Loading…
Loading…
2,417 results • Latest
Making shed at electrical sub-station of Basundhara Area.
Integrated Civil Infrastructure Works incl. const. of PQC approach roads for boom barriers, culverts and approach to weigh bridges no. 4, 5 and 7 and concrete roads from HEMM workshop to MTK, CHP Gate, Platform Development, Kulda OCP, Basundhara Area
Shifting of existing viewpoint to new location (OSL Patch side) for expansion of Ananta OCP mines under Jagannath Area
15 FT FRP LADDER, Platform Step Ladder (V2), 40 FT FRP LADDER, 24 FT ALLUMINIUM LADDER
CSIR-CIMFR Devloped Chemical Inhibitor
Laying of Paver Block for Pathway in Plantation area of Mine No.-4 under Orient Sub Area, Orient Area.
Repairing and renovation of CDS and lamp room including other miscellaneous civil work of OC- 01 and 02 under Orient Sub Area, Orient Area
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - NDT; Deflection measurement data (Load Test), Magnetic Particle Testing, Ultrasonic Testing Facility, Penetrant Testing Facility; NABL Labs
Pneumatic Barrel Pump (Q3)
HYDRAULIC OIL-ISO VG 46, HN GRADE, OIL AUTO, ENG, CI4 15W40, CAT DEO, 3E9840, OIL AUTOMTV, C4 SAE30, CAT TDTO 30, 9X6466, Antiwear Hydraulic Oil, Extra Heavy Duty Type (V3) Conforming to IS 11656
Monthly Basis Cab & Taxi Hiring Services - SUV; 4262 kms x 682 hrs; Local 24*7
Custom Bid for Services - NIT147 Upkeeping of VIP Guest House Dormitory Building and Driver Shelter beside DTs Bunglow Yoga Centre Directors Bunglow and Transit Camp under Bharatpur Area For Two Years Similar Category Hiring of Sanitation Service - Manpower Based Model
Monthly Basis Cab & Taxi Hiring Services - SUV; 3410 kms x 682 hrs; Local 24*7
Repairing and Replacement of Damaged Water Supply Pipeline from HEMM Workshop to MGR Siding including Restoration of Bathroom Facilities at Siding office under Lingaraj OCP, Lingaraj Area.
ROTATING UNIT COMPLETE_PART NO.ROT001GST250300, NECK RING _SUC. and DEL._ SET OF 4NO_ BRNZ_PART NO.1181, BEARING CARTRIDGE NDE_PART NO.2601, BEARING CARTRIDGE DE_PART NO.2600, SHAFT _R.H_ _SS431T__PART NO.18001000, SHAFT SLEEVE and NUT _DELIVERY__ SS410_PART NO.2102, SHAFT SLEEVE and NUT _SUCTION__ SS410_PART NO.2103, BEARING HOUSING _D.E._- CI_PART NO.2761GST250300, BEARING HOUSING _N.D.E._ - CI_PART NO.2764GST250300, INTERMEDIATE BEARING BUSH CARRIER_ CI_PART NO.2802, INTERMEDIATE BEARING BUSHbyINTER STAGE BU_PART NO.2801GST250300, INTERMEDIATE BEARING SLEEVE _DE__ SS410H_PART NO.2834, INTERMEDIATE BRNG SLEEVE _NDE__ SS410H_PART NO.28341, BEARING END COVER _NDE_ OUTER_ 500GST_PART NO.2756500, BEARING END COVER _NDE_ INNER_ 500GST_PART NO.2755500, BEARING END COVER _DE_ OUTER_ 500GST_PART NO.2753500, BEARING END COVER _DE_ INNER_ 500GST_PART NO.2752500, GLAND PACKING_PART NO.2410, AIR VENT COCK_PART NO.4230, GASKET_PART NO.4080, O RING _INTERMEDIATE BEARING SLEEVE__PART NO.42501, O RING SHAFT SLEEVE_PART NO.4250, SLEEVE NUT SS410 _L.H.__PART NO.3031GST250300, SLEEVE NUT SS410 _R.H.__PART NO.3032GST250300, LOCK NUT _M.S__PART NO.30101000, LOCK WASHER _M.S.__PART NO.30201000, KEY FOR COULPING _SS410__PART NO.32501100, KEY FOR IMPELLER _SS410__PART NO.32001100, THRUST COLLAR _EN8__PART NO.28841100, STUFFING BOX BUSH _LTB5__PART NO.24021100, IMPELLER - SUCTION SIDE - LG.2_PART NO.1506GST250300, IMPELLER - DELIVERY SIDE - LG.2_PART NO.1509GST250300, GLAND SPLIT - CI_PART NO.2310GST250300, WATER DEFLECTOR _INT. NDE SIDE__PART NO.20701SS316, CASING TOP and BTTM WITH GSKT_FSTNRS_BEND_PART NO.100110021003
Construction and posting of 09 (nine) numbers of Base pillars in WGS84/UTM Co-ordinate system for drone-based photogrammetry surveys as well as surveys to be conducted by DGPS and 3DTLS based measurements of coal stock and OB removal on daily/ month
Construction of 03 Nos Ladies Toilets At E and M Workshop, DG Room, Coal Despatch Office and Sub-Station Of Hingula OCP Under Hingula Area.
