Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
550 live99 closing this weekmost from Ministry of Road Transport and Highways and Ministry Of Road Transports And Highways
550 results • Latest
Reconstruction of Bridges Major Bridge at Takera at Ch 184.200 and four Minor Bridge at Ch189.400, 190.600,191.400 and 193.200 on NH-57 in the state of Odisha on EPC mode
One time Improvement of existing left over (Bypassed) Road stretches from Km 354.531 to Km 358.842 of Kurnool - Chittoor - Ranipeta Road of NH-40 (Chittoor Town limits) in State of Andhra Pradesh on EPC mode under Annual Plan 2026-27
Rectification of 2 nos.of Blackspots at Akkammagarla temple crossing road AP (03) 248 and KLD Circle Road AP (04) 200 on NH 544DD in the State of Andhra Pradesh
Widening and Strengthening of Single and Intermediate lane to 2 Lane with paved shoulder from existing Chainage (Km 53.873 to Km 59.700) Design Chainage (Km 33.565 to Km 38.943) (Design length 5.378 km) on NH-507 in the State of Uttarakhand
Widening to 2 Lane paved shoulder from Existing Chainage 12.000 to Km 40.500 Badhwala to Lakhwar Bend Realignment from km. 12.00 to 31.122 on NH-507 Length-25.660 Km in the State of Uttarakhand on EPC Mode.
Widening to 4L PS configuration from km 6.600 to 16.300 of the Khamgaon to Shegaon section of N H 548C in the state of Maharashtra on EPC mode
widening of existing Single / Intermediate lane to 2- lane with paved shoulder from km 0.00 to km 175.00 (Tyuni to Bataghat) of NH-707Ain the State of Uttarakhand. (Length-175 km).
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from Km. 0.00 to 80.00 Ghat to Udiyari Bend of NH-309A in the State of Uttarakhand. (Length 80 km).
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from Km. 0.00 to 235.00 Jyolikot to Karanprayag of NH-109 (Old NH 87Ext) in the State of Uttarakhand.(Length- 235 km).
Consultancy services for Authoritys Engineer for supervision of Balance work of the rehabilitation and upgradation from Km 33.860 to Km 67.150 of the Naldurge to Akkalkot section of NH 652 to 2 Lane with paved shoulder configuration in the state of M
Widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (Bataghat to Maletha) on NH-707A in the State of Uttarakhand. (Length 136 km).
RFP For Construction of Gonda Bypass (western part) of NH 330B to four lane with paved shoulder configuration design length of 20.570 Km under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh
Construction of Bypass Road to Aska Town on NH-157 in the state of Odisha on EPC mode
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (Badwala to Lakhwar Bend) (realignment from km 12.00 to 31.122) on NH-507
Construction of New Major HL Bridge across River ONG at Km. 43.500 on NH-26 in the State of Odisha on EPC mode
Construction of Uni-Directional twin tunnels including approach roads across Fotu La Pass on NH-01 (Leh-Kargil Highway) in the Union Territory of Ladakh
Upgradation to 2 Lane with Paved Shoulders of Naliya Narayan Sarovar section from design km 220.773 to km 288.987 of NH 41 in the state of Gujarat on EPC mode.
Upgradation to 4 Lane with Paved Shoulders with Divided Carriageway from Design km 0.000 to km 37.087 of Pardi NH 48 Junction Sukesh Nanapondha Kaprada section of NH 848 in the state of Gujarat on Hybrid Annuity Mode.
Upgradation of Chitrod-Rapar-Balasar section of NH-927C to two-lane with paved shoulders from design km 0.00 to km 57.848 in the State of Gujarat on EPC mode.
Construction of new Major H.L. bridge utei at km. 87.900 on NH 59 in the state of Odisha on EPC mode
Construction of Proposed HL Bridge over Local Nallah at Ch 96.400 Km over Gadgadi River at Ch. 105.550 Km and Widening and Strengthening from Ch 91.720 to 91.920 Km on NH-153 (B) in the State of Odisha on EPC Mode
Construction of H.L. Major Bridge across River Songarh at Km. 97.958 and Minor Bridge at Singkhaman Km. 87.790 on Balangir-Bhawanipatana Road (NH-26) in the State of Odisha on EPC mode
Consultancy Services for AE for Supervision of Construction of a Sixlane external port connectivity road from the junction of NH65 and NH216 to Machilipatnam Port via Machilipatnam bypass section of NH216 in the state of Andhra Pradesh
CONSTRUCTION OF NEW MAJOR H.L. BRIDGE LANTH-I AT CH 113/960 Km AND LANTH -II AT CH 114/446 Km OF NH 26 IN THE STATE OF ODISHA IN EPC MODE
Landslide treatment work from Ch. 269.900 km to Ch. 270.214 km (Crown portion at Totaghati) on NH-07 (old NH-58) in the State of Uttarakhand under Annual Plan 2025-26 - under EPC mode
One Time Improvement Work of Shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on Katni Shahdol road Section of NH-43 in the State of Madhya Pradesh.
