Loading…
Loading…
8,463 results • Latest
Annual Rate contract for Erection and Maintenance work of HT/LT Line and TC Structure and Laying, Testing & Commissioning of 11/22KV underground XLPE cable with cable end termination & straight though jointing kits Work of SR No 12764390 under ND Scheme under Atali Sub Division Only under Bharuch Rural Division
Annual Rate contract for Erection and Maintenance work of HT/LT Line and TC Structure and Laying, Testing & Commissioning of 11/22KV underground XLPE cable with cable end termination & straight though jointing kits Work of Arti Drug SR No 12849979 under ND Scheme Atali Sub Division under Bharuch Rural Division
Annual Rate contract for Erection and Maintenance work of HT/LT Line and TC Structure and Laying, Testing & Commissioning of 11/22KV underground XLPE cable with cable end termination & straight though jointing kits Work Under Villages Khojbal, Nandida and Akhod under Coastal Scheme under Atali Sub Division Only under Bharuch Rural Division
Construction Box Type V.R.B. in place of damaged Pipe V.R.B at Ch.690 m on Changada Sub lateral Drain.
Constructing new Box Type V.R.B. at Ch.2150 m on Bud Tank To Sath Part-1 Drain near village Sath
Construction Box Type V.R.B. in place of damaged Pipe V.R.B at Ch.0 m on Milrampura lateral Drain.
Construction Box Type V.R.B. in place of damaged Pipe V.R.B at Ch.670 m on Milrampura lateral Drain.
New RCC and fixing paver block work at Nagmanagar to Nagamanagar sump Vaya Imran residency in and Different place in Behrampura Ward South zone
Supplying of Nibhada paththar and Repairing, ReInstate Nibhada paththar paving work at babunagar , rathod park , abadnagar area in Baherampura ward south zone
Patchwork Labour charges for hand laying hotmix material at babunagar area, rathod park area, abadnagar area and Different place in Behrampura Ward South zone