Loading…
Loading…
4,558 results • Recent activity
Thorough renovation of LT Panel, Furnace Control Panels, Air Pollution Control Panel, Lighting Panel etc and allied electrical works for smooth functioning of cremation and allied system at Dhapa Crematorium for unclaimed dead bodies
INSTALLLATION AND COMMISSIONING OF A CHIMNEY ALONG WITH AIR POLLUTION CONTROL DEVICE AT DHAPA CREMATORIUM FOR UNCLAIMED DEAD BODIES.
Supply and installation of 20 nos. CCTV cameras at some new spots, 8 nos. at electric crematorium, 8 nos. at wooden pyres area, 4 nos. at sub Registrars Office to enhance surveillance measures at Shanagar Keoratala Burning Ghat, 113, Tollygunge Road
REPLACEMENT OF DAMAGED LED LIGHT FITTINGS AT DIFFERENT AREAS IN WARD NO - 47
DEVELOPMENT OF LIGHTING SYSTEM WITH MINIMAST, GLOW SIGN BOARD AND OTHER LIGHTINGACCESSORIES WITH POLES AT B.P. TOWNSHIP, PATULI B,C BLOCK AND ADJACENT AREAS IN WARD101, BR XII
INSTALLATION OF MINI MAST POLE AND OTHER LIGHTING ARRANGEMENT AT E BLOCK AREA OF BOTH NO 282 IN WD NO -101