IMPROVEMENT OF SEWER LINE AT DR. RAJENDRA PRASAD SARANI IN WARD NO-45 UNDER BR-5.
ENGAGEMENT OF CONTRACTUAL SKELETON LABOUR GANG FOR ATTENDING FLOOD POCKETS AT ULTADANGA SYPHONE PUMPING STATION IN MANIKTALA SYSTEM WITHIN BR.III, DURING THE MONSOON PERIOD (W.E.F. 27.04.2026 TO 30.09.2026).
SUPPLY OF SERVICES FOR OPERATION AND ROUTINE UPKEEPING OF STREET LIGHTING SYSTEM IN WARD NO-21 UNDER BR IV
INCREASING HEIGHT OF NORTH SIDE BOUNDARY WALL OF GANDHI MAIDAN BOOSTER PUMPING STATION FOR INCREASING SAFETY OF THE BPS
SUPPLY OF SERVICES FOR OPERATION AND ROUTINE UPKEEPING OF STREET LIGHTING SYSTEM IN WARD NO-22 UNDER BR IV
ELECTRO-MECHANICAL FAULT DETECTION AND RESTORATION WORKS AT JAMES LONG CAPSULE BPS
RESTORATION OF FOOTPATH AND OTHER ANCILLARY WORKS DISTURBED BY BHARATI AIRTEL LIMITED FORM 12, ROWDON STREET TO BECK BAGAN XING IN W/63
CONSTRUCTION OF PIT, CATCH-PIT AT DIFFERENT LOCATIONS IN WARD NO 59, BR NO VII
CONSTRUCTION OF PIT, CATCH-PIT AND OTHER ANCILLARY WORK AT ABHINASH CHOWDHURY LANE, MAHENDRA CHATTERJEE LANE, ASGAR MISTRY LANE AND ITS SURROUNDING AREA IN WARD 59
RESTORATION OF CONCRETE PASSAGE AND FOOTPATH AT 73 NARKELDANGA MAIN ROAD 86, 61,100 SUREN SARKAR ROAD 6,24,35 R.M.D.G LANE 91 B.M ROAD AND DIFFERENT LOCATION IN WARD NO-033 DISTURBED BY PU AGENCIES.
RESTORATION OF ASPHALTUM ROAD SURFACE AT P-87 CIT ROAD SCH VI (M),8C/H/13 JOGODYAN LANE ,20/C M.B.LANE AND DIFFERENT PLACES IN WARD NO-31.DISTURBED BY C.E.S.C
RENOVATION OF FOOTPATH AT 1,2 HEM CHANDRA NASKER ROAD NEAR GANDHI MURTI IN WARD NO 34
MAINTENANCE OF DRAINAGE SYSTEM AT TOPSIA ROAD(S), ABHINASH CHOWDHURY LANE, TILJALA ROAD AND ITS SURROUNDINGS IN WARD NO. 59
REPAIRING OF FOOTPATH AT BROAD STREET DISTURBED BY KMC LIGHITING DEPARTMENT (FROM 42/1E TO 22/1C) AND ITS SURROUNDING AREA IN W/65
SUPPLY, INSTALLATION AND OPERATION OF 1NO. 3 INCH DIA PORTABLE PUMP WITH FUEL, LUBRICANT, HELPER, OPREATOR ETC. AT P NASKAR LANE IN WARD 67
SUPPLY, INSTALLATION AND OPERATION OF 1NO. 3 INCH DIA PORTABLE PUMP WITH FUEL, LUBRICANT, HELPER, OPREATOR ETC. AT DHARMATALA ROAD IN WARD 67
SUPPLY, INSTALLATION AND OPERATION OF 1NO. 3 INCH DIA PORTABLE PUMP WITH FUEL, LUBRICANT, HELPER, OPREATOR ETC. AT 34, C N ROY ROAD (NEAR SUNNY PARK) IN WARD 66
REPAIRING/REPLACING OR RAISING/LOWERING OF MANHOLE COVER AND CATCH PIT COVER AT DIFFERENT ROADS UNDER BR-VI.
