Loading…
Loading…
107 live78 closing this weekmost from Madhyanchal Vidyut Vitran Nigam Ltd and Madhyanchal Vidyut Vitaran Nigam Limited Lucknow
107 results • Latest
Repairing/Maintenance Cartridge Refilling of various type Printers Installed in the Office of Executive Engineer, Assistant Engineer-I,II III, Junior Engineer-Mahanagar, Niralanagar University, Priyadarshni, Faijullaganj, Vikasnagar
RUNNING CONTRACT FOR DEPOSITED WORKS UNDER THE JURISDICTION OF ELECTRICITY DISTRIBUTION DIVISION MAHARAJGANJ, RAEBARELI
Supply and Installation of 11 kv Jointing kits of various capacities in Jurisdiction of EE, 11 KV and LT New alambagh Amousi Zone Lucknow
Replacement and transportation of Damage transformer in jurisdiction of EE, 11 KV and LT Kakori Amousi Zone Lucknow against short tender E tender No 48/SE(T)/ Amausi/ 2026-27
67/SE(T)/LCZ/2026-27
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - As Per ATC/BOQ; As Per ATC/BOQ; As Per ATC/BOQ
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra XUV300, Mahindra Bolero; 2022; 0-25, 000 kms; A/C; 12
Fuse Wire Used in Rewirable Type Electric Fuses up to 650 Volts Conforming To IS 9926 (Q3), Electrical Cable Lugs (Q3) (3 (3 ))
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero; 2020; As per ATC; A/C; As per ATC
46/E.D.C.(G.)/2026-27
47/E.D.C.(G.)/2026-27
Manpower Outsourcing Services - Minimum wage - Skilled; Asper ATC; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Asper ATC; Others
Handling and Transport on Lumpsum Basis - As per BOQ/ATC
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - As Per ATC/BOQ; As Per ATC/BOQ; As Per ATC/BOQ
QUANTUM OF WORK shedule of maintenance and attending breckdown 33 11 4 KV line of 33 11 KV Sudstation Ajgain And Sohramau EDSD I Ajgain under the area of Electricity Distribution Division V Hasanganj Unnao
Quantum of works involved in erection of wire mess fencing at 400 250 KVA distribution transformer installed at different places under the area of EDSD Purwa And Maurawan under Electricity Distribution Division Purwa Unnao
Quantum of Work for Construction of different consumers under deposit scheme of in the area of EDSD I Bangarmau under EDD IV Bangarmau Unnao.
Quantum of works involved in erection of wire mess fencing at 400 250 KVA distribution transformer installed at different places under the area of EDSD Patan And Bhagwant Nagar under Electricity Distribution Division Purwa Unnao
RUNNING CONTRACT FOR DEPOSITED WORKS UNDER THE JURISDICTION OF ELECTRICITY DISTRIBUTION DIVISION MAHARAJGANJ RAEBARELI
Facility Management Services - LumpSum Based - Extension of control room at 33 11 KV SubStation Neri and Sanda District Sitapur; Civil Work; Consumables to be provided by service provider (inclusive in contract cost)
Goods Transport Service – Per Trip based Service - Heavyweight/Over Dimensional Cargo, Pole; Open Body Taurus; 27 FT Truck
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - As per BOQ/ATC; As per BOQ/ATC; As per BOQ/ATC
Handling and Transport on Lumpsum Basis - As Per BOQ/ATC Hiring of 2 Nos Diesel Vehicle for EE ESD Ayodhya and Gonda
Estimate of Quantum of works involved for repairing of Under ground 11 KV XLPE cable at different sire under the area of EDD PD Nagar Unnao
Quantum of works for Construction of New 11 KV Underground Overhead line for Releasing Connection to Jal Jivan Mission under full deposit scheme in the area of under the EDD Purwa Unnao
58/SE(T)/GNZ/2026-27
57/SE(T)/GNZ/2026-27
INSTALLATION OF OTI WTI LA CT PT RELAY PANELS BATTERY SETS AND BUS ISOLATORS AT 33/11 KV SUB STATIONS AT BACHHRAWAN VISHUNPUR CHANDAPUR MAHARAJGANJ SHIVGARH OSAH BUSINESS PLAN 2026-27
PCC pole 9 m long, STP 11 mtr long, ACSR Dog conductor., 33 KV XLPE Cable (3x120 sq. mm), 33 KV O/D Cable box size 3x120 sq. mm, 33 KV I/D Cable box size 3x120 sq. mm, 34 KV I/D Straight through size 3x120 sq. mm, 33 KV line isolator, 33 KV Metering pilfer proof CTR 30/1 amp, 3-Ph 4 wire 33 KV feeder meter HT TVM meter, Other Line Material. (T-off, dropper, top channel, disc insulator with fitiing, pin insulator with fitting, stay complete, earthing complete material etc.), Fixing, errection & grouting of double pole on 9/11 mtr. Long PCC/STP pole along with fixing of necessary hardware of doble pole alongwith necessary pin insulators disc insulators as per RESPO specification and direction of E/I., Grouting of STP 11 m long poles including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand: