Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
8,274 results • Latest
REPAIRING OF STAFF QUARTERS, STAFF ROOMS MISC-STORE GODOWN-3 ETC INSIDE CENTRAL STORE IN WARD NO.-055.
MAINTENANCE OF SEWERAGE SYSTEM AT 2/H,6 TALTALA LANE, TALTALA BAZAR STREET, SMITH LANE AND ADJACENT AREA IN WARD NO. 53
IMPROVEMENT OF BUSTEE PASSAGE AND FOOTPATH BY C.CONC.AND PAVER BLOCK NEAR 1,ROBERT STREET, 3,MALANGA LANE ETC. IN WARD 47
MAINTENANCE OF BUSTEE DRAINAGE SYSTEMS AT SURROUNDING AREA OF 1/H/3,36E,14 AGA MEHDI STREET, TALTALA BUSTEE, N.A.LATIF STRET ETC IN WARD NO. 62
DEVELOPMENT OF C.S AND P SOFFICE, ELECTRIC ROOM, PUMP ROOM ETC UNDER SUPPLY DEPARTMENT IN WARD NO.-055.
MAINTENANCE OF PASSAGE AT 20 TALTALA BAZAR STREET, 49/1 S.N. BANERJEE ROAD ETC. AND DIFFERENT PLACE IN WARD 53
URGENT REPAIR OF POTHOLES , DEPRESSIONS AND CROSS-CUTS OF ROAD SURFACE IN WARD NO- 62
REPLACEMENT OF DAMAGED / BROKEN / MISSING PIT COVERS TO AVOID ACCIDENTS IN WARD NO.- 62
Manufacturing, supply and fitting fixing of lifting system protection guard with allied works at Rashbehari strainer of BDPS.
RESTORATION WORK OF WATER SUPPLY MAIN BY LEAK REPAIRING, CAP WASH AND ANCILLARY WORKS AT DIFFERENT AREA OF PANCHANNA GRAM, INDU PARK AND SWAROOP KALIKA PLACE IN WARD NO. 107, BR- XII.
Periodic maintenance of the Sump chamber and pump casing by removal of submerged and floating materials during monsoon Period at different pumping stations under BDPS.
Overhauling, repairing and allied works of pump unit no. 4 at JDPS under BDPS.
Supply, laying and Installation of M.S. jacketing of 800 mm diameter water main from crossing of Ultadanga Road and Canal West Road upto crossing of Ultadanga Road and Raja Dinendra Street.
Operation of 5nos. of lock gate at the junction of Boat canal and Tollynullah and 2 nos. of lock gate at the junction of Tollygunge Road and Tollynullah near CLPS / BDPS.
Supplying installation operation of 3inch Dia. portable pumps at different water logging pockets of Ward No 113.
Supplying installation operation of 3 inch Dia. portable pumps at different water logging pockets of Ward No 111.
Supplying installation operation of 3inch Dia. portable pumps at different water logging pockets of Ward No 114.
Laying of 1600 mm diameter MS Pipeline for replacing age-old PSC CC grid pipeline from Bus Depot of West Bengal Transport Corporation to Modern Food Pvt. Ltd. with ancillary wet connections along Taratala Road
IMPROVEMENT OF DRAINAGE SYSTEM BY LAYING UNDERGROUND SEWER LINE ALONG WITH ROAD RESTORATION AT KALITOLA PARK AND ITS SURROUNDING IN WARD NO. 113 UNDER BOROUGH-XI (PART-C)
IMPROVEMENT OF DRAINAGE SYSTEM BY LAYING UNDERGROUND SEWER LINE ALONG WITH ROAD RESTORATION AT SATYAJIT PARK AND JATASHREE H/O ARUN DUTTA IN WARD NO. 113 UNDER BOROUGH-XI (PART-B)
REPAIR OF ONE NUMBER FOUNTAIN AT AUROBINDA SISHU UDDYAN AND 2 NUMBERS FOUNTAINS NEAR ROAD SIDE GARDEN AT LAXMI NARAYAN COLONY ON N.S.C.BOSE ROAD,WARD NO.-100.
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLES AT DIFFERENT PLACES IN WARD NO-05 UNDER BR-I
SUPPLY AND INSTALLATION OF ONE NO. GLOWSIGN BOARD, DEWATERING PUMP SET AND OTHER ALLIED WORKS AT KALIGHAT DRAINAGE PUMPING STATION UNDER BDPS
Overhauling servicing and testing of 3 numbers of (L and T) make 1600 A Air Circuit Breaker at deeper sump under BDPS under S_D Department.
