Loading…
Loading…
5 results • Latest
Providing overhead tank near hatchery shed, MU.
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Repairing of Type V Block I quarter No 3 of MU.
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Repairs and Improvements at Room No. 222, 223 and 224 in the Department of Zoologys Fishery Section.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable materialwithin 50 metres lead as per direction of Engineer-in-charge. In Cement mortar
Renovation/Repairing of water body and its surrounding in front of PESS Depratment M.U.
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Construction of hatchery Shed, brooder pond and Nursery pond for Life Science Dept, MU.
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.