Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
550 live99 closing this weekmost from Ministry of Road Transport and Highways and Ministry Of Road Transports And Highways
550 results • Latest
Consultancy Services for preparation of Detailed Project Report (DPR) for Widening of existing road to 4 Lane from km 0.00 (Numaligarh) to km 106.780 (Lahorijan near Assam-Nagaland Border) on NH-129 in the State of Assam.
CONSULTANCY SERVICES FOR IE FOR 4-laning of Cuncolim to Bendordem (Including Cuncolim bypass) Section of NH-66 from km 561.480 to km 570.190 in the State of Goa on Hybrid Annuity Mode.
NH-109K from Km 29 to Km 234 Bangapani to Gwaldham to 2LPS and geometric improvement along with pavement design road safety measures treatment of landslide areas and upgradation of bridges from Km 234 to Km 296 Gwaldham to Simli in the State of UK.
Short term maintenance of Dheka To Banari road section of NH-49 from Km. 127.500 to Km. 160.687 Total Length 33.187Km 4/2Lane in the state of Chhattisgarh
Short term maintenance of Raigarh-Sarangarh-Saraipali road section of NH-216 (New 153) from Km 3.800 to Km. 25.600 (21.80km) and Km.-30.00 to Km.- 54.840 (24.840Km), Total Length 46.640Km in the state of Chhattisgarh
Short term maintenance of MasaniyakalaToRengarpali road section of NH-49 from Km. 216.334 to Km. 276.786 (60.452Km) in the state of Chhattisgarh.
SR (Special Repair) WORK of Permanent rectification of blackspots including street lights on NH-52/11
Performance Based Maintenance Contract (P.B.M.C.) work of NH from Km 52.350 to 61.750, 70.750 to 72.900, 79.350 to 83.00, 134.00 to 154.00, 154.00 to 160.00 and 161.500 to 175.00 (Length 54.700 km) on NH-707A in the state of Uttarakhand
Periodic Renewals of Armoor-Jagtial-Mancherial section of NH-63 from Km 28/000 to 31/000 Km 37/000 to 38/000 Km 41/000 to 42/000 Km 45/000 to 47/000 and 51/300 to 55/400
Special Repair to NH 305 Sainj Luhri Aut Road Km 63.00 to 94.800 in the State of Himachal Pradesh.
Special Repair to NH 305 Sainj Luhri Aut Road Km 0.00 to Km 53.00 in the State of Himachal Pradesh
Work of Special Repair SR of Bridge and Approach over Ganga River Mehandighat on NH-330D, near Kannauj city in the State of Uttar Pradesh.
SR WORKS IN LALSOT - KARAULI SECTION OF NH-23 AS DRAINAGE WORK AT SITOD AND KUDGAON VILLAGE, REPAIR AND PAINTING OF EXISITNG RAILING IN HABITATION PORTION AND DRAIN REPAIR AND CLEANING OF EXISTING DRAIN AND JUNCTION IMPROVEMENT IN THE STATE OF RAJ.
Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 Km x 364 hours; Outstation
Junction Improvement Works at LC-48 on NH325 for Road Safety in Compliance with DISHA Committee Directions in state of Rajasthan.
Short Term Maintenance Contract of NH168A from Km. 0.00 To Km. 11.800 (Length 11.80 Km) in state of Rajasthan.
Installation of Pedestrian Guard Rail (PGR) on Both Sides of NH25 at Madina Market Pachpadra-Bagundi Section in state of Rajasthan.
Development of the Descoped 530 m Stretch of NH325 from Km. 72.065 to 72.595 to Two Lane with Paved Shoulders Configuration in state of Rajasthan.
WIDENING TO 2-LANE STANDARD FROM KM 94.540 to KM 95.287, CONSTRUCTION OF A 100M PMT BRIDGE AT KM 93.425, AND TREATMENT OF TWO LANDSLIDE LOCATIONS AT NETALA AND GARAMPANI ON THE GANGOTRI-DHARASU ROAD NH-34 IN THE STATE OF UTTARAKHAND ON EPC Mode
Special repair work in Non DLP Portion of NH-752 (Baran-Aklera)
Special repair work of Const of Drain, Truck Lay bye, Service Road and Junction Improvement work on Baran Aklera Road (NH-752) in the State of Rajasthan
Construction of railing (both side) on median and Road safety works from km 256.550 to km 299 (site km 263.160 to km 306.700) on NH 52 in the state of Rajasthan
Construction of Gopalpura Mataji to Singhpura Service road Ch. 289/100 to 289/800 BHS Length (650 Mtr.) and for RCC Crash barrier and safety work from km 263/160 to km 306/700 on NH-52 in the State of Rajasthan
Supply, fixing and commissioning of road lights on existing structures (ROB at Ch 44.500 to 45.700), 4-Lane portion (ROB at Ch 70.00 to 72.00 ) and Installation of PGR and Street lights from Ch 172.700 to 173.169 of Bikaner Suratgarh Section of NH-62
Incident Management Services from Suratgarh to sriganganagar from Km 173.000 to Km 250.900 on NH-62 under Road Safety Annual Plan FY 2026-27
SR (SPECIAL REPAIR) WORK FROM KM 0/00 TO KM 86/800 (EXCLUDING ONGOING WORK IN PROGRESS AND DLP LENGTH) OF SHAHPURA-BHUGORE CIRCLE SECTION OF NH-248A IN THE STATE OF RAJASTHAN (DLP PERIOD ONE YEAR)
SR WORK PROVIDING MASTIC ASPHALT ON WORN OUT CC PORTION, CONST OF DRAIN AT VIRATNAGAR, STREET LIGHTS AT KM 106/200, KM 108/400, KM 110/500, KM 113/00, KM 123/00, KM 124/00 AND JUNCTION IMPROVEMENT SHAHPURA-NUH SECTION OF NH-248A IN THE STATE OF RAJ.
