Loading…
Loading…
5 results • Latest
Selection of Operator for Establishment of Construction AND Demolition (C AND D) Waste Processing Plant of 100 TPD capacity with Operation AND Maintenance for 10 Years in Meerut City under Meerut Municipal Corporation
Establishment of Construction & Demolition (C&D) Waste Processing Plant of 100 TPD capacity with Operation & Maintenance for 10 Years inMeerut City under Meerut Municipal Corporation (EPC MODE)
Selection of Operator for Operation Maintenance (O M) for Material Recovery Facility (MRF) Centres in Nagar Nigam Meerut in accordance with Solid Waste Management Rules, 2016
Ganwari (Unit-1)
Repair and Installation of Ballistic Separator at Gawari Plant.
BALASTIC SEPARATOR REPAIRING & INSTALLATION
Repair and Installation of Trommel Screen, Appron Feeder, Feeding Belt, Gear Box, Conveyor Belt, etc. of 600 TPD Waste Processing Plant at Gawari Plant.
APPRON FEEDER
Selection of Bidder for Mechanical, Manual Sweeping of Roads and Cleaning Services in Commercial Areas of Meerut Municipal Corporation for a Period of Five Years
Comprehensive Mechanical &Manual Sweeping and Integrated Sanitation Services: Provision of end-to-end cleaning services for the designated road network of Meerut Municipal Corporation. The scope includes, but is not limited to: 1. Mechanical Sweeping of major roads and Manual Sweeping of internal/commercial roads and footpaths (including litter collection and disposal). 2. Drain Cleaning: Desilting and cleaning of all open drains (width < 1m) adjacent to the roads. 3. High-Pressure Jetting: Washing of roads, footpaths, public urinals, and toilets to ensure stain-free and odour-free conditions. 4. Dust Suppression: Operation of water sprinklers and anti-smog guns. 5. Ancillary Services: Tree pruning, bushcutting, and removal of horticulture waste. The rate is all-inclusive of monpower, mochinery, fuel, PPE, GPS/Real-time tracking, ond administrative costs. Payment is strictly subject to real-time data verification and post-LOA survey results. Post LOA Survey shall only validate road length +5% beyond which approval competent authority required.