IMPROVEMENT OF STREET LIGHTING SYSTEM AT BROOKLYN AND SURROUNDING AREAS (PART NO- 91) IN WD-80.
IMPROVEMENT OF STREET LIGHTING SYSTEM AT SINGERHATI AND SURROUNDING AREAS (PART NO- 90) IN WD-80.
IMPROVEMENT OF STREET LIGHTING SYSTEM AT GARDEN REACH RD AND SURROUNDING AREAS (PART NO- 100) IN WD-80.
ANNUAL CIVIL MAINTENANCE WORK AT I.U.M. BUILDING AND GUEST HOUSE AT 36C, BALLYGUNGE CIRCULAR ROAD IN THE FINANCIAL YEAR OF 2026-2027.
REMOVAL OF SILT FROM 2 NOS. SLUDGE THICKENER TANK AND ITS INCOMING MIXING WELL AT BANGUR STP.
REPAIRING OF DAMAGED ROAD SURFACE FROM AKRA FATAK TO METIABRUZ BPS IN WARD NO-140 UNDER BR-XV
PREVENTION OF LEAKAGE AND THOROUGH REPAIRING OF DILAPIDATED 2 NOS. SLUDGE THICKENER TANK AND THEIR INLET WELL AT BANGUR STP.
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLES AT DIFFERENT PLACES IN WARD NO 111 UNDER BR-XI
SUPPLY AND DELIVERY OF LED FITTINGS AT AT ABAGAN, BOSEPARA, SUBASH PALLY ETC AREA IN WARD NO-111, BR-XI
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLES AT DIFFERENT PLACES IN WARD NO 111 UNDER BR-XI( PHASE-II).
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLES AT DIFFERENT PLACES IN WARD NO 113 UNDER BR-XI( PHASE-II)
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLES AT DIFFERENT PLACES IN WARD NO 112 UNDER BR-XI ( PHASE-II).
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLES AT DIFFERENT PLACES IN WARD NO 104 UNDER BR-XI ( PHASE-II).
MAINTENANCE OF THE SURROUNDING AREAS OF CLARIFIER NO-1,2,3 AND EASTERN SIDE CHEMICAL HOUSE AT 60 MGD WTP , IGWTP.
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLES AT DIFFERENT PLACES IN WARD NO 114 UNDER BR-XI ( PHASE-II).
LINK CONNECTION FOR THE TUBE WELL AT BIKESH GUHA KHATAL IN WARD NO-109,BR-XII
INSTALLATION OF EARTHING AND OTHER ELECTRICAL REPAIRING WORKS FOR STREET LIGHTING POLES AT DIFFERENT WATER LOGGING AREA IN WARD NO 113, BR-XI.
UPGRADATION OF FLOW CONTROLLING VALVE AND NRV ATTACH WITH THE DELIVERY END OF THE HT PUMP NO-4 AT PRESSURE STATION-3, IGWTP.
PAINTING AND NUMBERING OF KMC STREET LIGHT POLES AT NAYABAD, PANCHASAYAR, AJOY NAGAR AND OTHER AREAS UNDER WARD NO. 109, BOROUGH-XII.
LINK CONNECTION FOR THE TUBE WELL AT RANGPARA IN WARD NO- 109,BR-XII.
PAINTING AND NUMBERING OF POLES DUE TO RESTRUCTURING OF WBSEDCL POLE AND ITS OHE IN WARD NO.114, BR-XI
LINK CONNECTION FOR THE TUBE WELL AT NATUN PALLY IN WARD NO- 109,BR-XII
PAINTING AND NUMBERING OF POLES DUE TO RESTRUCTURING OF WBSEDCL POLE AND ITS OHE IN WARD NO 111, BR-XI
PAINTING AND NUMBERING OF KMC STREET LIGHT POLES IN DIFFERENT AREA AND ITS OHE IN WARD NO.104, BR-XI
STATUTORY SERVICING AND LOAD TESTING OF 12.5 MT, 5MT AND 3MT CAPACITY HOT CRANES OF PRESSURE STATION 2 AND INTAKE STATION-2, IGWTP.
RESTORATION OF THE PRIMING CUM GLAND WATER STORAGE TANK AND COLLAPSED FLOOR, SURFACE DRAIN ETC. ADJACENT PREMISES OF HT CABLE TRENCH BESIDE INTAKE STATION-2, IGWTP.