Loading…
Loading…
887 results • Latest
Road
C.C. (1:3:6)) in foundation using 40 mm size hg metal free from weathered skin and all foreign materials including cost, conveyance to site, royalty, etc. all taxes of all materials, cost of all labour & curing charges, Cess ,etc, complete.
Bore well
Supplying all labour and drilling a perfectly vertyical bore holes in boulder formation areas with down the hole hammer drilling rigs or combination drilling rigs to suit the site condition with deployment of rig, necessarey accessories and consumables for a specified depth below ground level including supply of necessary casing shoes, odex tools and plants, jointing materials , welding extra sockets where required withdrawing pipes, lowering the MS ERW pipes and fitting and fixing in perfectly vertical position including cutting and welding for jointing the pipes for simultaneous casing lowering in over burden boulder formation till encounter of hard rocks & to drill 150mm DTH upto the desired as may be necessary clearing the sites and washing bore etc all complete. 200mm dia. Bore well (ODEX Method) a) up to mtr
Road with drain
Dismentling & removing Paving Blcok on flloring including atacking the useful stones for re-use and removing the debris within 50m lead
Drain
Earthwork in excavation of foundation in Hard soil including dressing and levelling the bed to required depth and width and deposting the excavated materials away from work site as directed by Engineer in charge.
Boundary wall
Earthwork in excavation of foundation in all kinds of soil including dressing and levelling the bed to required depth and width and deposting the excavated materials away from work site as directed by Engineer in charge.
Building
Earthwork in excavation of foundation in Hard soil including dressing and levelling the bed to required depth and width and deposting the excavated materials of a distance of 50m more thanaway from the area of excavation with all lead and lift including shoring shuttering and dewatering if necessary etc complete as directed by Engineer in charge.