Loading…
Loading…
7 results • Latest
Road surfacing work by hot mix on damaged roads in various wards under nagar nigam area phase 2
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.Using Gravel mix soil
Beautification of Subhash Park at Ward 03 Transit Camp in Rudrapur under Devbhoomi rajat jaynti.
Select, Excess (+), Less (-) Less (-)
construction of roads using hot mix in various wards under nagar nigam area phase 1
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.Using Gravel mix soil
Construction of drains and culverts in ward 38 from Rajkumar khanijo Hotel to ramesh kalra house.
Dismantling Brick/Tile Work Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.Cement mortar
Construction of tin shed, CC road, drainage system in the vegetable market located in Ward 28
item no. 1.01 to 1.14 is DSR item and item no. 1.15 to 1.23 is SOR item
Construction of Boundary Wall and Gate at Nagar Nigam Rudrapur
item no. 1.01 to 1.24 is DSR and 1.25 to 1.29 is Non-Schedule item