brick ballast: cement)., Ordinary earthing by MS earth Rod 2500mm long as per RESPO Schedule. Only GI wire& Earth rod shall be supplied by the department., Grouting and Nuzzling of stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand: brick ballast: cement). Only Stay wire shall be supplied by the Department., Laying and sagging of 3 phase 3 wire 33KV line on ACSR weasel/rabbit/Raccoon/Dog conductor as per RESPO specification and direction of E/I., Laying of 33KV XLPE cable (3x120 sq. mm) by Horizontal Directional Drilling (HDD) method, passed through a 140 mm diameter MS HDPE pipe with providing all related T&P and materials. The entire cable laying work shall be executed as per RESPO specifications, Muffling/Nuzzling of poles upto 1.5 ft height of pole from ground level, Road restoration Charges for Pucca/footpath road with all T&P provided by the contractor, Hoisting of 33KV XLPE Cable passed through G.I pipe 6 dia at double poles which is duly clamped with the pole at the bottom, middle, and top. with providing all related T&P and materials The entire cable laying work shall be executed as per RESPO specifications, Work for earthing of metering pilfer, 33 Kv line isolator structure with G.I. Pipe type earthing pipe size 3cm dia from ground up-to the water level (Minimum 20 feet deep) as per standard practice (All materials shall be provided by the contractor), Construction of Bay structure for installation of 33 KV line isolator and installation of isolator alongwith grouting of the structure, complete job with all T&P provided by contractor., Installation of 33 KV metering pilfer CTR 30/1 amp along with all T&P, Fixing of 33 KV Cable joining kit O/D., Fixing of 33 KV Cable joining kit I/D., Fixing of 33 KV Cable joining kit Straight through, Dismantling of old & damaged ST poles with unloading/unloading of scrap from site to Electricity Distribution store Lakhimpur, Consultation & cordination for railway crossing with providing route maps and related documents, Consultation & cordination for Electrical Safety charges with providing route maps and related documents, Supply & fixing of Stay insulator, Supply & fixing of Stay Clamp, Supply & fixing of Earth wire clamp with bolt &nuts, Supply & fixing of G.I Pipe 6"dia, Supply & fixing of clamp for G.I Pipe 6"dia, Supply of HDPE pipe 140 mm, Supply & fixing of Danger board with clamp, bolts and nuts, Supply & fixing of PG Clamp for dog with bolts &nuts, Supply & fixing of Clamps with bolts and nuts for T-off, top channel etc, Supply & fixing of bolt & nuts for complete setting., Supply & fixing of route board with clamps, nuts and bolts, Supply & fixing of warning tape
Facility Management Services - LumpSum Based - Repairing of Tank Mould and Construction of Pathway for C B Ganj Pole Unit Bareilly; Civil Work; Consumables to be provided by service provider (inclusive in contract cost)
Carriage of PCC/STP pole and line material from ESC, Lakhimpur to work site (Aprox distance 0 to 90 KM), Carriage damage line material/scrap material site to store center Lakhimpur (Aprox distance 0 to 90 KM)., Carriage of other line material such as conductor X-arm, pin insulator, disc insulator, guarding angle etc., Dragging of ST/PCC pole to pit site, digging and erection (as per RESPO norms) of 11 KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11 KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification., Streightning of tilted STP Poles 11 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Streightning of tilted PCC Poles 8.5 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Regrouting of Damage Stay (for STP Pole), Regrouting of Damage Stay (for PCC Pole), Resagging of loose conductor of 33 KV line including opening of binding & rebinding after sagging of conductor., Resagging of loose conductor on 11 KV line including opening of binding & rebinding after sagging of conductor., Streightning of tilled cross arm of 33 KV line including proper tighting of Clamp and fitting of Pin insulators., Streightning of tilled cross arm of 11 KV line including proper tighting of Clamp and fitting of Pin insulators., Cutting of tree branches near 33 KV line to avoid tripping., Cutting of tree branches near 11 KV line to avoid tripping., Repair/Replacement of burned jumper on sectional poles., Repair of Damaged guarding of 33 KV line., Repair of Damaged guarding of 11 KV line.
