Loading…
Loading…
2,647 results • Recent activity
Providing, Supplying and laying Drainage line in Visha faliya Masjid Gully at Ankleshwar. (4th Call)
1.Construction Work Of Pump Room At Navapura Area Opposite Waghnath Temple At Vaghodiya. 2. Supplying, Lowering, laying and jointing of 110mm dia. 6 Kg/Sq.cm PVC Pipe at Navapura Area Opposite Waghnath Temple At Vaghodiya. 3. Drilling of tubewell by D.R.Method at Navapura Area Opposite Waghnath Temple At Vaghodiya. (Fourth Attempt )
Construction Of New Manhole Near Kabarasthan At Gam Talav In Waghodiya. (Fourth Attempt )
Construction Of Paver Block From Jay Ambe Cross Road Towards Vagnath Mandir At Vagodiya. (Fourth Attempt )
1. ALL MONUMENTS/ SCULPTURES BEAUTIFICATION Front Side Of Nagar Palika. 2. CITY WALL BEAUTIFICATION WORK IN WAGHODIYA NAGAR PALIKA. 3. Toilet/urinal decoration work in Waghodiya Nagar Palika. (THIRD ATTEMPT)
1. Cleaning Work in Domestic Area in Waghodiya Nagar Palika. 2. Cleaning Work in Commercial Area in Waghodiya Nagar Palika. 3. Toilet Block Work in Waghodiya Nagar Palika. (THIRD ATTEMPT)