Loading…
Loading…
646 results • Latest
Repairs to CD lining in Dy No-39 and 43 of MLI west canal for the year of 2026 - 27
Repairs to Side bed and side lining at Selected reaches of KM 66, 70, and 71 of MLI west canal for the year 2026 - 27
Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm
Repairs to bed and side Side lining at Chainage 46.370 to 46.470 and 48.890 to 48.900 of MLI West Canal for the year of 2026 - 27
Removal of Silt and Jungle in selected reaches of the Dy-1 Ch 2.00Km to 3.00Km and 3.50Km to 4.00Km, Dy-8 Ch 500m to 1000m, 3500m to 4000m and Dy-19 Ch 300m to 600m of tank filling scheme under Managuli Branch Canal for the year 2026-27
Due to letting of water in canal,there will be deposition of silt and debries in the canal which is obstructing the flow of water in the canal.The rain water falling on side slopes , and sum raeches heavy silt is diposited due to maintenance work is not taken for the year 2025-26. Canal will also carry soil particles and cause deposition of silt in the bed of canal. The silt is deposited throughout in the bed of main canal from Ch 46.000 to 62.00 km but we taken sum selected reaches to removing of silt for smooth flow of water of MLI west canal. it is necessary to remove the silt during every closure period of canal letting water in canal for next khariff for the year 2026-27. Jungle is also grown along the SR ,IP and side slopes of canal but we are conciderd only for SR Side which is to be cleared.It is necessarry to execute the above works during every closure period.Hence the estimate is prepared for removal of silt and Jungle of main canal from KM 46.00 to 62.00 Km of MLi west canal. And the Estimate is Prepared as approved programme for the year of 2026-27 and Sl No of work si 132.
Due to letting of water in canal,there will be deposition of silt and debries in the canal which is obstructing the flow in the canal.The rain water falling on side slopes of canal will also carry soil particles and cause deposition of silt in the bed of canal. The silt is deposited throughout in the bed of distry canal from Dy No 33 to 43 including laterals of MLI west canal. it is necessary to remove the silt during every closure period of canal letting water in canal for next khariff. Jungle is also grown along the SR ,IP and side slopes of canal which is to be cleared.It is necessarry to execute the above works during every closure period.Hence the estimate is prepared for removal of silt and Jungle of distry canal from Dy No 33 to 43 including laterals of MLI west canal.And the Estimate is Prepared as approved programme for the year of 2026 - 27 and Sl No of work si 137.
Removal of Silt and Jungle clearance in selected reaches of Malaghan west canal from Ch 15.00 to 18.00,19.00 to 24.00, 25.00 to 32.00, 32.00 to 39.00,40.00 to 41.90,42.20 to 48.60, 48.60 to 54.30km and Tank filling Dys No 9, from Ch 2.00 to 3.60 and 4.10 to 5.40,and lat No 1, ch 0.00 to 2.80, of Dy No 9 under Malaghan west Canal for the year 2026 - 27 of Malaghan west Canal.
Removal of Silt and Jungle in selected reaches of the main canal from Ch 8.00 Km to 10.00Km, 13.00 to 14.10km, 15.50 to 16.50km, 20.50 to 21.00km of Managuli Branch Canal for the year 2026-27
Due to letting of water in canal, there will be deposition of silt and debris in the canal which is obstructing the flow in the canal. The rain water falling on side slopes of canal will also carry soil particles and cause deposition of silt in the bed of canal. The silt is deposited in the bed of canal of Distrys No 12 to 18 and its Laterals in selected reaches of MLI West Canal . It is necessary to remove the silt during every closure period of canal before letting water in canal for Khariff 2026-27. Jungle is also grown along the SR/IP and side slopes of canal which is to be cleared. it is necessary to execute the above works during every closure period. Hence the estimate is prepared for removal of silt and jungle under Distry No 12 to 18 including its Laterals of MLI West Canal. And the Estimate is Prepared as approved programme for the year of 2026 - 27 and Sl No of work si 135.
Special Repairs to Distributaries of tank filling schemes under Managuli Branch canal for the year 2026-27 (Lining at Dy-1 Ch 3400 to 3450m, at Dy-8 Ch 750m to 950m, Murrum filling of DY-19 SR, M-2 of Dy-19 Chute at tail end)
Repairs to lining from Ch- 0.00 to 020mt of Dy 19, and Dy 21 of MLI west canal for the year 2026 - 27
Repairs to CD, lining in selected reaches of Dy No-12, and 13 of MLI west canal for the year 2026 - 27
Clearing grubbing road land including vegetation Excavation and removal of silt and silt mixed with sand in dry condition
Clearing grubbing road land including vegetation Excavation and removal of silt and silt mixed with sand in dry condition
Clearing grubbing road land including vegetation Excavation and removal of silt and silt mixed with sand in dry condition
Clearing grubbing road land including vegetation Excavation and removal of silt and silt mixed with sand in dry condition
Restoration of Embankment from Ch.1.510 KM to 1.850 KM of Dy-14 and from Ch.0.550 KM to 0.890 KM of Dy-18 of West Canal under CLIS.
