Loading…
Loading…
Found 15 active tenders
15 results • Latest
Construction of Nashik Ring Road (southwest side) from Design chainage 28.970 to 39.700 (Length 10.730km) Package7
Package 7 - Construction of Nashik Ring Road (southwest side) from Design chainage 28.970 to 39.700 (Length = 10.730km) under EPC mode
Construction of Nashik Ring Road (Southern side) from Design chainage 14.950 to 28.970 (Length 14.020km) Package6
Package 6 - Construction of Nashik Ring Road (Southern side) from Design chainage 14.950 to 28.970 (Length 14.020km) under EPC mode
Construction of Nashik Ring Road (Southeast side) from Design chainage 8.140 to km 14.950 (Length 6.810km) Package5
Package 5 - Construction of Nashik Ring Road (Southeast side) from Design chainage 8.140 to km 14.950 (Length 6.810km) under EPC mode
Construction of Nashik Ring Road (Eastern side) from Design chainage 0.500 to 8.140 (Length 7.640km) Package4
Package 4 - Construction of Nashik Ring Road (Eastern side) from Design chainage 0.500 to 8.140 (Length = 7.640km) under EPC mode
Construction of Nashik Ring Road (Northwest side) from Design chainage 14.500 to km 26.500 (Length 11.700 km) excluding 01 nos. Major Bridge at chainage 22.025 (150m) with approaches Package 3
Package 3 - Construction of Nashik Ring Road (Northwest side) from Design chainage 14.500 to km 26.500 (Length = 11.700 km) excluding 01 nos. Major Bridge at chainage 22.025 (150m) with approaches under EPC mode
Construction of Nashik Ring Road (Eastern side) from Design chainage -0.500 to 0.500 (Length 1.500km) including 02 nos. Major Bridges at chainage 11.300 (100m) and 22.025 (150m) with approaches. Package 1
Package 1 - Construction of Nashik Ring Road (Eastern side) from Design chainage - 0.500 to 0.500 (Length 1.500km) including 02 nos. Major Bridges at chainage 11.300 (100m) & 22.025 (150m) with approaches under EPC mode