Rectification of Deck slab of Old IGNP Bridge Ch 157.838 along with strengthening of approaches on of Bikaner Suratgarh Section of NH-62 under Special Repair Annual Plan 2026-27
Const. of RCC drain at Km 228/400 240/500 250/100 and 221/300 Varda leftout of 2 km, Km 250/060 to 250/860 RHS and 1 km miscellaneous length for Banswara overlay section and reconstruction of 1 No. damaged slab culvert NH-927A at Km 260/700
Repair of slip road and drain on NH-927A (Kupda) from Km 256/00 to 257/0 and construction of RCC retaining wall at Lodha Village on NH-927A from Km 259/600 to 260/100
STMC work in KM 0.00 to 28.340, Km 38.850 to 59.000 and Km 75.250 to 114.000 of NH-333 for the year - 2026-27
Hard shoulder and interlocking block pavement work from kherwara side pkg4 end point to Do Nadi Pool and Do Nadi Pool to Dungarpur and Tijwad to NH-927A PKG-4 merging point at Km 168/600 to 170/600
Hard shoulder and interlocking block pavement work from Gowari to Panchal petrol pump Sagwara left out length 4 km
STMC work on NH-56 Old NH-113, Pratapgarh-Padi Section and Construction of 2 Lane Road in Forest Area, Km 38/100-43/040, 46/500-47/080 and 51/640-54/500, NH-113 on EPC Mode, Rajasthan
Interlocking blocks on vulnerable location Between Km 249/180 to 250/080 RHS in village Talwara and Installation of Street light, high mast light and Divider and other road safety works on NH- 927A Km. 151/400 To 256/000
Road safety works including crash barriers interlocking blocks retaining wall roadside drainage junction improvement at Barekhan Fanta and dholapani (Ch. 27/500 and 44/500), and slope stabilization from Ch. 84/0 to 85/0 on NH-56
Hard shoulders and interlocking tiles work including widening of structures and drains from Kupra Village to Banswara of NH-927A Km 257/00 to 261/00
Special Repair Work on Banwala to Kaluwala section on NH-954 from Km 31.500 to 43.400 in the state of Rajasthan
Installation of Street light, high mast light on vulnerable location and other road safety work Between Ch. 0/00 to 91/00 and Junction improvement at Ch. 27/900 to 28/300 (Ran Ghati) on NH-58E including road safety Work on NH-58E
Construction of RCC retaining wall at the junction of NH-48 and 58E including Utility Shifting
Installation of crash barrier on ghat section, interlocking blocks, retaining wall and road side drainage on vulnerable location between 0/0 to 66/000 of NH-927A
Installation of Street light, high mast light and Divider in Built-up area between Ch. 32/500 to 50/500 on NH-162A
Slope Stabilization work between 9/0 to 10/0 and 33/0 to 36/0 on NH-58E
Reconstruction of Damaged Pipe Culverts - 2 Nos. (Ch.108/000 and 127/500), Slab Culverts - 4 Nos. (Ch.113/800, 114/900, 118/600 and 127/000), and Minor Bridge at Ch. 15/900 on NH-927A
Installation of crash barrier on ghat section, interlocking blocks, retaining wall and road side drainage on vulnerable location between 66/000 to 148/0 of NH-927A
Improvement of junction, installation of street light/high mast light, construction of road side drainage etc. on accident prone locations of NH-162E km 0/000 to 88/800
SR (Special Repair) work of Construction of drain at Chand Khothi (29.0), Thirpali Badi (32.0), Dulania (Ch 48.0) and at Pepli (55.500)
PREPARATION OF DPR AND PRECONSTRUCTION SERVICES FOR UPGRADATION OF NH 501 FROM ALSTOP JUNCTION ON NH 44 KHANABAL PAHALGAM ROAD FROM EXISTING 2L/4L TO 4L WITH PS UP TO PAHALGAM AND SPURS TO ACHHABAL AND BIJBEHARA IN THE UT OF JAMMU AND KASHMIR.
Special Repair Work of NH 139W from AIIMS Golambar Km 0.000 to starting point of Patli Path Km 2.300 during 2026 27 in the State of Bihar.
SR (Special Repair) work of Construction of RCC drain in Nani(Ch.14.455-19463) Laxmangarh (Ch. 371.000), Ratangarh Circle (Ch. 433.570) and Shri Dungargarh (492.400) Shri Dungargarh Circle (Ch. 493.650), Ghassu (Ch. 368.150)on NH-52/11