Loading…
Loading…
120 live93 closing this weekmost from Kerala Water Authority and Water Resources Department Kerala
120 results • Latest
Others Running contract for hiring vehicles Hiring of vehicle without driver having cubic capacity between 1000cc to 1500cc for One year for the use of PH Circle KWA Thrissur General Civil Work
State Plan 2026 27 Renovation of existing civil structures owned by KWA Maintanance of compound wall at KWA compound Thiruvalla
DEPOSIT Deposit work of Thiruvananthapuram Corporation SO 1981 26 Improving water supply to Chirakkulam road in Vanchiyoor ward Pipeline Work
State Plan-2025-2026 - ARWSS to Maneed and Mulanthuruthy, Amballoor and Edakkattuvayal Panchayaths-Supplying and fixing of Valves in various places under Mulamthuruthy Section. Pipeline Work
DEPOSIT-CWSS to Varkala and adjoining villages-Replacing the damaged Existing connection in kalyankumar Road by PWD-Pipeline Work-General Civil Work
State Plan 2026-2027 Drought Mitigation Supply of Valves and Specials to Ranni Section Store General Civil Work
OandM - Water Supply Schemes - TMC - Chenkottukonam Ward - Laying MS Pipe Line in Idathara - Kannettu - Aiyyankoikkal Road - Pipeline Work
Water Supply Schemes-Hiring of Vehicle for Revenue Mobilization-Under Water Works Section Kazhakuttom for 2026-General Civil Work
State Plan202526 CWSS to Chavara Panmana-Replacement of filter bed in 11.5 MLD water treatment plant and paving tiles in side the filter bed at WTP Sasthamcotta
KWA Revenue Procurement of thermal paper rolls for Palm held machines Under Public Health division North section offices for one year
DEPOSIT Improvement of the water supply distribution network in Jagathy Ward for ensuring reliable water supply by means of replacement laying and necessary alterations of existing and newly proposed pipelines
AMRUT 2.0 -UWSS to Thodupuzha - Replacement of various corroded distribution lines and replacement of electro mechanical items in Thodupuzha Municipality
DEPOSIT of RBDCK-Construction of Puthiyacavu Chakkuvalli ROB in Kollam District - Utility shifting - RWSS to Thazhava Thodiyoor Re laying newly layid for existing distribution line by 90mm and 140mm PVC 6kg/cm2 pipe-Chittumoola
State Plan 2026 2027 Energy Efficient Supply and Installation of FCMA soft starter for a 200 HP Slip Ring Induction Motor Supply and Installation of 630 A SSB Panel and Supply and laying of UG Cables of various sizes at the raw water
DEPOSIT Pazhayakunnummel Panchayath Replacing damaged pipe at Thottivila area in Pazhayakunnummel panchayath Pipeline Work
StatePlan20252026Procurements of Equipments for WTP Supply and Installation of Water quality testing equipments at WTPs under WS Section 2 Attingal General Civil Work
replacing old 110mm PVC pipe with 110mm PVC pipe and shifting connections to the newly laid line from kolathu temple to government girls Higher Secondary School in ward 6 of Haripad municipality for a stretch of 750m.
StatePlan 2025 2026Procurements of Equipments for WTP SSupply and Installation of Water quality testing equipments at WTPs under WS Section 1 Attingal
State Plan-State plan - 2026 - 27 -WSS TO KALLUVATHUKKAL, PARIPALLY AND VELINELOOR ( PART) VILLAGES Extending the incomplete scour line and connecting to the leading pipes to flush out the silt and waste particles at Aduthala RWPH at Kalluvathukkal
KWA Revenue Hiring of Vehicle Hiring of vehicle for project sub division Munnar for the financial year 2026 27 Pipeline Work
KWA Revenue Hiring of Vehicle Hiring of Vehicle No 1 for project sub division Kattappana for the FY 2026 27 General Civil Work
KWA Revenue Hiring of Vehicle Hiring of Vehicle No 2 for project sub division Kattappana for the FY 2026 27 under Dry Lease General Civil Work
Design Construction and Commissioning of 5 MLD capacity STP with Co treatment based on MBBR Technology inclusive of all Mechanical and Electrical components followed by Operation and maintenance O and M for 5 years
State Plan 2026-27 - KGWSS/CWSSS to Kunnamkulam - Supply, erection, testing and commissioning of 1 No. Centrifugal motor pumpset having discharge 20.7 lps and total head of 34 m including all allied works at Booster pumping station office