Repairing of submersible pumps as and when required at Garjanbahal OCP and Kanika Siding under Basundhara Area
Repairing of the pipeline incl. nozzles, sprinklers etc. for dust suppression purpose at CHP and RLS including at truck receiving station and within the plant premises, Bharatpur OCP
Fabrication/making of pump and motor sheds (10 nos) on pontoons for HT pump sets running at sumps of Lingaraj OCP, Lingaraj Area
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Day to day maintenance of GM office, DAV school and Central Colony Dispensary with gardening works including sweeping, cleaning of toilets and other repair works of GM office premises under Hingula Area for a period of 730 days (Re-Tender)
Upgrading of existing Badminton court with Wooden Flooring (AB Grade Maple Floorboard) at Indradhanush club and BTI Hostel at BIT of Lakhanpur Area (1st Retender)
Monthly Basis Cab & Taxi Hiring Services - MUV; 2500KM Per Month; Outstation 24*7
Toner Cartridges/Ink Cartridges/Consumablesfor Printers (Q2)
Allow Slip/Entry Slip, Xerox Paper (Size-A4) (Light Yellow Colour Paper), Challan Book, Tripman Report
Repairing of the departmental explosive Van bearing Regd. No - OD-35C-7277 deployed at Lingaraj OCP, Lingaraj Area
Rearrangement and diversion works of 3.3kv feeder no10 and 11 from Mega ramp to sump no. 04 for facilitating space for dumping works inside the mine at Lingaraj OCP , Lingaraj Area
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Cleaning and Up keeping of Balinga Police Station for 01 Year at Kulda OCP, BA (3nd Re Tender)
Custom Bid for Services - For assistance in day to day survey work at different places of mine at Lajkura OCP as per direction of mine management for execution of work at site with providing 03 nos. of unskilled manpower daily for 730 days Similar Category Manpower Outsourcing Services - Man-days based Manpower Outsourcing Services - Minimum wage
Transformer Protection Relay
Providing of tarpaulin covering arrangement by providing shed and platform with auto locked rescue pulley system at exit of coal tippers at Garjanbahal OCP of Basundhara Area
Comprehensive annual maintenance contract of all residential buildings, non-residential buildings, swimming pool and all fountains of Jagriti Vihar for two years.
Repairing and maintenance of Non- Residential Building at Jagannath Colony under Jagannath Area for a period of 02 ( two ) years
Emergency breakdown repairing, maintenance and testing of HT and LT Electrical Equipments OCBs, VCBs, Power Transformers and Pump Starter Panels for a period of 730 days at Balanda Colony of Jagannath Colliery as when as required
Renovation of viewpoint and its surroundings in Lajkura OCM of Ib Valley Area
Providing power supply arrangement for newly constructed railway building at north portion of SOCP mine IB Valley Area.
Monthly Basis Cab & Taxi Hiring Services - SUV; 4000KM per Month; Outstation 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 2800 Km run per month; Local
Diversion of 11kv MIMSAR feeder for Clearing hindrances for bridge construction near Balanda black diamond stadium with cabling work
Day to day maintenance repair activities n fittness test works to be carried out for deparmental vehicles deployed under Ananta OCP,JA as and when required basis for a period one year
Hiring of Consultancy Services - Percentage based - 24190000; 24190000; No; Hybrid(As specified in scope of work)
Leasing of Electric Vehicles (Long Term) - Wet Lease; Mahindra XUV 400 EL Pro, Tata Nexon Fearless 45 EV, TATA NEXON EV - MAX; 2500 Km per month, single driver with staggered rest; 36 Months Lease; White
Handling, Transport and Other Mining Services - Percentage quote based - OB Removal Work Jagannath OCP Jagannath Area MCL
Providing and fixing of pipili lights, aluminium wires and retro reflective boards at different places of Central Hospital, IB Valley Area.
Construction of permanent concrete coal transportation road from Kalimandir chhak to weighbridge no-6 inside Handidhua Coal stock and field substation to weighbridge no.8 ramp of Ananta OCP under Jagannath Area.
Fabrication of 05 Nos. of base plate and stand for starter of Quarry pump at LOCP, IBVA
Appointment of Internal Auditors for a period of 3 years from 2026-27 to 2028-29.