Periodic checking and cleaning of foreign materials from the inlet channel and sump chamber by engagement of specialized man power with proper safety equipments, tools and tackles at DLPS/S and D.
SUPPLY, INSTALLATION AND OPERATION OF 1NO. 3 INCH DIA PORTABLE PUMP WITH FUEL, LUBRICANT, HELPER, OPREATOR ETC. AT WARD OFFICE W-66 IN WARD 66
SUPPLY, INSTALLATION AND OPERATION OF 2NOS. 3 INCH DIA PORTABLE PUMP WITH FUEL, LUBRICANT, HELPER, OPREATOR ETC. AT BOINCHTALA VILLAGE IN WARD 58
REPAIRING OF TRENCHES DUG BY W/S AND S and D DEPTT AT RAFI AHMED KIDWAI ROAD, AJC BOSE ROAD, BENTINCK STREET AND SURROUNDINGS UNDER BR-VI.
Repairing and replacement of essential spares of 6 inch dia portable pump mounted trolley (Pump No-2,4,5,6,7,9) of SCD(North).
SUPPLY, INSTALLATION AND OPERATION OF 1NO. 3 INCH DIA PORTABLE PUMP WITH FUEL, LUBRICANT, HELPER, OPREATOR ETC. AT 11 TANGRA 2ND LANE IN WARD 58
RESTORATION OF (P.B AND IPS) FOOTPATH DISTURBED BY DIIFFERENT PU AGENCIES AND NATURAL WEAR AND TEAR AT 127A R.B AVE, 14B,23A LANSDOWNE PL.,47N MAHANIRBAN RD,2/3 S.B ST. ETC IN WD 085.
PROVIDING AND FIXING M H COVER / G P COVER / C P COVER / INSPECTION PIT COVER IN WARD NO.57, BR-VII
A3 Size Multifunction Printer (MFP) (Q2)
RESTORATION OF PAVER BLOCK AND I.P.S. FOOTPATH/ PASSAGES AT 18 B.C.RD, 42/5, 47 A PADDAPUKUR RD ETC DISTURBED BY VARIOUS PU AGENCIES AND NATURAL WEAR AND TAER IN WD -69
REPAIRING OVERHAULING TESTING AND COMMISSIONING OF AIR CONDITIONING MACHINES INSTALLED AT HT SWITCH GEAR AND CONTROL DESK ROOMS AT CWPS PH-I AND LLPS INCLUDING OFFICERS ROOMS AND CONFERENCE ROOM OF THE ADMINISTRATIVE BUILDING UNDER GRWW.
REPAIRING AND REPLACEMENT OF COMPATIBLE COMPONENTS OF EXISTING HT VCB SWITCHGEARS FOR MOTOR FEEDER NO-1 AND 3 INCLUDING ONE SPARE FEEDER ALONG WITH TESTING AND COMMISSIONING AT CLEAR WATER PUMPING STATION PH-I, UNDER GRWW
EXTENSION OF OVERHEAD SHADE FOR SWF PUMPS UNIT AT JOKA DPS UNDER GRBU.
RESTORATION OFPAVER BLOCK,IPS FOOTPATH AND PASSAGES AT 91,125 R.B AVENUE,40,62, MAHANIRBAN RD,1,20/9, ASWINI DUTTA RD,21,25PANDITIA PLACE ETC. IN WD NO-085.
RESTORATION OF PAVER BLOCK AND IPS FOOTPATHS NEAR 198/A,196/A SARAT BOSE RD,5/1,33/B LAKE AVE ETC IN WD 087 DISTURBED BY CESC AND NATURAL WEAR AND TEAR
MAINT. OF DAMAGED ROAD SURFACE AT JADUNATH UKIL ROAD, T.M.G. ROAD, JUDGE BAGAN COLONY AND SURROUNDING AREAS IN W/N-115.
REPLACEMENT OF BROKEN CATCH PIT COVER, MANHOLE COVER ETC. IN DIFFERENT PLACES OF WARD NO. -125.