DEPOSIT Thrikakkara Municipality Laying of Water Supply or Casing Pipeline Across the Infopark Express Highway Pipeline Work
State Plan 2026-27 Optimisation of production and transmission-UWSS to Pala -supply erecting and commissioning of 90HP VT stand by pump set at RWPH Pala
State Plan-2025-26-Guruvayur Drainage Scheme- Supply Installation Testing and Commissioning of Sewage Transfer pump set at Sewerage Treatment Plant Chakkamkandam Guruvayur-General Civil Work
State Plan-2025-26-Guruvayur Drainage Scheme- Supply fixing and commissioning of 15HP Centrifugal drainage recirculating pump set-at Sewerage Treatment Plant Chakkamkandam Guruvayur-General Civil Work
State Plan-2025-26-Guruvayur Drainage Scheme- Supply fixing testing and commissioning of Filter Feed Pump-at Sewerage Treatment Plant Chakkamkandam Guruvayur-General Civil Work
The proposed work for providing a new roof truss for the pump house and renovation of the existing washroom is essential to protect valuable mechanical and electrical installations from weather damage
State Plan- State Plan 2026-2027 Optimization of Production and Transmission-providing drinking water facilities in Thuravoor and Kuthiyathode Panchayath- Aroor Constituency- Pipeline Work
State Plan-2026-27-Optimisation of Production and Transmission - ARWSS to Chiranellur in Choondal-Supply erection testing and commissioning of 1 No submersible motor pumpset having discharge 520 lpm and total head of 150 m including all allied works
Jal Jeevan Mission (JJM)-5th SLSSC - WSS to Chenneerkara, Omalloor Pts - Distribution work of WSS to Omalloor Pt . providing 4672 fhtcs-Design and Construction of 10LL OHSR at Parayanali and 5.5 LL OHSR at Kochukuzikkadu and Supply and laying CWPMs
Jal Jeevan Mission (JJM)-RWSS to Chittar-(8MLD Plant )-Construction of 8 MLD plant with 7 LL capacity sump at Arattukudukka
State Plan Peruva Section State Plan 2026 2027 Supply and installation of Turbidity meter and PH Meter at Mevelloor WTP General Civil Work
Deposit work Replacement of faulty water meter in Doordarshan Kendra kudappanammunnu under WW section Peroorkada
State Plan 2026-2027-UWSS to Muvattupuzha and Marady-Replacement of 250mm AC with 250mm DI K9 Pipe at Kavumpady road to Kizhakkekkara and allied works under P.H Section Muvattupuzha-General Civil Work-Pipeline Work
AMRUT_2_Chavakkad Municipality_Supplying and laying of distribution network and providing FHTCs_ Additional work_2_ Pookkulam Tank_Renovation Work_ General Civil Work
State Plan 2025 26 Supply and erection of 215 HP centrifugal pump sets having a discharge of 417 LPS against a total head of 30m at Thammanam Pump House Pipeline Work
O and M Water Supply Schemes Annual Maintenance of distribution system in RWSS to Nedumpuram and Peringara Grama Panchayaths For the year 2026 27 Pipe Line Work General Civil Work
Supply and Installation of CCTV
Supply and Installation of CCTV
Providing Cement concrete Interlock arrangement for the courtyard of Section Office Building Taliparamba
Jal Jeevan Mission (JJM)-RESTORATION WORK OF MANGALAMKUNNU CENTER TO KADAMPUR CHURCH CHAINAGE 11/100 TO 16/900-PIPE LINE WORK-Pipeline Work 2 Location of Work Palakkad
Entry and Mid Level Laptop - Notebook (Q2) (3 (3 ) )
State Plan-2026-2027- INNOVATIVE TECHNOLOGIES AND MODERN MANAGEMENT PRACTICES--SUPPLYING AND PROVIDING 350MM MAGNETIC TYPE FLOW METER FOR GLSR CHANADUKKAM-Pipeline Work
State Plan_2026_27 _Guruvayur Drainage Scheme _ Providing GS Sheet roofing for the Generator and Transformer Room _at Sewerage Treatment Plant, Chakkamkandam, Guruvayur_General Civil Work
AMRUT 2 0 Design Construction Commissioning Trial Running Operation and Maintenance for a period of 5 years of 5 MLD STP at Alissery along with 11.838 Km Sewage Collection Network in Ward No34 and 35 Old of Alappuzha Municipality and allied works
O and M Water Supply Schemes ANNUAL MAINTENANCE OF UWSS TO CHANGANACHERRY LEAK RECTIFICATION AND OTHER MAINTENANCE WORKS AT CHANGANACHERRY MUNICIPALITY FOR THE PERIOD OF 2026 2027 Pipeline Work
ANNUAL MAINTENANCE OF RWSS TO VAZHAPPALLY KURICHY AND MADAPPALLY LEAK RECTIFICATION AND OTHER MAINTENANCE WORKS AT VAZHAPPALLY KURICHY AND MADAPPALLY PANCHAYATHS FOR THE PERIOD OF 2026 2027 General Civil Work