Restoration of East Canal Head Regulator Gates of Combined Canal Y-Junction under CLIS.
Providing Oiling, Greasing and Repair works to Dys gates from 10A to 21 of ALBC.
Restoration of Head Regulator Gates, Areshankar M.I.Tank Gate and Basarakod M.I.Tank Gate of West Canal under CLIS.
Removal of Silt & Jungle Clearance from Ch. 0.00 Km to Ch. 10.00 Km of Dy-13A (Selected Reaches) of East Canal Under CLIS for the Year 2026-27.
Improvements of SR in Lateral-5,7,8 & Lateral-9 of Dy-13B Under CLIS East Canal.
Restoration of damaged selected portion of embankment and CC lining from dy15 and dy16A of ALBC
Removal of Jungle and Improvements to SR and IP From Km130.00 to 137.168(Excluding aqueduct portion ) of Chimmalagi East Main canal
Removal of Silt and Jungle clearance from Ch 25.00 to 53.00 km and Dy - 10A ,10B ,11A ,11B ,11C ,14 ,15 ,16A ,17A and 19 including its laterals under of ALBC for the year 2026-27. (Except ERM Reaches)
Removal of Silt and Jungle clearance from Dy 30 to 40 of ALBC for the year 2026-27
Removal of silt and jungle clearance from ch.110.00 to 130.00 KM(Selected Reaches) of CLIS East Canal for the year 2026-27.
Removal of Silt and Jungle clearance from Lat 11 to 20 of Dy 13A Selected Reaches of CLIS East Canal for the year 2026-27
Removal of Silt & Jungle Clearance from Ch. 0.00 KM to Ch. 2.100 KM and Distributaries No. 1 to 3 of Combined Canal under CLIS for the Year 2026-27.
Providing Oiling, Greasing and Repair works to CR/ESCAPE at Ch. 78.00,86.00 and 94.00 km of CLIS East Main Canal.
Removal of Silt & Jungle Clearance from Ch. 0.00 Km to Ch. 14.00 Km of Dy-13B (Selected Reaches) of East Canal Under CLIS for the Year 2026-27.
Removal of Silt & Jungle clearance in CLIS from Ch. 70.00 to 110.00 Km (Selected Reaches) of CLIS East Main Canal for the year 2026-27
Removal of Silt & Jungle Clearance of Distributaries No. 1 to 21 including its laterals of West Canal under CLIS for the Year 2026-27.
Repairs and refurbishment of CR/ESCAPE gates at ch 34.5km,43.5km and 49.00km of ALBC
Removal of Silt & Jungle Clearance from Ch. 0.00 KM to Ch. 53.345 KM of West Canal under CLIS for the Year 2026-27.
Removal of Silt & Jungle Clearance from Ch. 0.00 Km to Ch. 14.50 Km of Dy-22A (Selected Reaches) of East Canal Under CLIS for the Year 2026-27.
Providing Oiling, Greasing and Repair works to CR/Escape at ch 56.250KM of CLIS East Main Canal
Removal of Jungle Clearance from Ch. 00.00 KM to Ch. 50.00 KM (Selected Reaches) of East Canal under CLIS for the Year 2026-27.
Restoration of Distributaries Gates of Laterals-1, 2 & 3 of Dy-1, Dy-9 and Additional Dy-10.71 and 12.60 of Almatti Left Bank Canal.
Leakage Arrestor of Control Panel Room and Surge Tank of Raising Main at Chimmalagi Lift Irrigation Scheme Headwork.
Restoration of CTC at Ch. 1.710 KM of Dy-6 and at Ch. 42.125 KM of West Canal under CLIS.
Removal of Silt & Jungle clearance from 70.00 Km to 86.215 and Dy.No 22,23,24A,25B,26B,27,28 & 29 Including its Laterals Under ALBC for the year 2026-27
Removal of Silt & Jungle Clearance from Ch. 0.00 KM to 25.00 KM, Dy. No.1, 2, 3, 4 & 10.71 and Laterals No. 1 to 3 of Dy-1 and Laterals No. 1 to 5 of Dy-2 of ALBC Main Canal for the Year 2026-27 (Except Modernization Reaches)
Removal of Silt & Jungle Clearance of Additional Distributaries No. 4.80 of ALBC for the Year 2026-27.
Restoration of damaged portion of canal and SR formation at Dy10 ch 2.2km to 2.45 km of DC-2 TLIS
Repairs to damaged portion of CC lining at selected reaches and SR formation at selected reaches at Dy-26 of BMC.
Removal of silt and jungle at Ch. 0.00 to 33.00km (at selected reaches) of ARBC main canal and distributary
Removal of silt and jungle clearance under East main canal and West main canal of Herkal South LIS and West main canal of Herkal North LIS
Removal of silt and Jungle at Dy-3,4 & 7 (at selected reaches) of HHBC under BMC, Ch 12.00 to 14.50km (at selected reaches) of Dy-26 of BMC , Ch 0.00 to 11.20Km (at selected reaches) of Dy-33 and its laterals of BMC.