Loading…
Loading…
Found 18 active tenders
18 results • Latest
RENOVATION OF C.C.PASSAGE WITHALLIED WORKS AT Y-57,Y-58,Y-59 P.P.ROAD ETC IN WARD NO 138, BR-XV.
Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (ii) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.)
REPAIRING OF ROAD WITH ALLIED WORKS AT Y-110,Y-115 PANCHPARA ROAD IN WARD NO-138-BR-XV
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 3. Dismantling R.C. floor, roof, beams etc including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.(a) In ground floor including roof.
RENOVATION OF DRAIN WITH ALLIED WORKS AT T-422/2A, T-402,T-426 AMIN PARA IN WARD NO 138.BR-XV.
Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (ii) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.)
INSTALATION OF LIGHTING SYSTEM AT 197 BOOTH SURROUNDING AREAS IN WARD NO- 102, BR- XII
Outdoor Lighting Installation, Steel Tubular Pole, M.S. Pipe, G.I. Pipe, Pole CAP etc Supplying of Swaged Steel Tubular pole as per IS 2713, Pt. II, 1980 for following designation and of following dimensions.(Outside dia & thickness are given in Annexture -1) c) 4 SWG ;6.0 mtrs; 54 Kg .
RENOVATION OFC.C.PASSAGE WITH ALLIED WORKS AT T-21 TO T-192 JUGIPARA LANE IN WARDN O-138,BR-XV.
Labour for taking out old soling edging including removing debris.(a) Single flat soling
CONSTRUCTION and REPAIRING OF TOILET AT Q-157,Q-165/A,Q-156,S.P.ROAD IN WARD NO-136,BR-XV
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.