Loading
Loading…
Loading…
2 results • Latest
Installation of High Mast Lighting System, Including Pole and Allied Works at the Outside Rear Gate, MEPZ SEZ, Tambaram, Chennai 600 045
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth,consolidating Each deposited layer by lift upto 1.5 m
Renovation Of Well-Knit Building at MEPZ- SEZ, Tambaram, Chennai - 600 045.
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles above 25 mm and up to 40 mm