Loading…
Loading…
25 results • Latest
ANANT NAGAR AWAASIYA YOJANA (MOHAN ROAD) KE ANTARGAT SECTOR-1 WA 2 KE MADHYA 45.0 MTR CHAURI SADAK, TRENCH, HUME PIPE, SEWERAGE EVAM DRAIN KA NIRMAN KARYA.
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :, All kinds of soil, Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia
KANPUR ROAD YOJNA STHIT JYOTIBA FULE ZONAL PARK ME FOUNTAIN HETU RIZING MAIN KA KARYA
Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms, lifts up to 1.5 m. including getting out the excavated soil and disposal of surplus excavated soil (PSR)
KANPUR ROAD YOJNA SECTOR D1 ME SHTITH MAA TARA UPVAN GREEN BELT ME SHRI BALAJI UPVAN GREEN BELT PATHWAY LIGHT LAGAYE JANE AND TRANSFOR KI AAPURIT AND STHAPANA KA KARYA
E/W in foundation all complite as per direction of E/Ic.
Selection of Agency for Construction, Operation and Maintenance of Cafeteria at Nimbu Park Lucknow
Please Enable Macros to View BoQ information
basantkunj yojna antargat sector J ishthit green belt k adyonic vikas ewam anurakshan ka karya for 1 year
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
gomti nagar vishtaar sector 1 ishthit rana sanga park k annya pathway ka sudrikaran ewam annya awashyak karya.
Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.