Loading…
Loading…
7 results • Latest
Civil Work
Dismantling birick work or stone work in line or cement mortar and in including stacking or materials as directed by the Engineer- in- charge with in a distance of 60 meter (200 feet) item No. 692 SOR 2022
Civil Work
CIVIL WORK Dismantling birick work or stone work in line or cement mortar and in including stacking or materials as directed by the Engineer- in- charge with in a distance of 60 meter (200 feet) item No. 692 SOR 2022
Civil Work
Cleaning of under ground sump, Over Head R.C.C. Tank (independent staging) including disposal of slit and rubbish, all as per direction of Engineer-in-Charge. The cleaning shall consist following operations:- (i) Tank shall be emptied of water by pumping & bottom shall be cleaned of silt and other deposits. (ii) Entire surface area of the sump shall then scrubbed thoroughly with wire brush etc. and pressure washed with water. (iii) Chlorination of RCC internal surface by liquid chlorine. (iv) The treated surface shall be dried and all loose particles shall be removle from the surface. RATE-NN Mbd App. Rates
Civil Work
Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M, and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M from the foundaiton trenches. (Where machine can not reach/move). For Building work only. (SOR 251)/2022
Civil Work
Sector 01 - Sewer Line Excavatiing trenches of required width for pipes, cables, etc.including excavation for sockets, depth upto 1.5mt including getting out the excavated materilas returning the soil as pequired in layers not exceeding 20cm in depth, including consolidating each deposited layers by ramming, watering etc. and dispositing of surplus exacavated soil as directed within a lead of 50m. Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm D.S.R. 2023 Item No. 2.10.1.3
Civil Work
SECTOR 01 Part A- Roads Works Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. D.S.R. 2023 Item No. 2.31