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra TUV300, Mahindra XUV300, Mahindra Scorpio, Mahindra Bolero; 2025; 1500; A/C; 24
Running Contract for Deposit Works under EDD-Baheri
REPLACEMENT OF DAMAGED ISOLATORS AND BATTERY CHARGERS AT THE SUB STATIONS AT REHWA GURUBUXGANJ UTTARPARA BHUYEMAU SIDHAUNA ATAURA DAREEBA HARCHANDPUR TALA AND PORAI UNDER THE JURISDICTION OF ELECTRICITY DISTRIBUTION DIVISION TRIPULA RAEBARELI BP
Dismantling of 11 KV line and LT Line with its dump at suitable place on site up to completion of work and its safe loading/unloading/weithing carriage from dump site to je's store (including broken STP/PCC Pole)., PCC pole 8.5 Mtr long, PCC pole 11 Mtr long, ACSR Weasel Conductor, ABC( 3x/95 + 1x70 + 1x16) Sqmm., ABC( 3x50 + 1x35 + 1x16) Sqmm., 11 kv Composite Polymer Pin Insulator., 11 kv Comp. Poly. Disc Insulator 45 KN., 11 KV V-Type Steel Cross Arm 65x65x6 mm, Earth Rod 2540x20 mm, LT Distribution Box, Stay Set 16x1800, Stay Wire 06 SWG, Other Line Material., Dragging of PCC pole to pit site, digging of pit erection and grouting (As per RESPO norms) of single pole 8.5 m long PCC Pole along with fixing of necessary hardware of single pole such as V-type X-arm, F-bracket, 11KV Pin/Disc insulator, guarding angle & LT Clamp etc. (1.8 mm65x65x6) with nut & boltsas per RESPO specification and direction of E/I., digging of pit erection and grouting (As per RESPO norms) of single pole 11 m long PCC Pole along with fixing of necessary hardware of single pole such as V-type X-arm, F- bracket, Fixing and errection of double poles on 11 mtr. Long PCC pole along with fixing of necessary hardware (Top channel, dropper, pins, disc etc) of doble pole alongwith necessery pin insulators and grouting as per RESPO specification and direction of E/I., Ordinary earthing by MS earth Rod 2500mm long as per RESPO Schedule. Only GI wire& Earth rod shall be supplied by the department., Grouting and Nuzzling of stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (Sand: brick ballast: cement). Only Stay wire shall be supplied by the Department., Laying and stringing of 3 phase 3 wire 11 KV line on ACSR weasel/rabbit/Raccoon/Dog conductor as per RESPO specification and direction of E/I., Laying of ABC (3X95+1X70+1X16) Sqmm., Laying of ABC (3X50+1X35+1X16) Sqmm., Making section of 11 KV line by fixing of All necessary accessories such as T-Off channel disc insulator with fitting pin insulator with pin along with sagging jumpering and binding etc only insulator shall be provided by the dept., Erection and installation of barbed wire/danger board/Number plate/G.I. pipe 6 dia/, Holding Clamp for PCC Pole 8.5 Mtr., LT Clamp with Eye Hook., Stone Pad, Stay Clamp, 11 KV F clamp for PCC Pole, P.G Clamp Panther to Panther Conductor., Nuts & Bolts, Barbed wire, Distribution box Clamp
Facility Management Services - LumpSum Based - Extension of Control room at 33 11 KV Sub Station Mampur Bana and Sadhamau BKT Jankipuram zone Lucknow; Civil work; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Extension of SGR at 33 11 KV Sub Station ITI Raebareli; Civil Work; Consumables to be provided by service provider (inclusive in contract cost)
Carriage of PCC/STP pole and line material from ESC, Lakhimpur to work site (Aprox distance 0 to 55 KM), Carriage damage line material/scrap material site to store center Lakhimpur (Aprox distance 0 to 55 KM)., Carriage of other line material such as conductor X-arm, pin insulator, disc insulator, guarding angle etc., Dragging of ST/PCC pole to pit site, digging and erection (as per RESPO norms) of 11 KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11 KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification., Fixing and errection of double pole on 11 mtr. Long ST pole along with fixing of necessary hardware of double pole alongwith necessery pin insulators and grouting as per RESSPO specification and direction of E/I., Streightning of tilted STP Poles 11 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Streightning of tilted PCC Poles 8.5 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Grouting of PCC and ST Pole with civil material (cement: Coarse sand:Stone ballast in 1:2:3 ratio) with grouting of pole upto 0.3 mtr. Above ground level (as per RESPO norms). Only pole shall be supplied by the Department., Regrouting of Damage Stay (for STP Pole), Regrouting of Damage Stay (for PCC Pole), Resagging of loose conductor of 33 KV line including opening of binding & rebinding after sagging of conductor., Resagging of loose conductor on 11 KV line including opening of binding & rebinding after sagging of conductor., Streightning of tilled cross arm of 33 KV line including proper tighting of Clamp and fitting of Pin insulators., Streightning of tilled cross arm of 11 KV line including proper tighting of Clamp and fitting of Pin insulators., Cutting of tree branches near 33 KV line to avoid tripping., Cutting of tree branches near 11 KV line to avoid tripping., Repair/Replacement of burned jumper on sectional poles., Repair of Damaged guarding of 33 KV line., Repair of Damaged guarding of 11 KV line.
