Sundarban Embankment Damaged due to Amabasya Kotal on 26.10.2025 facing River- Bidyadhari (RB) near location of Khariyat Shaswan for a length of 250.00 m, Mouza-Kharihat Abad , G.P.-Boyermari - I , Block- S
M/R To Main Canal,Dy-1 Dy- 2 Canal In C/W Kestobazar Irrigation Scheme Under Purulia Irrigation Division At Block P.S- Baghmundi, Dist- Purulia in the year 2025-26
Emergent repair of Sundarban embankment damaged due to Purnima Kotal on 06.11.25 along river- Sahebkhali(R B) at Golabari(at starting point of river Raimangal) for a length of 60 Mtr. at Mouza- Sitalia, P.S- Sandeshkhali, Block-Sandeshkhali-II under
M/R to Dam,Lbmc , Lbmc dy- 1 , Rbmc and Rbmc dy-2 in c/w turga irrigation scheme under Purulia Irrigation Division at Block P.s- Baghmundi, dist- purulia in the year 2025-26
Restoration of Sundarban embankment at Bakjuri facing River- Haroagang-Kultigang (RB) for a length 150.00 m, Mouza-Bakjuri , G.P.- Bakjuri , Block- Haroa of Haroa Irrigation Sub-division under Basirhat Irrigation Division, Dist. North 24 Pargana
M/R to L.B.M.C,Dy-1,Dy-2,Dy-3 Other necessary works for smooth Operatation of gate , spillway gate and all canals for 2025-26 during kharif Irrigation of Karrior (I) Scheme under Purulia (I) Division ,Block - Jhalda - I II , P.S. - Jhalda , Dist
M/R to main canal in c/w Fakidi Irrigation scheme during 2025-26 under Purulia Irrigation Division Block- Jhalda-I,P.S-Jhalda, Dist- Purulia
M/R to LBMC,RBMC , Dam Dyke Other necessary works in C/W Dimu Irrigation Scheme for 2025-26 under Purulia Irrigation Division at Block- Jhalda-II, P.S-Kotsila, Dist-Purulia.
MR to main canal and Other necessary works for smooth Operatation of gates in cw Parga Irrigation scheme under Purulia Irrigation Division P.S. Kotshila Joypur Block Jhalda II Joypur Dist Purulia
M/R to LBMC,RBMC,Dam Dyke Other necessary works for smooth Gate operation in C/W Patloi Irrigation Scheme for 2025- 26 under Purulia Irrigation Division at Block P.SPurulia- II, Dist-Purulia.
MR to fall structure at 1860.00 m of Sankha Main Canal in CW Sankha I Scheme at Block and PS balarampur Dist Purulia
M/R to Rupai Main Canal and Distributaries in different reaches in c/w Rupai Irrigation Scheme of Purulia Irrigation Sub Division Under Purulia Irrigation Division, Block - Jhalda - I, P.S - Jhalda , Dist -Purulia
Collection of Soil,Sand samples from different rivers and locations for potential desiltation under the juridiction of Asansol Irrigation Division, Irrigation and Waterways Directorate, Govt. of West Bengal
Collection of Soil,Sand samples from different rivers an locations for potential desiltation under the juridiction of Mayurakshi Canal Circle (Mayurakshi Head Quarter, Mayurakshi North Canal, an Part of Mayurakshi South Canal Division), I AND W
Assessment of monthly April to October 2024 monitoring of Channel I III 3A and 3B in the river Muriganga near Lot 8 Kakdwip to Kachuberia Sagar Island ferry routes in respect of dredging for the Ganga Sagar Mela 2025 to be conducted by the RRI
Assessment of present river cross sectional profile with bank topography survey of Suti Khal (IWD) in Singur Block and Bali Muncipalty area of Distrct Hooghly under Lower Damodar Irrigation Division-II of Western Circle-I
Protection work to the right bank of river Bhagirathi at Narayanpur up stream of dampal ferry ghat for a total length of 2100.00 M Mouza Narayanpur, G.P. Patuli and near Chhatni Samshan, G.P Nimdaha in Block Purbasthali 2, P.S Purbasthali,
Protection to the eroded left bank of River Dwarakeswar for a length of 1480 Mtr at Mouza-Bamania and Naga tentul (1450 mtr) and at Mouza-Kunjapur (30 mtr), Block and P.S.-Indus, Dist.- Bankura
Protection to Right bank of River Damodar for a total length of 1380 mtr at MouzaVasna, G.PBNRol, Block P.S Indas, Dist-Bankura (for length 300 mtr) and at Mouza-Beldanga, G.PLodna, Block P.SKhandaghosh, Dist-Purba Bardhaman (for length 1080 mt
Clearing and removing water hyacinth under AMC for the period of 365 days including thick and thorny jungles of Padma Khal from ch. 0.0 Km to 3.0 Km and 4.50 km to 7.0 km within BlockHabraI PSHabra in the Dist N 24 Pgs.
Clearing and removing water hyacinth under AMC for period of 365 days including thick and thorny jungles of Nangla khal from ch. 0 km to 4.70 km and us of Nangla beel towards Hanapara bridge for a length of 300 mtr. within Block. Habra1, PS. Habra,
Clearing and removing water hyacinth under AMC for a period of 365 days including thick and thorny jungles of Koral khal from Ch. 0 Km to 1.50 km and 4.4 km to 7.70 Km within Block-HabraI PS-Habra, Dist. N 24 Pgs.
