Loading…
Loading…
7 results • Latest
cleaning hoist by wire brush and applying paint ,replacing of wire ropes
Improvement to gates of Gugal barrage and prevent leakages from gates and clearance of rock debris and silt accumulated in Gugal barrage in Yadgir District
Suppy of Furniture For NRBC Division New office building
Suppy of Furniture For NRBC Division New office building
AME of Labour watchman, IB Cook, Wireman and Night Security Guard for the Year 2025-26.
Providing one IB cook at Rampur camp on out contract basis from a manpower agency For Rampur camp
Repairs to CC lining from 7.00km to 7.82km of dy 39A of ILC(Selected reaches)
Repairs to CC lining from 7.00km to 7.82km of dy 39A of ILC
Desilting of intake canal and intake approach towards the pump house of Ramathal(Marol) Ist Stage pump house
Desilting of intake canal and intake approach towards the pump house of Ramathal(Marol) Ist Stage pump house
Package work of (1) Overhauling & servicing and replacement of requisite spare parts of 5 Nos Butterfly valve and actuators,Gear box at 1st stage headwork of Ramthal (Marol) LIS.(2) Overhauling & servicing and replacement of requisite spare parts of 4 Nos Butterfly valve and actuators,Gear box at 2nd stage headwork of Ramthal (Marol) LIS, (3) Overhauling & servicing and replacement of requisite spare parts of 5 Nos Non return valve dia.1100 mm at 1st stage headwork of Ramthal (Marol) LIS
Package work of (1) Overhauling & servicing and replacement of requisite spare parts of 5 Nos Butterfly valve and actuators,Gear box at 1st stage headwork of Ramthal (Marol) LIS.(2) Overhauling & servicing and replacement of requisite spare parts of 4 Nos Butterfly valve and actuators,Gear box at 2nd stage headwork of Ramthal (Marol) LIS, (3) Overhauling & servicing and replacement of requisite spare parts of 5 Nos Non return valve dia.1100 mm at 1st stage headwork of Ramthal (Marol) LIS