Mfg. supplying of cotton embedded rubber pad for coupling of pump - motor unit no. G,H and Gun Metal embedded rubber bushes including various heavy duty long H.T bolt, nuts, washers etc for DWF Pump Units under PBPS(Drg.)/S and D.
Thorough repairing, servicing and replacement of worn out spare parts of DWF Pump Unit No. 1 having 20 Cusec capacity with other allied works at PDPS under PBPS (Drg.)/S and D.
Restoration of non-functioning Delivery Sluice Valve as well as Pump Unit No. D (Capacity 50 Cusec and Head 8.5 m) with replacement of defective spare parts at DWF Stn. of PBPS(Drg.)/S and D.
Necessary maintenance of various Lubrication systems along with checking of all priming systems for upcoming monsoon period (5 Months) of different horizontal and vertical pumps of PBPS(Drg.)/S and D.
Replacement of dilapidated M.S supporting joist for the Strainer cleaning platform incl. provision of 3 Nos. Railing guards for both side incoming channel incl. repairing of M.S main entrance gate at CDPS under PBPS(Drg.)/S and D.
STRENGTHENING OF THREE NOS. PSC LEAKY PORTION ON 1500 MM DIA CC GRID OPPOSITE DBPL GATE NO 03 AND VESUVIOUS INDIA LTD. TOWARDS RAILGATE ON TARATALA ROAD.
REPAIRING OF TWO NOS. LEAKY PORTION ON 1600 MM DIA PSC,SS GRID INCLUDING ONE MS CLEAT OPPOSITE DBPL GATE AND VESUVIOUS INDIA LTD. ON TARATALA ROAD WITH ANCILLARY WORKS.
STRENGTHENING OF TWO NOS. 1500 MM DIA PSC, CC GRID BY MS CLEAT NEAR ANNAPURNA GARAGE AND ANOTHER OPPOSITE TO CENTURY HOUSE ON TARATALA ROAD.
STRENGTHENING OF 1500 MM DIA CC GRID OPPOSITE VESUVIOUS INDIA LTD. AND ANOTHER ON 900 MM DIA SS GRID OPPOSITE INDIAN INSTITUTE OF CEREBRAL PALSY ON TARATALA ROAD WITH OTHER ALLIED WORKS.
SUPPLYING, INSTALLING, OPERATING OF 08 NO. OF PORTABLE PUMP SETS OF 3 INCH DIA. AT 1) ARABINDA PALLY AREA, 2) EAST PARK AREA, 3) DOCTOR BAGAN AREA, 4) SUKANTA PALLY AREA, 5) RAMKRISHNANAGAR AREA, 6) SURYA SEN PALLY AREA, 7) MISSION DHALI PARA AREA A
SUPPLYING, INSTALLING, OPERATING OF 02 NO. OF PORTABLE PUMP SETS OF 3 INCH DIA. AT 1) INDIRA PALLY BUSTEE AREA AND 2) GOBAR JHURI BUSTEE AREA IN WARD NO -117.
SUPPLYING, INSTALLING, OPERATING OF 02 NO. OF PORTABLE PUMP SETS OF 3 INCH DIA. AT 1) SISIR BAGAN ROAD AREA AND 2) COCOLA BAGAN PARK AREA IN WARD NO. -120.
SUPPLY AND LAYING OF 100 MM DIA D.I PIPE AT 7, 7/1, 7/2, TELIPARA LANE(NEAR SITALA MANDIR) AND 28/1A, 28, 28/6/1, 110/16, SELIMPORE ROAD IN WARD-92
CHECKING AND CLEANING OF PUMP NO.-2 AND 3 AFTER TAKING OUT THE TOP COVER AND REPLACEMENT OF GLAND PACKING OF SAID PUMPS AT RWPS PH-I, GRWW.
FILLING OF ROAD BY RUBBISH NEAR HOUSE NO-46/N,BAGPOTA ROAD, SAPUI PARA ROAD,21,SHIBRAMPUR BY LANE AND KAMAR PARA ROAD IN WARD NO-127.