Loading…
Loading…
Found 7 active tenders
7 results • Latest
Hiring of 01 no. Multipurpose Fire Tender along with manpower to man the three shifts per day, round the clock, throughout the year. Every shift shall be manned with 06 (six) trained manpower round the clock for a Period of 07 (Seven) Years at MPA
Select, Excess (+), Less (-) Less (-)
Replacing the old, damaged Chain Link, G.I. Sheets fencing with new PVC coated G.I. Chain link fencing and other miscellaneous works for the tennis court at Port Guest House, Headland
Dismantling of old G.I. Sheets, Chain Link fencing, M.S. bars, including cutting, providing scafolding, loading, transporting to MPA MM Stores, Baina, unloading, weighing and stacking as directed etc. complete . All tools, plants labour, materials etc. complete.
Proposed waterproofing of the terrace of SAARASI, A.O. Building at Headland, Sada
For Terrace Waterproofing (i) Surface Preparation Remove existing membrane from slab surface. Clean the surface thoroughly using a water jet pump. Ensure the surface is completely dust free. (ii) Crack Treatment For hairline cracks, open the cracks and fill with suitable crack filler powder. (iii) Remove defective plaster.(Wherever required)Approx 10% of total area Remove all loose and unsound plaster. Apply one coat of acrylic bonding agent mixed with cement slurry as a bond coat. Refill the prepared area by placing shrinkage-compensated, pourable micro concrete for filling damaged slab portions (iv) Waterproofing Treatment Providing and applying first coat of acrylic bonding agent mixed with water and cement in the ratio 1:2:5 (Bonding Agent : Water : Cement) as a slurry coat over the prepared surface. Laying 45 GSM fiber mesh uniformly into the wet slurry. Applying second coat of acrylic bonding agent with cement slurry in the same mix ratio to fully embed the mesh. Allow drying for 3 – 6 hours between coats. Providing and applying two coats of single-component, acrylic-based, ready-to-use waterproofing, and UV stable coating system over the prepared surface, ensuring uniform coverage and proper curing. Make: Upgrade, Fosroc, or equivalent approved make.
Providing and fixing Chainlink fencing from old gate no.1 to new gate no.1 near new cruise Terminal at Harbour
Dismantling asphalting concrete road/paving surfaces including clearing and disposing the dismantled material at places within a lead of 100m, cleaning the base surface etc. As directed. All labour and material complete.
Private 5G solution implementation and installation at Mormugao Port Authority
Hiring of 3 Nos. Diesel powered Locomotives of capacity 1350/1400 HP or above with creep facility with operational and maintenance staff for operation at Mormugao Port Authority for a period of 5 years
Monthly hire charges for the 1st year