Loading…
Loading…
262 results • Recent activity
AMC of EI Lifts Air-Conditioning and Sound system at Bikash Bhavan Comprehensive preventive and corrective maintenance and operation contract of different type AC machines installed at different places at the Bikash Bhawan Salt Lake for 01 One year
Electrical Installation works which includes lighting wiring fitting Geyser and AC machine at 7th floor of Vigyan Chetana Bhawan Salt Lake Kolkata700064
AMC of whole system at Environment Department 5th Floor ARDD Building Salt Lake Kolkata Repair and replacement of insulation of copper pipe line of existing VRF system and allied works
Repair and replacement of insulation of copper pipe line of existing VRF system at ARDD Building LB Block Salt Lake Kolkata
Urgent major electrical installation at the office room of the Joint Secretary Planning Budget Branch Room N0 514 at 5th floor School Education department Bikash Bhawan Salt Lake Kolkata 91
Renovation of Electrical Installation and Arrangement of A.C. work in Book Stall (Boighar) at Madhusudan Mancha, Dakshinapan Shopping Complex area