Loading…
Loading…
3,589 results • Latest
Patch repair work using HMP in Juhi Parampurva from Hari Maszid to Harihar Nath Shelter Home under Zone 5 Ward 16
Road improvement work using HMP in Panki F-Block near Annapurna Park under Zone 5 Ward 53
Construction of rcc nala work from y-block pani tanki to shukla medical store Under Ward-51 Zone-5
Improvement work By C C of road and drain from Alok Sharma house to Block No. 264 in Shastri Nagar under Zone 06 Ward 69 Sarojini Nagar.
Improvement work of road, footpath and drain from Hans Tower Apartment (117/O//402) to Rakesh Kumar Srivastava (117/O/392 a) under Zone 06 Ward 52 Geeta Nagar.
S/F of 05 Nos. 9.5 mtr. Long tower pole SP-39 alongwith 10 sqmm 2 core armoured cable, flood light fitting, switches etc. at Different Place of Ward-45, Zone-05, Kanpur.
Suppy of 168 Nos. 90 Watt LED Street Light Fitting for Zone-03, Nagar Nigam, Kanpur.
S/F of 27 Nos. 7.00 mtr. Long New S.T. Pole alongwith 10 sqmm 2 core armoured Cable, Automatic Switch etc. at Different Places of Cant Vidhansabha, Zone-02 and 03, Kanpur.
Improvement work of road and drain by interlocking from Manzoor house to Bablu Nizam house in Pyodi Village Chakeri Ward 12 Under Zone02
Improvement work of road and drain by interlocking from Abhinav Sharma house to Rampal house in Bapu Nagar Ward-12 Under Zone-02
Improvement work of road From Suraj devi house to Arjun house in Deeppur Ward 31 Under Zone02
Road improvement work by interlocking tiles of various service lanes block no.189 to 464 under Zone 06 Ward 91 Shastri Nagar.
Improvement work of road From Randhur singh house to Brajial house in Deeppur Ward 31 Under Zone02
Improvement work of road and drain From Ranjeet Singh house to Rajesh house Via Suraj Singh house in Bapu Nagar Ward 12 Under Zone02
Construction work of additional shed at the cremation ground located at Siddhanath Ghat.
Laying of Interlocking tiles in front of Kumhar Shop At Jajmau Colony in ward58 Zone02
Construction of Shed at rubish dump at ashiyana lane in ward 58 Under Zone02
Improvement work using CC (cement concrete) on the lane adjacent to House No. 8/184, in Arya Nagar Khalasi Line under Ward-10, Zone-04.
Repair work of road by H.M.P From Chubey Chauraha to Raksha Vihar Colony Closed gate in Shyam Nagar Ward 74 Under Zone02
Improvement work CC from House No. 8/176 Saroj Tiwari house to House No. 8/181 Shubham Party Sales in Arya Nagar Khalasi Line under Ward-10, Zone-04
Construction work using CC in the lane known as Calcutta Hair Dresser Wali Gali, located in Khalasi Line at Aryanagar Ward-10, Zone-04.
Repair work of road by H.M.P Patch From Gopeshwar Villa to Chhappan Bhog Churaha in Shyam Nagar Ward 74 Under Zone02
Improvement work using CC (cement concrete) for the lane stretching from House No. 112/8 to House No. 112/115 in Benajhabar Bhatta, Ward 10, Zone 4.
Construction of a CC road from Ashray Awas Colony to Brahma Nagar Crossing Ashok kumar under Ward-37, Zone-04.
Repair work of road Patch by H.M.P Patch From Harihar Dham Park to Om Sweet House in Shyam Nagar Ward 74 Under Zone02
Work of laying Kota stone around Pipleshwar Temple in Gwaltoli Khalasi Line Under Ward-04, Zone-04.
Repair work of road Patch by H.M.P Patch From Virendra Swaroop Junior To Ramlila Maidan in Shyam Nagar Ward 74 Under Zone02
Construction of a CC (cement concrete) road in Jawahar Nagar, spanning the lane from House No. 107/263 opposite Navyug Nursing Home to Raghav General Store under Ward-05, Zone-04.
Construction of a CC (cement concrete) lane from Amit Kashyap house (107/263) to the Geeta Park gate in Jawahar Nagar under Ward-05 Zone-04.
Beautification work at the flag hoisting site at Tooti Masjid Square, Rambagh in Jawahar Nagar under Ward-05 Zone-04 .
Construction of RCC Nala from Rehan Paints Store To Raju Dari house in Sujatganj ward99 Zone02
Improvement of both side footpath and drain from Harsahay college chauraha sisamau to rameshwar mandir sisamau via baratshala to sabji mandi chauraha sisamau and repairing of lane by C.C. from 104/299 to pawan masala, 104/291, 104/192 ward-59 zone-4
Improvement work on the road shoulder and drain from Dr. Katiyar to Dr. Ahmed, under Ward 61 Zone 04.
Improvement work of Road by RMC from Shankar Sadan to Ramchandra Trivedi Near Machhariya Puliya Ward 41 Under Zone02
Improvement work of Road by RMC from Raju Paswan to Sanjay Awasthi Near Machhariya Puliya Ward 41 Under Zone02
Colouring of Sadbhawana park in Ward 84 Zone 03
Patch work by hot mix plant from Barsaitpur main road to Rama Hospital Bank Gate and from Sai Fast Food to Apprentice Office Board under Zone-06 Ward-44 Khyonra.
Patch work by hotmix plant from Gurudev crossing to 9 no. crossing under Zone 06 Ward 52 Geeta Nagar.
Road patch work from Shobhan Chauraha to Anurag Hospital under Zone 06 Ward 52 Geet Nagar by Hot Mix Plant.
Patch work by hotmix from DNG Grant Hotel to Yadav flour mill under Zone 06 Ward 52 Geet Nagar.
Patch work work by hotmix plant from street number 2 Vishnoi Park to Lakshmi Tripathi house under Zone 06 Ward 52 Geeta Nagar.
Patch work by hot mix plant in Maharana Pratap School street in Indrapuri under Zone 06 Ward 52 Sharda Nagar.
Improvement of Road and drain From H/O rohit gupta to raj vila at JK Lane Adarsh Nagar in ward-58 Zone02
Improvement of hot mix plant work i-block 15 to i block 47 Under Ward-55 Zone-5
Improvement of road and drain from H/O jagdamaba yadav to RK palace at Kailash Nagar in ward-58 Zone02
Improvement of lane and drain from Kamala sadan to Sahegal niwas at Kailash Nagar jajmau in Ward-58 Zone-02
Construction of rcc nala work from kapli gav main road Under Ward-53 Zone-5
Improvement or hmp through road and footpath work from juhi parampurwa papular dharmkata bajpai house to thakur pan house Under Ward-16 Zone-5
Laying of interlocking tiles in front of Sahu General Store in ward-58 Zone02
Improvement of Side Patri and drain from guru villa to pal general store at JK Colony Jajmau in ward-58 Zone-02