Treatment of 16 no of landslide location on NH-134 under EPC mode in the state of Uttarakhand under Annual Plan 2025-26
Construction of a new 2LPS ROB alongside the existing 2 lane ROB at km 128.400 including construction of a Vehicular Underpass at km 129/200 and flyover at km 130.220 on NH61 in the State of Maharashtra on EPC mode
Treatment of 11 No. of landslide location on (Kotdwar to Dugadda) of NH-534(old NH-119) in the State of Uttarakhand under Annual Plan 2025-26
Rehabilitation Upgradation of Four Lane road with Paved Shoulders in Hingoli Town section of NH 461B from Narsi Phata to Junction with NH 161 at Sawarkheda with Major Bridge across Kayadhu river and additional 2 lane ROB at LC No.144(B) (From KM. 94.
Upgradation to Two lane with paved shoulder of Porbandar Bhanvad Jamjodhpur Kalavad section of NH-151K from Design km 0.000 to Design km 119.500 in the State of Gujarat on HAM.
Recontruction of Minor Bridges in km 97/540 and Ch 106/600 at Abdimandi and Kagzipura respectively near Samruddhi Mahamarg on Daulatabad T point to Khultabad Road NH 752H Taluka Khultabad Dist.Chh.Sambhajinagar.
Construction of Bypass Road to Phulbani town from km. 29.800 (Design ch. 0.0) to km 38.500 (Design ch. 6.750) of NH-157 in the state of Odisha on EPC Mode
Widening and upgradation of Sirmour (Keoti) to Kalwari section of NH-135BD from Ch 10/070 to 35/920 (length 25.85 km) to 2-Lane with paved shoulder configuration in the State of Madhya Pradesh
Widening Re-Construction to Four Lane from Km 0.000 to Km 15.870 Near Miriyan Telangana Karnataka Border Chincholi Section of NH 167N in Kalaburagi District in the State of Karnataka on HAM under Annual Plan 2023 24
Construction of Bypass to the Holenarasipura Town from Km 87.280 near Chikknahalli to Km 97.580 Near Hullahalli on NH 373 in the State of Karnataka on EPC mode under NH O Annual Plan 2023 24
Construction of Iconic Hybrid Cable Stayed and Suspension Bridge Across Krishna River on NH -167K (Design Chainage km 87.360 to km 88.437) in the States of Telangana and Andhra Pradesh on Engineering, Procurement and Construction (EPC) Basis
RFP for the work of Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D (Sitapur to Kurain Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.
Construction of 2 Lane Bridge at Km 21.206 and Km 26.983 at Bargarh District on NH-26 in the State of Odisha under EPC Mode
Widening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (Koksara) to km 294.280 (Nabarangpur) on NH-26 in Kalahandi and Nabarangpur districts in the state of Odisha under the EPC mode
up gradation to Two/four lane with paved shoulder configuration of Tuljapur Naldurge Akkalkot road from Naldurge to Akkalkot of bvalance work from Ch 30.884 and ch. 70.800 of Nh 652 on EPC mode in the state of MAharashtra
Rehabilitation and upgradation of NH 548B from km 289.300 to km 342.890 Maharashtra Karnataka Border to two lane with paved shoulder configuration in the state of Maharashtra on EPC mode Total length 52.556 km
Repairs and Construction of PQC Road Damaged portion 14.1 Km from the work of Karnataka Maharashtra Border Km 70.682 to Akkalkot Km 106.526 and Strengthening of Dudhani Km 74.240 to 77.420 Maindargi Km 89.084 to 92.045 and Akkalkote Km 99.580 to
Construction of Maski Bypass Starts at existing Km 144.220 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.370 and ends at existing Km 180.800 on NH 150A in the State of Karnataka
Balance work under Risk and Cost for Up gradation of Paithan Pategaon Mungi Hatgaon Bodhegaon Ladjalgaon Ghogaspargaon Phulsangvi Ukhandachakla Dahiwandi Shirur to 2 lane with paved Shoulder 4 lane Configuration Package 55 937 Km for
Upgradation of Shahgarh Buxwaha Narsinghgarh Damoh section of NH-34 (from Ch 113/00 to Ch 176/500) to 2-LPS in the State of Madhya Pradesh on EPC Mode
abilitation Upgradation and Widening of Akola to Mahan section from km 35.265 to km 64.574 (Length 29.309 km) including construction of 4 lane with paved shoulder configuration of Barshi Takli Bypass (Length 3.160 km) on NH161A the State of Maharas
Upgradation of Existing Intermediate Lane Flexible Pavement to 2 Lane with Paved Shoulders Flexible Pavement from Km 0.000 (Orchha) To Km 75.000 (Length 75.000 Km) on Orchha Tikamgarh Shahgarh NH-539 in the State of Madhya Pradesh on EPC Mode
Rehabilitation and Upgradation to 2 4 lane with paved shoulders from Km 79.300 to Km 87.360 and Km 88.437 to Km 93.819 of NH 167K Bridge Approaches of Iconic Bridge across river Krishna in the State of Telangana and Andhra Pradesh on EPC Basis.
Construction of Four Lane with paved shoulder of Bhagalpur Kharhara Village (Dhaka More) from Km 0.000 to KM 36.600 (Total length 36.600 Km) of NH-133E in the State of Bihar on EPC mode