Clearing_removal of water hyacinth and water weeds in between Ch.0.00 and Ch.170.00 of Jhimki Channel for a working length of 3.50 Km within Dhaniakhali (I) Section under Jamalpur Irrigation Sub-Division in G.P.- Belmuri Madra, PS._Block Dhaniakhali
Clearing and removing water hyacinth, weeds, floating vegetation and jungle in between Ch.0_Ch.210.00 (Tail) of Canal Dy. N1A of N1 of Kana Nadi, Block- Dhaniakhali under Dhaniakhali (I) Section of Jamalpur Irrigation Sub-Division in the year 2026-27
Clearing and removing water hyacinth, weeds, floating vegetation and jungle in between Ch.285.00D/S of Bridge Structure_Ch.491.00 (Tail) of Canal Dy. N1B of N1 of Kana Nadi, Block- Dhaniakhali under Dhaniakhali (I) Section of Jamalpur Irrigation SD
Clearing and removing water hyacinth, weeds, floating vegetation and jungle in between Ch.278.00_Ch.536.00 of Canal Dy. N1 of Kana Nadi, Block- Dhaniakhali under Dhaniakhali (I) Section of Jamalpur Irrigation Sub-Division in the year 2026-27.
Clearing and removing water hyacinth, weeds, floating vegetation and jungle in between Ch.0_Ch.277.00 of Canal Dy. N1 of Kana Nadi, Block- Dhaniakhali under Dhaniakhali (I) Section within Jamalpur Irrigation Sub-Division in the year 2026-27.
Clearing and removing water hyacinth, weeds, floating vegetation and jungle in between Ch.573.50 D/S Structure_Ch.735.00 U/S Structure of Kana Nadi Canal within Dhaniakhali Block under Dhaniakhali (I) Section within Jamalpur Irrigation Sub-Division
Clearing and removing water hyacinth, weeds, floating vegetation and jungle in between ch. 0.00_116.00 of Sergarh Canal and ch. 0.00_110.00 of 270_Water Course under Jamalpur (I) Section within Jamalpur Irrigation Sub-Division in the year 2026-27
Clearing and removing water hyacinth, weeds, floating vegetation and jungles from Ghiya Drainage Channel from Ch.0.00 to Ch.408.00 under Jamalpur Irrigation Section of Jamalpur Irrigation Sub-Division during the year 2026-27.
M/R to canal banks and removal of water hyacinth and weeds in between Ch. 175.00_Ch. 873.00 of Branch-1 Canal and its WC-1/H(Ch.0_Ch.158), WC-1/L(Ch.0_Ch.88), WC-1/M(Ch.0_Ch.217), and Dy-1/3(Ch.0_Ch.141) for a total length of 4000.00m_Boinchee (I)
Clearing and removing of drainage congestion form waterways and Slope for total length of 3.00 Km of Damodar Khal Branch of M.M.C from Bhandergachia Sluice to Shibpur Mollapara at G.P-Mohespur, Mouza-Uttar Ramchamdrapur, Block-Uluberia-I, Howrah.
Bank protection work at right bank of river Mahananda for a length of 600.00 m at village-Khidirpur, Mouza-Islampur, G.P.- Kharba, Block-Chanchal-I in District-Malda
Restoration of Slip and subsidence at left bank of Nakole Branch khal for a length of 50.00 mtr. Due to high tide and heavy rainfall in GP-Nakole, Block-Shyampur-II, PS-Shyampur, District-Howrah Under Seijberia (I) Sub-Division within LDC Divn.
M/R work along both bank of Panrapara Gurepole khal near out fall of river Hooghly for a length of 157.00 m in GP-Baneswarpur-I, Block-Shyampur-I, PS-Shyampur, District-Howrah Under Bansberia Section of Seijberia (I) Sub-Division within LDC Divn.
Protection work (Length 15.00 Mtr at D/S and 10.00 Mtr at U/S) at Left Bank of Bhawanipur khal in front and back of Bhawanipur Sluice in G.P-Balichaturi, Block-Shyampur-I,P.S-Shyampur,Dist-Howrah .
Clearing and Removing water hyacinths in between Ch. 1600 and Ch. 1887.00 of Behula River to facilitate khariff irrigation for the year 2026-27 within Block- Kalna II, Distrct - Purba-Bardhaman under Baidyapur (I) Section of MISD
Supply (hire), installation, operation, guarding during monsoon period of 06(Six) nos. 20 HP diesel pump..in and around of Salap and Makardah G.P under Domjur Assembly Constituency during the monsoon period, Dist.- Howrah during the year 2026-27.
Supply Installation Testing and Commissioning of 5 (five) nos. Goose neck microphones and 1 (one) no. Mixer at NIC Meeting room at Ground floor of Jalasampad Bhawan, Salt Lake, Kolkata -700091 during the year 2026-27
Clearing and removing water hyacinth, weeds, floating vegetation and jungle in between Ch.0_Ch.256.00 of Dy.KN4 of Kana Nadi Canal, Block-Dhanikhali under Dhaniakhali (I) Section within Jamalpur Irrigation Sub-Division in the year 2026-27.
MR to Main Canals,Dam Dyke Distributaries and Other necessary works for smooth Operatation of Gate in CW Golamarajore Irrigation Scheme for 2025-26 under Purulia Irrigation Division
Clearing and removing water hyacinth, weeds, floating vegetation and jungles from Kana Nadi Canal from Ch. 285.00 to Ch. 573.00 U/S within Dhaniakhali Block under Dhaniakhali Irrigation Section of Jamalpur Irrigation Sub-Division during the year 2026
Clearing and removing of weeds and water hycinth of Tangra Khal in between Ch. 0.00 Km to 1.300 km Karanjali Sardar Para in Block-Kulpi District-South 24 Parganas under Diamond Harbour(I) Sub-Divison of Canals Division.for the year 2026.