Loading…
Loading…
13 results • Latest
for repaire and paint 4.5 cubic meter and 1.1 cubic meter distubeen
Laying and Jointing PVC Pipe. Heading
3. Colored interlocking tiles on the sidewalk along the canal in front of the Municipal Corporation Roorkee office.
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material,labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203. SOR - 2-2
1. Colored interlocking tiles for the vending zone at Kaliyar Adda within the limits of Municipal Corporation Roorkee.
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material,labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203. SOR - 2-2
2. Road construction on S. 1 near Vinayak Kunj, Ward No. 14.
Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. Cement Concrete
Installation of street nameplates for identification on all sub-drains in Ward No. 14.
Earth work in excavation by mechanical means (Hydraulic excavator) I manual means in foundation trenches or drains (not exceeding 1 . 5 m in width or 1 0 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
3. Road construction from Mahesh Pundir house to Rajpal Saini house in Shivpuram Gali No. 10, Ward No. 14.
Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202.Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 Cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m,stacking serviceable and unserviceable materials separately