Loading…
Loading…
Tender Value
₹4.9 L
EMD Value
₹5,000
Closing Date
30 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief Officer, VAGHODIYA NAGARPALIKA
Construction Of New Manhole Near Kabarasthan At Gam Talav In Waghodiya. (Fourth Attempt )
285526
1 of 2025-26
Open
Civil - All
Vadodara
1 document required · 1 mandatory
₹708
CHIEF OFFICER, VAGHODIYA NAGARPALIKA, VAGHODIYA
₹5,000
12 Mar 2026
12 Mar 2026
12 Mar 2026
30 Mar 2026
12 Mar 2026
NAME OF WORK :- Construction Of New Manhole Near Kabarasthan At Gam Talav In Waghodiya.
No. Description Quantity Total Per Amount
Excavation for pipeline trenches for water supply,
sewerage line, manhole etc. incl. all with shoring and
struting if required as per required gradient and line
including safety provisions using site rails and stacking
excavated stuff including upto all required lead cleaning
the site etc. complete for all lifts and strata as specified.
In Soft Rock And Masonry in CM or LM or Lime Concrete -
In Soft Rock And Masonry in CM or LM or Lime Concrete -
In Soft Rock And Masonry in CM or LM or Lime Concrete -
In Soft Rock And Masonry in CM or LM or Lime Concrete -
2 Provding and casting in situ mass cement concrete in
grade M-10 (approx. corresp. Tp prop. 1:3:6) using granite
quartzite trap metal of size 12 mm to 25 mm incl.
consolidation curing etc 19.20 3972.00 Cu.M.
Providing and casting in situ C.C in grade M-15 (Approx.
corresp to prop. 1:2:4) (proportions as per mix design or
as per Table 9 of IS456 2000 in masses by weigh batching)
Using granite, quartzite trap metal of size 6 mm to 20mm
for RCC work, including scaffolding centering, form work,
needle vibrated consolidation, curing comp. up to meter
depth or height (excluding cost of reinforcement and
neat finishing) with centering and shuttering/deshuttering
etc. comp. for structure for other than watering.
4 Refilling the pipeline trenches incl. ramming, watering,
consolidating, disposal of surplus stuff as directed within a
radius of 3 Km. 137.80 22.00 Cu.M.
Providing and constructing sewer manhole, scraper
manholes and unit house connection chamber as per type
design in brick masonry in C.M. 1:5 and inside and outside
20mm thick plastering in C.M. 1:3 necessary 100mm
coping with reinforcement in R.C.C. N 200 fixing CI steps
and fixing manhole frame and cover(But excluding supply
of manhole frame and covers) over manholes and house
connection chambers and fixing manhole cover (but
excluding supply of manhole fram and covers) over
scraper manhole etc. complete as per latest CPHEEO
manual.(excl Excavation).
1. Scraper manhole type "S2" as below but upto 2.5m
depth - 48103 per no. 1.00 52319.00 No.
2. Extra Depth beyound 2.5m and upto 9.0m depth for
type "S2" scraper manhole above. - for 7 mtr depth 4.50 31907.00 rtm
6 R.C.C. precast manhole, frame and cover, manufacture,
supply and delivery at store or site of work precast R.C.C.
frame and cover (M200), suitable to drainage manhole
and as per type design and drawing including cost of
reinforcement, MS angles or flat, curing, mold work
> Frame 1.00 1121.00 Nos.
> Cover 1.00 1173.00 Nos.
Add 18 % GST :-
Add 2 % Contigency :-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
02. SBD.pdf
Invitation.pdf
Schedule -B.pdf
Terms and Conditions.pdf
Volume 1.pdf
Download all tender documents and submit your bid