Loading…
Loading…
3,589 results • Latest
Construction of Pathway and Painting work bada park near Shiddhanath Chauraha in ward 47 under zone 02.
Raw Patch repair work by GSB Near S.L. Galaxy, Vishal Tent House, Atul Sweet house and Akash Motors in Gangapur Ward 63 Under Zone02
Improvement or hmp through road work from chaitany awasthi house no.505 to 84 Under Ward-09 Zone-5
Improvement of hmp through road work from bankey bihari dharmkata to No.-3 crossing via pandit dugd bhandar Under Ward-06 Zone-5
Road improvement work using HMP from Plot No. 347/3 Jaiveer House to Ambedkar Park Road under Zone 5 Ward 09 Ravidaspuram
Road improvement work using HMP in Ratanlal Nagar from House No. HIG under Zone 5 Ward 09 Ravidaspuram
Road improvement work using HMP in Tatya Tope Nagar from 48 MIG Face 3 under Zone 5 Ward 09 Ravidaspuram
Road improvement work using HMP in Barra 08 from Labour Mandi Chauraha to Fouji Atta Chakki Shop under Zone 5 Ward 09 Ravidaspuram
Road improvement work using HMP in Barra 08 from Tikona Park to Katiyar Morang Gitti Shop under Zone 5 Ward 09 Ravidaspuram
Imp. R.C.C. Nala from W. Block Keshav Nagar in hamirpur Road Hari om Traders Transport Company UCGL SNG Pump to H.P Narayana petrol pump in ward 18 Zone 03
Imp. C.C. Nali With Sarvices lane from Juhi pili colony in Block No 2/1 o Block No 2/8 Pili colony in Ward 84 Zone 03
imp. C.C. Nali With Sarvices lane from Juhi Peli Colony Block No 7/2 and Block No 8/2 Peeli conlony in ward 84 Zone 3
Imp. Of Cover of Nala With R.C.C slab from T.P. Nagar 150 fit Road to jalkal office in ward 39 Zone 03
Imp. Begam Purwa Eidgah Xing and Mishrilal Akhada in ward 102 Zone 03
Improvement work of road and Drain by interlocking tiles in front of Shanti Niwas in Kailash Nagar Ward 58 Under Zone2
Work of installing hand railing and False Ceiling on the first floor of the Community Center in Jajmau Ward 58 Zone02
Construction of first floor roof and room in the community Center at jajmau Ward 58 Under Zone02
Imp. R.C.C. Nala from Side No 1 xing to Ayurvedic maidan in ward 14 Zone 03
Imp. Interlocking tiles With Side patri from Chaturvedi Building to Ram Radhe Vatika in ward 65 Zone 03
Imp. H.M.P.Road from geeta pari Harijan basti H.No 128/93 G Block in ward 100 Zone 03
Imp. Interlocking tiles from damodar nagar in Brahamdatt xing to Sunita Jewellers in ward 65 Zone 03
Improvement of Road and Drain from H/O Ganga Visnu Shukla (H.No.64) to H/o Raja Ram (H.No.297 in Shiv Katra ward26 Zone02
Installation of mesh screens to trap floating debris on open deep drains in Zone 5 Ward 53 Saraymita as part of the Swachhata Survekshan Cleanliness Survey
Construction of urinal work from darshan purwa 119/388 Under Ward-81 Zone-5
Improvement of Road by I/L From H/O Priya Tiwari To Chandeshwar Mahadev Mandir Via H/O Mohani Tiwari in Chandan Nagar Ward62 Zone02
Cleaning of nala from fazalganj saresh bag gold spot chauraha to bank of baroda Under Ward-20 Zone-5
Cleaning of nala from fazalganj bank of baroda to punjab paint chauraha via nagrath paint chauraha Under Ward-20 Zone-5
Imp. Of Patch Work With H.M.P road from double road to puranchandra Vidyalay in back Sampwell and Chauwan Paties near booth Bangla Road and Mishra aata chakki in Ward 77 Zone 03
Construction of RCC covered drain from house number 117/P/146 to house number 117/P/158 (Jafri Tiraha) in Mohalla P Block under Zone 6 Ward 86 Kakadev.
Construction work of chamber Raft and slab at brahm nagar chauraha under ward-05/37 zone-4
Providing and laying W.B.M and GSB at brahm nagar chauraha under ward-05/37 zone-04
Dismantling of brahm nagar chauraha for repairing damaged dot nala under ward-05/37 zone-04
Construction work of C.C for laying R.C.C pipe at brahm Nagar chauraha under ward-05/37 zone-04
Earth work in embankment at brahm nagar chauraha under ward-05/37 zone-04
Construction work of chamber wall by R.C.C. at brahm nagar chauraha under ward-05/37 zone-4
Laying of water drainage pipe and construction of manhole chamber at Brahm nagar chauraha under ward-05/37 zone-4.
Supplying and filling of sand for dot nala at brahm nagar chauraha under ward-05/37 zone-4.
Dewatering of dot nala at brahm nagar chauraha under ward-05/37 zone-4.
Cleaning of dot nala at brahm nagar chauraha under ward-05/37 zone-4.
Improvement of Road by H.M.P from Shani Dev Temple to petrol Line in Karrhi Ward70 Under Zone03
Road and drain improvement work for Ganesh Mahotsav in Mohalla Jai Prakash Nagar under Zone-06 Ward 25 Naveen Nagar Kakadev.
Supply of GSB at Kakadev dump for kutcha patch on various damaged roads under Zone 06
Improvement work by Hmp from Sachan Villa Located at Varun Vihar to the house of Gheran kumar Gautam in Jarauli Phase-2 Ward-82 Under Zone02
Construction of urinal near Naresh Chandra Chaturvedi Park under ward-37, zone-4.
Improvement work of Road by HMP from Yadav ji House to Arun Tripathi house and from Bhola house to Ram Prakash house in Swarn Jayanti Vihar Sector09 Ward 62 Under Zone02
Improvement of interlockig tiles though lane work from ravidaspuram tatyatope nagar fase-1 house no.o-75 to o-99 and l-23 to 7R LIG-41 to to l-68 Under Ward-09 Zone-5
Repair work of Road by HMP from Kushwaha Milk Store to Durga Temple in Koyla Nagar Swarn Jayanti Vihar Sector09 Ward 62 Under Zone02
Improvement work of Road by HMP from Mahend house to Temple in Sector09 Swarn Jayanti Vihar Ward 62 Under Zone02
Patch repair work by hot mix plant from Kesa Tiraha to LIG-15 and from Shri Hari Kripa to LIG-282 in Mohalla Dayanand Vihar Phase-2 under Zone 6 Ward 17 Naramau.
Repair work on the street drain and wall opposite the Mazar near Bakarmandi Gaushala, at chunniganj under Ward-03 Zone-04.