Loading…
Loading…
168 results • Latest
M and R to Akola indl area Upkeepment of industrial area phase1 2 3 of Akola industrial area year 2025 26
Excavation for catch/side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. (Item No. 2.18)
DG ADDL AMRAVATI NANDGAON PETHM and R to PWSS at Addl Amravati Industrial Area Providing Electrical insulation flooring treatment at WTP Dawargaon and Morshi Jackwell
M & R to PWSS @ Addl. Amravati Industrial area...Providing Electrical insulation flooring treatment at WTP (Dawargaon) and Morshi Jackwell.
M AND R to PWSS Akola indl area Asphalting Treatment of BM BC to internal road in WTP
Repair to pot holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or any appropriate method filled with 75mm B.M, applying bitumen tack coat at the bottom and vertical sides as per as per MORTH specification clause 3004.1 and 3004.2 (Item No. 8.06)
M AND R to streetlight Akola GC and Murtizapur GC Operation and comprehensive maintenance of streetlight for year 2025 26
M&R to Street Lights @Akola Growth centre .......Operation & Comprehensive maintenance of street lights for year 2025-2026
AKOLA CGGC INDUSTRIAL AREA M and R to Roads Akola Growth Centre Providing Strengthening treatment to internal road road with 50 mm thick DBM 25 mm thick BC in N layout Akola GC
Work Portion
NA...M. and R. to PWSS at Umred, Katol and Saoner G C and IWSS at Parsheoni, Kuhi, Narkhed and Bhiwapur MIA..... Repairs of leakages on RW pipelines and distribution lines for year 2026-27.
Sub Estimate-I-M. & R. to PWSS at Umred Growth Centre