Carriage of PCC/STP pole and line material from ESC, Lakhimpur to work site (Aprox distance 0 to 55 KM), Carriage damage line material/scrap material site to store center Lakhimpur (Aprox distance 0 to 55 KM)., Carriage of other line material such as conductor X-arm, pin insulator, disc insulator, guarding angle etc., Dragging of ST/PCC pole to pit site, digging and erection (as per RESPO norms) of 11 KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11 KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification., Fixing and errection of double pole on 11 mtr. Long ST pole along with fixing of necessary hardware of double pole alongwith necessery pin insulators and grouting as per RESSPO specification and direction of E/I., Streightning of tilted STP Poles 11 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Streightning of tilted PCC Poles 8.5 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Grouting of PCC and ST Pole with civil material (cement: Coarse sand:Stone ballast in 1:2:3 ratio) with grouting of pole upto 0.3 mtr. Above ground level (as per RESPO norms). Only pole shall be supplied by the Department., Regrouting of Damage Stay (for STP Pole), Regrouting of Damage Stay (for PCC Pole), Resagging of loose conductor of 33 KV line including opening of binding & rebinding after sagging of conductor., Resagging of loose conductor on 11 KV line including opening of binding & rebinding after sagging of conductor., Streightning of tilled cross arm of 33 KV line including proper tighting of Clamp and fitting of Pin insulators., Streightning of tilled cross arm of 11 KV line including proper tighting of Clamp and fitting of Pin insulators., Cutting of tree branches near 33 KV line to avoid tripping., Cutting of tree branches near 11 KV line to avoid tripping., Repair/Replacement of burned jumper on sectional poles., Repair of Damaged guarding of 33 KV line., Repair of Damaged guarding of 11 KV line.
Carriage of PCC/STP pole and line material from ESC, Lakhimpur to work site (Aprox distance 0 to 55 KM), Carriage damage line material/scrap material site to store center Lakhimpur (Aprox distance 0 to 55 KM)., Carriage of other line material such as conductor X-arm, pin insulator, disc insulator, guarding angle etc., Dragging of ST/PCC pole to pit site, digging and erection (as per RESPO norms) of 11 KV 9/11/8.5 mtr long ST/PCC pole with fixing of necessary items, such as V-type X-arm, F-bracket, 11 KV Pin/Disc insulator, guarding angle(1.8 mm65x65x6) with nut & bolts its ramming as per RESSPO Specification., Fixing and errection of double pole on 11 mtr. Long ST pole along with fixing of necessary hardware of double pole alongwith necessery pin insulators and grouting as per RESSPO specification and direction of E/I., Streightning of tilted STP Poles 11 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Streightning of tilted PCC Poles 8.5 Mtr. Long by digging of Pole opening of binding on insulator refitting of earth and raining and binding of conductor on insulator., Grouting of PCC and ST Pole with civil material (cement: Coarse sand:Stone ballast in 1:2:3 ratio) with grouting of pole upto 0.3 mtr. Above ground level (as per RESPO norms). Only pole shall be supplied by the Department., Regrouting of Damage Stay (for STP Pole), Regrouting of Damage Stay (for PCC Pole), Resagging of loose conductor of 33 KV line including opening of binding & rebinding after sagging of conductor., Resagging of loose conductor on 11 KV line including opening of binding & rebinding after sagging of conductor., Streightning of tilled cross arm of 33 KV line including proper tighting of Clamp and fitting of Pin insulators., Streightning of tilled cross arm of 11 KV line including proper tighting of Clamp and fitting of Pin insulators., Cutting of tree branches near 33 KV line to avoid tripping., Cutting of tree branches near 11 KV line to avoid tripping., Repair/Replacement of burned jumper on sectional poles., Repair of Damaged guarding of 33 KV line., Repair of Damaged guarding of 11 KV line.