Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
840 results • Latest
Beautification work of the park opposite House No. 72/11 (Manmohan Guptas residence) in Ward-61, Shastri Nagar Sector 11.
Installation of the statue of the late Chaudhary Charan Singh Ji in Banke Bihari Park, located behind Aryan School in Ward 57, Pallavpuram Phase 2
Work of temporary street lighting during Kavad Yatra 2026 within the Municipal Corporation limits.
Construction of an RCC drain and slab near Madina Masjid on the Delhi-Haridwar bypass road in Ward-06, Dungravali.
Work of installing barricades to close the gaps in the road divider between Hapur Adda and Bharat Mata Chowk.
Work involving the installation of barricading to close the gaps in the road dividers on the stretch from Sardhana Road to Tack Crossing and from Saket Crossing to Jail Chungi Crossing.
Work of installing barricading at the openings in the road dividers for the Kanwar Yatra, covering the stretch from Delhi Road Football Chowk to Mohiuddinpuram.
Work regarding the installation of barricading at the openings in the road dividers for the Kanwar Yatra, covering the stretch from Hapur Adda Crossing to the Lohiyanagar Dumping Ground toll road.
Installation of barricading on Roorkee Road within municipal corporation limits from Shobhit University to Partapur Flyover and from Modipuram Flyover to Gandhi Bagh Crossing, on the occasion of Shivratri.
Work of installing barricading at the openings in the road dividers along the stretch from Begumpul to Football Chowk on Delhi Road for the Kanwar Yatra.
Work of installing barricading at the openings in the road divider between Tejgarhi Crossing and L-Block T-junction.
Work to install barricading at the openings in the road dividers on the stretch from Hapur Bus Stand to the Kali River, in view of the Kanwar Yatra.
Supply, installation, testing and commissioning of 18 watt LED based Solar Street Lighting System with RMS including 5 years comprehensive warranty, Operation and maintenance
Construction of box culvert on Hapur Road and RCC drain up to Lohianagar Mandi Gate for drainage in Ward-36 Zahidpur Budhera.
Construction of the drain from the Lakshmi Nagar bridge to the large drain in Ward-58 using R.C.C.
WARD 89 MOH. GULJARE IBRAHIN AHMED WALI GALI AUR WARD 66 MOHALLA HARIJAN CHOWK SARAI BEHLEMM TOTAL 2 TOTAL 2 NAG 10 HP NALKOOP REBORE
Reboring of 01 H.P Mini Nalkoop. Ward 64 AUR WARD 89 TOTAL 3 NAG
ward 35 ,89,66 TOTAL 6 NAG 1 HP MINI NALKOOP INSTALLATION
ward 64 thapar nagar sthith soti ganj new market jasweer singh ke makaan se bhasin electronic tak 200 mm Dia 105 mtr sewer line laying aur 5 nag sewer mainhall work
WARD-43 GAURIPURA BALAJI MANDIR WALI GALI ME 10 HP MINI NALKOOP INSTALLATION
Laying of 110 mm dia P.V.C pipe line IN WARD 10 KASHI ACCHRONDA ROAD RAJU WELDING WALI GALI ME
WARD 23 SUBHASPURI KANKERKHERA SARDAR CHAMCCHI KA CHOWK 1 HP NALKOOP INSTALLATION WORK
WARD-82 AHMED NAGAR GALI NO 18 AUR WARD 84 GALI NO 10 ARTAJ MASJID KE CHAUPLE PAR 2 NAG 10 HP MINI NALKOOP INSTALLATION
WARD 66 RAJPUTANA CHAUPALA PAR SAIFIYO WALI PULIYA PAR NAUGAZA RAJO WALI MASJID KE NIKAT IRSHAD KE GHAR KE PASS , WARD 69 TEER GRAN ME AUR WARD 01 SHIV HARI MANDIR COLONY HAPUR ROAD RAILWAY LINE KE PASS TOATAL 5 NAG 10 HP MINI NALKOOP REBORE
WARD 31 SHATABDI NAGAR C POCKET HOUSNE NO 1181/41 , SHATABDI NAGAR , WARD 69 SHIV HARI MANDIR COLONY AND WARD 51 MALIYANA POOL KE NICHE KHAJUR WALE KE SAMNE 4 NAG HANDPUMP REBORE KA WORK
WARD 35 and ward 11 Install of handpump
ward 31 ME 2 NAG , WARD 49 ME 1 NAG TOTAL 3 NAG 1 HP MINI NALKOOP INSTALLTION
For the Supply of Repair Items Used in LED Street Lights
Integrated Development and Upgradation work of Road from Kankerkhera Flyover to Bypass Intersection Under C.M Grids Scheme
Construction of road with drain and CC from Lalit Mantri house to Mohd. Irfan house and in both the subsidiary lanes on Ward-72 Hapur Road.
Ward-62 Indranagar, from Vinod Jain house to Vishan Chowk via Shri Radhakrishna Temple and in Usha Sharma lane and from Usha Gujjar house to Rajveer Agarwal house, construction work of drain and road through CC.
Ward 87 Zakir Hussain Colony, road construction work by upgrading the road from Chandni Mehndi Art to Naveel Public School and from Liaqat house to Mohammad Tosif house and constructing drain and CC road.
Ward-80 Dhawai Nagar Gali No. 09, construction of drain and road through CC in the street from Nafees house to Rafayam School.
Ward-72 Road work through drain and CC from Thakur house to Ejaz house and in the subsidiary streets on Azad Road.
Construction of road and drain from Avon Bakery to Shakti Telecom in Street No. 4, Thapar Nagar by CC in Ward No. 64.
Ward-71 Bhumiyapul Road Construction of drain and CC road from Azad Band Road to Dr. B.R. Khan house and in the subsidiary lanes.
In ward no. 78, construction of road and drain from Nathu Pandey Wali Gali in Vaidwada and from Sambhav Jain house to Sanjay Tomar house in Raijadagan.
Construction of drain and CC road in the street from National Graphics to IR Engineering Works in Ward-85 Zakir Colony.
Construction of CC road from Ajay Kumar Mishra house to Devendra house in street no. 07, Ward-59, Jaydevi Nagar.
Construction of drain and CC road from Thakur Mahtab house to Hanif house and adjoining lanes in Ward-66 Sarai Bahlin
Ward-66 Sarai Bahlin, construction work of drain and road through CC from Kanti Halwai shop to Mahajaab Motors shop and from Takiya Wali Masjid to Umesh Ghazi house.
Construction of drain and CC road in the street from Capital School to Babu Cylinder Wale house in Ward-85 Zakir Colony.
Road construction work by CC from Q-314 to 325 and Q-326 to 337 in Ward-57 Pallavapuram Phase-02
Ward-62 Indranagar I, road construction work by upgrading drain and C.C. from Sunaar ki Dharamshala to Rajiv Verma house.
Construction of road and drain by CC from Rajkumar house to Kanta house and in the link lane in Devinagar ward-58
Road construction work by drain and CC from Khatta Road Saini Tent House to Mahesh Saini house in Ward-62 Indranagar.
Repair of drain and construction of road by C.C. in the street from On Kirana to Bhanu Pratap in front of Angad Garden in Ward 63 Pravesh Vihar.
Construction of CC road and drain from Mayur Sports to Dutta Sons and link lanes in Banshipura in Ward No. 58.
Construction of CC road from Saurabh Tel Wale to Jai Bhagwan Pansari shop in Anaj Mandi, Ward-69.
Construction of CC road from Ramveer Sharma house to Dayaram house and adjoining streets in Ward-59, Jaydevi Nagar, Street No. 07.